My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
01-11-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 10:34:07 PM
Creation date
4/24/2023 9:08:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for the Establishment of a Stormwater Utility <br />01/05/2023 <br />Page: 5 <br /> <br /> <br /> <br />to a credit system for the private best management practices (BMPs) like stormwater ponds, <br />stormwater infiltration, rainwater harvesting, etc. <br /> <br />This administrative process will also include a database updating system that is based on building <br />permits. We typically recommend that the city building permit form include an entry for the increase <br />in impervious area that can be added to the database on a regular schedule. <br />FEES <br />We propose to complete the above work described in the Scope of Services for an hourly not-to-exceed <br />fee of $29,200. This fee includes all work described in Tasks 1 through 10 above and includes 7 separate <br />meetings as listed below. <br /> <br />• 1 Kickoff meeting <br />• 3 City staff/Committee meetings <br />• 2 City Council meetings (includes a public hearing) <br />• 1 Public educational meeting/presentation, if requested <br /> <br />If more meetings are required, our services will be provided at our regular hourly rates for the individuals <br />required to be in attendance. <br /> <br />Client: City of Little Canada Bolton & Menk, Inc. <br />Project: Establishment of a Stormwater Utility <br />Task <br />No. Work Task Description City Engineer Water Resources Engineer Water Resources Design Engineer GIS Technician Clerical Total <br />Hours <br />Total <br />Cost <br /> <br />1.0 Project Meetings and Communication 16 28 0 0 0 44 $5,500 <br />2.0 List Activities to be Funded City Task <br />3.0 Calculate Impervious Areas/Finalize GIS 0 10 40 0 0 50 $7,400 <br />4.0 Present Spreadsheet Calculations and <br />Pricing 0 8 12 0 0 20 $3,000 <br />5.0 Prepare Draft Stormwater Utility <br />Justification Report 4 32 8 0 2 46 $6,500 <br />6.0 Prepare Final Stormwater Utility <br />Justification Report 2 8 0 0 0 10 $1,400 <br />7.0 Prepare Final Stormwater Utility Ordinance City Task <br />8.0 Develop Educational Materials (Simplified) 1 6 6 0 3 16 $2,100 <br />9.0 Finalize Stormwater Utility Rate Database 4 10 0 12 0 26 $3,300 <br />10.0 Develop Administrative Processes City Task <br /> Total Hours 27 102 66 12 5 212 <br /> <br /> Total Fee $29,200
The URL can be used to link to this page
Your browser does not support the video tag.