Laserfiche WebLink
CITY OF LITTLE CANADASPRUCE STREET IMPROVEMENTS - PRELIMINARY COST ESTIMATEBMI PROJECT NUMBER: 0N1.1279959/21/2022QUANTITYAMOUNTSPRUCE STREETUNITCOSTITEM NO.MNDOT SPEC.NODESCRIPTIONNOTES UNIT28 2504.602 REMOVE AND REPLACE HYDRANT & VALVE BOLTSEACH $2,500.00 2$5,000.0029 2504.602 REMOVE AND REPLACE GATE VALVE BOLTSEACH $2,500.00 2$5,000.0030 2504.602 REMOVE AND REPLACE FITTING BOLTSEACH $2,500.00 4$10,000.0031 2504.602 REMOVE & REPLACE GATE VALVE BOXEACH $1,400.00 4$5,600.00$25,600$3,840$29,440$5,299$34,73932 2104.502 REMOVE CASTING & RINGS (STORM)EACH $350.00 2$700.0033 2503.602 2'X3' CB RING SEAL (FLEX-SEAL)EACH $850.00 2$1,700.0034 2506.602 NEW RINGS AND CASTING (STORM)EACH $1,250.00 2$2,500.0035 2506.602 PATCH DOGHOUSE (STORM)EACH $150.00 2$300.0036 2506.602 PATCH INVERT (STORM)EACH $200.00 2$400.0037 2506.602 INSTALL DRAINAGE STRUCTURE AT LOW POINTLS $20,000.00 1$20,000.00$25,600$3,840$29,440$5,299$34,739PROJECT SUBTOTALS (CONSTRUCTION ONLY)PART "1" - STREETS$184,220PART "2" - SANITARY SEWER $2,358PART "3" - WATERMAIN $29,440PART "4" - STORM SEWER $29,440CONSTRUCTION TOTAL$245,457ENGINEERING$44,182GEOTECHNICAL$7,500PROJECT TOTAL$297,139+15% CONTINGENCYPART 3: WATERMAINPART 3: WATERMAIN - CONSTRUCTION SUBTOTAL PART 4: STORM SEWER - CONSTRUCTION TOTAL+18% ENGINEERINGPART 4: STORM SEWER - PROJECT TOTAL PART 3: WATERMAIN- CONSTRUCTION TOTAL+18% ENGINEERINGPART 3: WATERMAIN - PROJECT TOTAL PART 4: STORM SEWERPART 4: STORM SEWER - CONSTRUCTION SUBTOTAL +15% CONTINGENCY