Laserfiche WebLink
ITEM SPEC. <br />NO. REF.ITEM DESCRIPTION UNIT QTY.UNIT PRICE TOTAL PRICE <br />ORIGINAL CONTRACT <br />7 2331.604 RECLAIM FULL DEPTH PAVEMENT SY 3600.00 $2.00 $7,200.00 <br />8 2211.501 AGGREGATE BASE CLASS 5, BASE CORRECTION TON 256.00 $20.00 $5,120.00 <br />9 2350.501 TYPE MV4 WEAR COURSE MIXTURE TON 346.50 $85.00 $29,452.50 <br />10 2350.502 TYPE LV3 NON WEARING COURSE MIXTURE (BASE)TON 445.50 $75.00 $33,412.50 <br />11 2506.522 ADD 1 FT SECTION - STORM EACH 1.00 $1,200.00 $1,200.00 <br />12 2506.522 ADJUST FRAME AND RING CASTING EACH 5.00 $650.00 $3,250.00 <br />13 2506.522 ADJUST FRAME AND RING CASTING (SANITARY W/CHIMNEY SEAL)EACH 5.00 $850.00 $4,250.00 <br />14 2504.602 ADJUST VALVE BOX EACH 4.00 $150.00 $600.00 <br />15 2531.501 CONCRETE CURB & GUTTER SURMOUNTABLE LF 730.00 $18.00 $13,140.00 <br />16 2563.601 TRAFFIC CONTROL LS 1.00 $1,000.00 $1,000.00 <br />17 2573.530 INLET PROTECTION (WIMCO)EACH 5.00 $227.53 $1,137.65 <br />18 2573.602 INLET SEDIMENT REMOVAL EACH 5.00 $132.26 $661.30 <br />19 2575.505 SEEDING SY 60.00 $5.00 $300.00 <br />20 SPEC VALVE/FITTING BOLT REPLACEMENT EACH 4.00 $1,400.00 $5,600.00 <br />21 SPEC GRADATION TEST, CLASS 5 EACH 1.00 $120.00 $120.00 <br />22 SPEC PROCTOR TEST, CLASS 5 EACH 1.00 $150.00 $150.00 <br />23 SPEC DENSITY TEST, IN PLACE EACH 10.00 $80.00 $0.00 <br />24 SPEC CONCRETE TESTING, CYLINDERS (SET OF 3)EACH 2.00 $300.00 $600.00 <br />25 SPEC NUCLEAR BITUMINOUS DENSITY EACH 6.00 $75.00 $450.00 <br />26 SPEC EXTRACTION/GRADATION EACH 2.00 $150.00 $300.00 <br />27 SPEC AIR VOIDS EACH 2.00 $150.00 $300.00 <br />SCHEDULE 2.0 - DEMONT AVENUE -- TOTAL $138,457.45 <br />10% Contingency $13,845.75 <br />Construction Subtotal $152,303.20 <br />25% Engineering & Overhead $38,075.80 <br />DEMONT AVENUE PROJECT TOTAL $190,378.99 <br />SCHEDULE 3.0 - MORRISON AVENUE <br />1 2021.501 MOBILIZATION LS 1.00 $10,000.00 $10,000.00 <br />2 2104.501 REMOVE CONCRETE CURB & GUTTER LF 830.00 $8.00 $6,640.00 <br />3 2105.525 TOPSOIL BORROW CY 10.00 $23.00 $230.00 <br />4 2105.67 SUBGRADE CORRECTION CY 52.00 $20.00 $1,040.00 <br />5 2112.604 BASE PREPARATION SY 1560.00 $2.00 $3,120.00 <br />6 2123.610 EXPLORATORY DIG HR 3.00 $1,135.00 $3,405.00 <br />7 2211.501 AGGREGATE BASE CLASS 5, BASE CORRECTION TON 256.00 $20.00 $5,120.00 <br />8 2231.604 BITUMINOUS PATCH SPECIAL SY 260.00 $15.00 $3,900.00 <br />9 2232.501 MILL BITUMINOUS PAVEMENT SY 2654.00 $2.00 $5,308.00 <br />10 2331.604 RECLAIM FULL DEPTH PAVEMENT SY 1560.00 $2.00 $3,120.00 <br />11 2350.501 TYPE MV4 WEAR COURSE MIXTURE TON 521.48 $85.00 $44,326.01 <br />12 2350.502 TYPE LV3 NON WEARING COURSE MIXTURE (BASE)TON 193.05 $75.00 $14,478.75 <br />13 2506.522 ADJUST FRAME AND RING CASTING EACH 14.00 $650.00 $9,100.00 <br />14 2506.522 ADJUST FRAME AND RING CASTING (SANITARY W/CHIMNEY SEAL)EACH 5.00 $850.00 $4,250.00 <br />15 2504.602 ADJUST VALVE BOX EACH 3.00 $150.00 $450.00 <br />2 OF 3