Laserfiche WebLink
Page 2 of 13 <br /> <br />2.1. The City of Little Canada will take bids in accordance with state law and City <br />procedures. <br /> <br />2.2. The City of Little Canada will prepare an abstract of bids and a cost participation <br />summary based on the lowest responsible bidder’s proposal and will provide the <br />same to the City of Vadnais Heights. <br /> <br />2.2.1. The Project includes the installation of a new trail amenity along the <br />north side of the roadway. This trail amenity within the City of Vadnais <br />Heights will be included in the bid package as an Alternate Bid. After <br />bids are received, the City of Vadnais Heights will have sole authority to <br />determine whether the Alternate Bid for the work is awarded. Vadnais <br />Heights must provide this determination, in writing, to the City of Little <br />Canada by March 31, 2023. In the event that the Alternate Bid is not <br />awarded, Vadnais Heights will be responsible for any trail-related costs <br />already incurred by the City of Little Canada in accordance with <br />Paragraph 4. <br /> <br />2.3. The City of Little Canada City will request City of Vadnais Heights concurrence <br />to award a contract to the lowest responsible bidder. <br /> <br />2.4. The City of Little Canada will award a contract and pay the contractor from local <br />funds and be reimbursed by the City of Vadnais Heights with local and <br />Municipal State Aid funds. <br /> <br />3. Responsibility for Construction Engineering <br /> <br />3.1. The City of Little Canada shall perform or contract the performance of <br />the construction engineering for all elements of the Project. <br /> <br />4. Project Costs <br /> <br />4.1. Except as provided herein, the Cities of Little Canada and Vadnais Heights will <br />participate in the costs of construction based as follows: <br /> <br />4.1.1. Street Improvements: all costs prorated based on street centerline <br />within each jurisdiction (49% Little Canada and 51% Vadnais Heights) <br /> <br />4.1.2. Watermain Improvements: each jurisdiction is responsible for <br />improvements made to its system. The emergency watermain <br />interconnect will be shared equally (50% Little Canada and 50% Vadnais <br />Heights). <br /> <br />4.1.3. Sanitary Sewer Improvements: each jurisdiction is responsible for <br />improvements made to its system. <br /> <br />