My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2022 Workshop Minutes
>
City Council Meeting Minutes
>
2020-2029
>
2022
>
08-10-2022 Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:49:54 PM
Creation date
9/9/2022 3:49:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKSHOP MINUTES <br />CITY COUNCIL <br />AUGUST 10, 2022 <br />is compared to Schletty Drive. The City Engineer showed that the roadway of the Schletty Drive <br />cul-de-sac is about ten feet lower than the high spot of the existing property at 0 Edgerton Street. <br />McGraw asked the City Engineer about his concerns and if they have been addressed. The City <br />Engineer stated that this is a difficult site to develop, but explained that with engineering there is <br />always a solution, it just depends on how much it will cost. He stated that from an engineering <br />standpoint, he feels they can solve all of the issues of the site. He explained that with a <br />development like this, a long-term maintenance agreement and a homeowner's association would <br />be required. McGraw asked if Ramsey County has reviewed this proposal. The City <br />Administrator stated that Ramsey County Public Works has reviewed and approved the <br />preliminary site plan and the location of the intersection with Edgerton. He explained that <br />Ramsey County will also review the Final Plat and right-of-way area along Edgerton Street. <br />Council Member Miller stated that she wants to make sure the City has done its due diligence to <br />ensure the water runoff is not affecting other properties. The City Engineer stated that once the <br />soil borings have been completed, a stormwater modeling report will be provided. Fischer asked <br />if there was some sort of simplified model that can be easily seen and understood. The City <br />Engineer stated that Bolton & Menk can provide this and he will bring something back for the <br />preliminary plat review. McGraw asked what condition the culvert pipe is in. The Public Works <br />Director stated the pipe is not easily seen right now but the pipe can be checked with a camera. <br />If needed, the developer may be required to replace the pipe. <br />There being no further business, the meeting was adjourned at 7:20 p.m. <br />John ' cis, Mayor <br />Attest: <br />Christoph r Heine n, City Administrator <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.