My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
10-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 5:09:22 PM
Creation date
11/1/2022 4:57:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADASUNRISE DRIVE IMPROVEMENTS - PRELIMINARY COST ESTIMATEBMI PROJECT NUMBER: 0N1.1279959/21/2022QUANTITYAMOUNTITEM NO.MNDOT SPEC.NODESCRIPTIONNOTES UNITUNITCOSTSUNRISE DRIVE28 2504.602 REMOVE AND REPLACE HYDRANT & VALVE BOLTSEACH $2,500.00 2 $5,000.0029 2504.602 REMOVE AND REPLACE GATE VALVE BOLTSEACH $2,500.00 2 $5,000.0030 2504.602 REMOVE AND REPLACE FITTING BOLTSEACH $2,500.00 3 $7,500.0031 2504.602 REMOVE & REPLACE GATE VALVE BOXEACH $1,400.00 4 $5,600.00$23,100$3,465$26,565$4,782$31,347PROJECT SUBTOTALS (CONSTRUCTION ONLY)PART "1" - STREETS$114,394PART "2" - SANITARY SEWER $4,715PART "3" - WATERMAIN $26,565CONSTRUCTION TOTAL$145,674ENGINEERING$26,221GEOTECHNICAL$7,500PROJECT TOTAL$179,395PART 3: WATERMAIN - PROJECT TOTAL PART 3: WATERMAINPART 3: WATERMAIN - CONSTRUCTION SUBTOTAL +15% CONTINGENCYPART 3: WATERMAIN- CONSTRUCTION TOTAL+18% ENGINEERING
The URL can be used to link to this page
Your browser does not support the video tag.