03/25/09 {YGll 11:52 FAX 0512976817 SANDFI2S 4YACKliR RF.RCLY <br />Change Order #2 Walter Street TraiVHoffman•McNa=mare <br />Compactable fill material brought in by Schifsky. <br />Approved by Lyle for City of Little Canada and Randy Lindblom for the City of <br />Maplewood. <br />Lump Sum (East portion -approx. 120 cubic yards @ $15/cy <br />Lump Sum (West portion -approx. 120 cubic yards @ $15/cy <br />2, Draintile added along trail to handle water encountered on the site. <br />Approved by Lyle for the city of Little Canada <br />110 lineal feet @ $8.00/If <br />3. Delete two (2) of the four (4) dome panels on the handicapped ramp. <br />Approved by Randy Lindblom for the City of Maplewood. <br />Two {2) panels <br />4. Topsoil brought in by Schifsky to ftnish trail edges. <br />Lump Sum <br />5. The bituminous price increase of $2,500 that was approved as part of <br />Change Order # 1 needs to be adjusted to reflect the actual increase <br />in the price par ton of asphalt and the actual number of tons of asphalt <br />delivered to the site, based upon the load tickets submitted. The final <br />calculations aze as follows: <br />Final Ticket Tonnage = 64.28 tons <br />Price increase ($70.25/ton - 48.15/ton) _ $ 22.10/ton <br />Total Cost Increase = (64.28 tons x $22.10/ton) _ $ 1,420.59 <br />Adjustment to Change Order No. 1 ($2,500 - $1,420.59) _ $1,079.41 <br />$ 1,800.00 <br />1 800.0:0 <br />$ 3,b00.OD <br />$ 880.00 <br />($ 112.0?)) <br />$ 633.60 <br />Credit <br />($1,079.41) <br />[7j 003 <br />TOTAL CHANGE ORDER: $ 3,922.14 <br />