My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
03-23-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2022 1:25:51 PM
Creation date
3/29/2022 1:24:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The base bid for this project included all drainage, asphalt, and concrete improvement work. This <br />bid also included all grading necessary to facilitate the construction of the playground and shade <br />structures. The following table provides updated information on the designated funding sources <br />including American Rescue Plan Act (ARPA) and the Capital Improvement Fund (400) for the <br />proposed improvements to Rondeau Park. <br /> <br />In addition to the Rondeau Park Improvement bids, staff has received a quote from St. Croix <br />Recreation (the same company that the playground equipment was purchased from) for the <br />poured-in-place (PIP) rubber surfacing. Poured-in-place rubber surfacing offers one of the best <br />surfaces for ADA accessibility and longevity. The attached quote utilized state contract pricing <br />and includes a discount since we will be utilizing the same company as the playground <br />equipment and they will already be on site. Utilizing the same company will also benefit project <br />coordination. <br /> <br />Item Total Bid Funding Source <br />Site Improvements (Sunram Construction) $139,166.96 ARPA <br />Picnic Structure & Install (St. Croix Rec) $47,631.60 ARPA <br />Playground Equipment & Surfacing (St. Croix Rec) $148,000 ARPA <br />Playground Surfacing (St. Croix Rec) $119,470 ARPA <br />Concrete and Installation for Playground Posts $5,000 ARPA <br />Lighting $15,000 ARPA <br />Construction Staking & Oversight (Bolton & Menk) $7,500 ARPA <br />Materials Testing $5,000 ARPA <br />Project Contingency $20,000 ARPA <br />Bike Racks, Benches, Picnic Tables, Drinking Fountain <br />(City Staff Install) $19,950 <br />Fund 400 (likely not <br />ARPA eligible due to <br />purchasing <br />requirements) <br />Basketball Court Resurfacing $3,500 <br />Fund 400 (likely not <br />ARPA eligible due to <br />purchasing <br />requirements) <br />Total (ARPA - $506,768.56 | Fund 400 - $23,450) $530,218.56 <br /> <br />SOURCE OF FUNDS: <br />The Rondeau Park improvements will be funded through the American Rescue Plan Act funds <br />(ARPA) and the City’s General Capital Improvement Fund (400). Staff recommends utilizing <br />ARPA funds of $506,768.56 and General Capital Improvement Funds of $23,450.00. The first <br />half of ARPA funds that the City received totaled $533,786.39. <br />
The URL can be used to link to this page
Your browser does not support the video tag.