Laserfiche WebLink
CITY OF LITTLE CANADASUNSET COURT IMPROVEMENTS - PRELIMINARY COST ESTIMATEBMI PROJECT NUMBER: 0N1.1279959/21/2022QUANTITYAMOUNTITEM NO.MNDOT SPEC.NODESCRIPTIONNOTES UNITUNITCOSTSUNSET COURT28 2504.602 REMOVE AND REPLACE HYDRANT & VALVE BOLTSEACH $2,500.00 3 $7,500.0029 2504.602 REMOVE AND REPLACE GATE VALVE BOLTSEACH $2,500.00 3 $7,500.0030 2504.602 REMOVE AND REPLACE FITTING BOLTSEACH $2,500.00 6 $15,000.0031 2504.602 REMOVE & REPLACE GATE VALVE BOXEACH $2,400.00 4 $9,600.00$39,600$5,940$45,540$8,197$53,73732 2104.502 REMOVE CASTING & RINGS (STORM)EACH $350.00 2 $700.0033 2503.602 2'X3' CB RING SEAL (FLEX-SEAL)LF $850.00 5 $4,250.0034 2506.602 NEW RINGS AND CASTING (STORM)EACH $1,250.00 2 $2,500.0035 2506.602 PATCH DOGHOUSE (STORM)EACH $150.00 2 $300.0036 2506.602 PATCH INVERT (STORM)EACH $200.00 2 $400.0037 2506.602 REPAIR STEP (STORM)EACH $140.00 1 $140.00$8,290$1,244$9,534$1,716$11,250PROJECT SUBTOTALS (CONSTRUCTION ONLY)PART "1" - STREETS$169,366PART "2" - SANITARY SEWER $2,760PART "3" - WATERMAIN $45,540PART "4" - STORM SEWER $9,534CONSTRUCTION TOTAL$227,200ENGINEERING$40,896GEOTECHNICAL$7,500PROJECT TOTAL$275,596PART 4: STORM SEWER - PROJECT TOTAL PART 3: WATERMAIN - PROJECT TOTAL PART 4: STORM SEWERPART 4: STORM SEWER - CONSTRUCTION SUBTOTAL +15% CONTINGENCYPART 4: STORM SEWER - CONSTRUCTION TOTAL+18% ENGINEERING+18% ENGINEERINGPART 3: WATERMAINPART 3: WATERMAIN - CONSTRUCTION SUBTOTAL +15% CONTINGENCYPART 3: WATERMAIN- CONSTRUCTION TOTAL