Laserfiche WebLink
oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />BL 20 <br />1 5 <br />2 6 <br />BL 211 <br />2 <br />BL 19 <br />1 5 <br />2 6 <br />BL 341 <br />2 <br />310+0011+0010+0011+0010+0011+0017+00 18+00 19+00 20+00 21+0016+0017+00S <br />SS >>>>>>>>>>>>||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+8010+009+8010+00>>>>>>>>>>>>>>>>>>>>|||||||||||||| <br />> <br />>>>>>>>>> <br />>> <br />| <br />|||||||||| <br />|||||||||SANMH-4 <br />SANMH-12 <br />SANMH-8 <br />SAN-STUB-3||||||||||oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh <br />FIRST ADDITIONPHASING LINEFIRST ADDITION <br />PHASING LINE <br />W-23 <br />W-10 <br />W-11 <br />HYD-9 <br />WAT-STUB-4 <br />W-22W-12 <br />W-15 <br />WAT-STUB-3 <br />W-14 W-13 <br />CS-64 CS-60 <br />CS-61CS-65 <br />CS-20 <br />CS-22 <br />CS-23 <br />CS-21 <br />CS-24 >>>W-30 <br />HYD-3 <br />W-43 <br />W-44 <br />W-38 <br />W-53 <br />895 <br />900 <br />905 <br />910 <br />915 <br />920 <br />895 <br />900 <br />905 <br />910 <br />915 <br />920 <br />8" STUB/FUTURE GATE VALVE. CONTRACTOR TO <br />INSTALL CORPORATION STOP AND 1" PVC LINE TO THE <br />SURFACE. LINES TO BE REMOVED AFTER SUCCESSFUL <br />PRESSURE AND BACTERIA TESTING AND FLUSHING.906.03908.517+00 905.73908.617+50 905.44908.618+00 905.43908.318+50 905.73908.219+00 906.07908.219+50 906.41907.720+00 906.79908.420+50 907.41909.221+00 907.29908.621+50 907.98908.522+00 <br />SANMH-4RIM: 907.56STA 16+52.47, 0.00'TYPE: 48" DIA.INV: 895.26 (N)INV: 896.26 (E)INV: 895.16 (S)- R-173315" CL V RCP <br />INV: 903.37 <br />15" CL V RCP <br />INV: 903.52 <br />64' - 8" PVC SDR-35 SSWR @ 0.40% <br />8" C900 PVC WMN <br />8" PLUG (INCIDENTAL) <br />INV:896.52 <br />8" STUB/FUTURE GATE VALVE. <br />CONTRACTOR TO INSTALL <br />CORPORATION STOP AND 1" <br />PVC LINE TO THE SURFACE. <br />LINES TO BE REMOVED AFTER <br />SUCCESSFUL PRESSURE AND <br />BACTERIA TESTING AND <br />FLUSHING. <br />89' - FUT 8" PVC SSWR @ 0.40% <br />7.5' MIN. COVER <br />K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 10/24/2022 6:46:10 PMSTREET UTILITY <br />PLAN AND <br />PROFILE <br />CU-108 <br />AS SHOWN SJH/LCW <br />KWHSJH/LCW <br />N <br />SCALE IN FEET <br />0 <br />H: <br />20 40 <br />SCALE IN FEET <br />0 <br />V: <br />5 10 <br />STREET 2 (26.0' BC-BC PRIVATE DRIVE) <br />SCALE: <br />PLAN BY: <br />DESIGN BY: <br />CHECK BY: <br />SHEET <br />WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF10/21/202259709STREET HSTREET GSTREET HMATCHLINE STA - <br />SEE SHEET - <br />15+60 <br />CU-102 <br />- MATCHLINE STA <br />- SEE SHEET <br />17+50 <br />CU-102 <br />- MATCHLINE STA <br />- SEE SHEET <br />11+00 <br />CU-105 <br />- MATCHLINE STA <br />- SEE SHEET <br />11+00 <br />CU-106 <br />FUTUREADDITION <br />FUTUREADDITION <br />NOTES: <br />1.CONTRACTOR TO INSTALL TRACER WIRE ON ALL <br />PLASTIC WATERMAIN AND SERVICES, IN <br />ACCORDANCE WITH MRWA SPECIFICATIONS. <br />FUTURE GATE VALVE <br />18" MIN. <br />SEPARATION, TYP. <br />FUTURE GATE VALVE <br />10/24/2022