Laserfiche WebLink
Contractor's Application for Payment <br />Owner's Project No.: <br />Engineer's Project No.: <br />Agency's Project No.: <br />3 From 07/06/23 to 07/31/23 <br />A C D E F F1 F2 G H I J K L <br />Item Quantity Units <br />Unit Price <br />($) <br />Value of Bid Item <br />(C X E) <br />($) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />1 1.00 LUMP SUM 52,500.00 52,500.00 0.50 26,250.00 0.50 26,250.00 26,250.00 50% 26,250.00 <br />2 50.00 LIN FT 75.00 3,750.00 - - - - - 3,750.00 <br />3 1.00 EACH 150.00 150.00 - - - - - 150.00 <br />4 1,360.00 SQ YD 3.00 4,080.00 - - - - - 4,080.00 <br />5 2.00 EACH 100.00 200.00 - - - - - 200.00 <br />6 1.00 LUMP SUM 6,500.00 6,500.00 0.50 3,250.00 0.50 3,250.00 3,250.00 50% 3,250.00 <br />7 1.00 LUMP SUM 2,500.00 2,500.00 1.00 2,500.00 1.00 2,500.00 2,500.00 100% - <br />8 9.00 EACH 350.00 3,150.00 9.00 3,150.00 9.00 3,150.00 3,150.00 100% - <br />9 1.00 LUMP SUM 19,500.00 19,500.00 1.00 19,500.00 1.00 19,500.00 19,500.00 100% - <br />10 2,400.00 CU YD 20.00 48,000.00 960.00 19,200.00 1,150.00 23,000.00 23,000.00 48% 25,000.00 <br />11 550.00 CU YD 22.00 12,100.00 - - - - - 12,100.00 <br />12 850.00 CU YD 20.00 17,000.00 - - - - - 17,000.00 <br />13 850.00 CU YD 22.00 18,700.00 - - - - - 18,700.00 <br />14 140.00 CU YD 35.00 4,900.00 - - 198.00 6,930.00 6,930.00 141% (2,030.00) <br />15 3,500.00 SQ YD 1.00 3,500.00 - - - - - 3,500.00 <br />16 7.00 EACH 3,000.00 21,000.00 - - 7.00 21,000.00 21,000.00 100% - <br />17 840.00 LIN FT 25.00 21,000.00 112.00 2,800.00 411.00 10,275.00 10,275.00 49% 10,725.00 <br />18 6.00 EACH 850.00 5,100.00 - - - - - 5,100.00 <br />19 535.00 LIN FT 28.00 14,980.00 - - 473.00 13,244.00 13,244.00 88% 1,736.00 <br />20 3.00 EACH 1,950.00 5,850.00 - - 3.00 5,850.00 5,850.00 100% - <br />21 275.00 TON 150.00 41,250.00 - - - - - 41,250.00 <br />22 200.00 SQ FT 16.50 3,300.00 - - - - - 3,300.00 <br />23 45.00 SQ FT 85.00 3,825.00 - - - - - 3,825.00 <br />24 5,530.00 SQ FT 9.00 49,770.00 - - - - - 49,770.00 <br />25 420.00 LIN FT 27.00 11,340.00 - - - - - 11,340.00 <br />26 1,380.00 SQ FT 30.00 41,400.00 - - - - - 41,400.00 <br />27 300.00 SQ FT 45.50 13,650.00 - - - - - 13,650.00 <br />28 120.00 SQ FT 65.50 7,860.00 - - - - - 7,860.00 <br />29 50.00 SQ FT 75.25 3,762.50 - - - - - 3,762.50 <br />30 6.00 EACH 450.00 2,700.00 - - - - - 2,700.00 <br />31 1.00 LUMP SUM 21,500.00 21,500.00 - - 0.33 7,095.00 7,095.00 33% 14,405.00 <br />32 6.00 EACH 5,450.00 32,700.00 - - - - - 32,700.00 <br />33 150.00 LIN FT 150.00 22,500.00 - - - - - 22,500.00 <br />34 7.00 EACH 6,200.00 43,400.00 - - - - - 43,400.00 <br />35 1.00 LUMP SUM 6,500.00 6,500.00 - - 0.33 2,145.00 2,145.00 33% 4,355.00 <br />36 2.00 EACH 5,450.00 10,900.00 - - - - - 10,900.00 <br />37 1.00 LUMP SUM 3,500.00 3,500.00 - - - - - 3,500.00 <br />38 17.00 EACH 600.00 10,200.00 - - - - - 10,200.00 <br />39 11.00 EACH 1,000.00 11,000.00 - - - - - 11,000.00 <br />40 13.00 EACH 1,500.00 19,500.00 - - - - - 19,500.00 <br />41 3.00 EACH 3,000.00 9,000.00 - - - - - 9,000.00 <br />42 6.00 EACH 350.00 2,100.00 - - - - - 2,100.00 <br />43 11.00 EACH 250.00 2,750.00 - - - - - 2,750.00 <br />44 1.00 LUMP SUM 95,000.00 95,000.00 - - - - - 95,000.00 <br />45 1.00 LUMP SUM 13,600.00 13,600.00 - - - - - 13,600.00 <br />46 1.00 LUMP SUM 2,500.00 2,500.00 - - - - - 2,500.00 <br />47 710.00 LIN FT 7.50 5,325.00 - - 791.00 5,932.50 5,932.50 111% (607.50) <br />48 310.00 LIN FT 8.50 2,635.00 - - 741.00 6,298.50 6,298.50 239% (3,663.50) <br />49 575.00 LIN FT 18.00 10,350.00 - - - - - 10,350.00 <br />ELECTRICAL - SERVICE CABINET <br />ELECTRICAL - CONNECT TO EXISTING CABINET <br />ELECTRICAL - 3/4" PVC CONDUIT <br />ELECTRICAL - 1" PVC CONDUIT <br />ELECTRICAL - 1" CONDUIT HDD <br />OUTCROPPING BOULDER - LANDSCAPE <br />OUTCROPPING BOULDER - SPILLWAY <br />LANDSCAPE BOULDER <br />STEPPING STONES <br />INTERACTIVE WATER FEATURE SYSTEM COMPLETE <br />INSTALL ENTRY KIOSK (INCLUDES DISPLAY BACKING PANEL) <br />STONE MASONRY COLUMNS - ENTRY KIOSK <br />INSTALL DRINKING FOUNTAIN <br />SURFACE MOUNT SITE FURNISHINGS (FURNISHED BY <br />STONE SEAT BLOCK <br />8'x3' CONCRETE BENCH PAD - 6" THICK <br />INSTALL PICNIC SHELTER <br />STONE MASONRY COLUMNS - PICNIC SHELTER <br />DECORATIVE FENCE <br />STONE MASONRY COLUMNS - DECORATIVE FENCE <br />6" REINFORCED CONCRETE WALK, INTEGRAL COLOR <br />SPECIAL SURFACE TREATMENT 1 - SANDBLAST AND STAIN <br />SPECIAL SURFACE TREATMENT 2 - STAMP AND STAIN <br />SPECIAL SURFACE TREATMENT 3 - STAMP AND STAIN <br />CLEAR AND GRUB TREE <br />EROSION CONTROL <br />8" PVC PIPE DRAIN CLEAN OUT WITH CASTING <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) <br />6" CONCRETE PEDESTRIAN CURB RAMP <br />TRUNCATED DOMES <br />4" CONC. WALK <br />FINISH GRADING <br />PRECAST CONCRETE FOOTINGS <br />6" PERF PVC PIPE DRAIN <br />6" PVC PIPE DRAIN CLEAN OUT WITH CASTING <br />8" PVC PIPE DRAIN <br />Progress Estimate - Unit Price Work <br />City of Little Canada <br />Bolton & Menk, Inc. <br />Albrecht Company <br />Pioneer Park Improvements <br />Owner: <br />0T6.124526Engineer: <br />Contractor: <br />Project: <br />Contract: <br />Previous Estimate <br />08/01/23 <br />B <br />BASE BID <br />% of <br />Value of <br />Item <br /> (J / F) <br />(%) <br />Balance to Finish <br />(F - J) <br />($)Description <br />Work Completed <br />Materials Currently <br />Stored (not in G) <br />($) <br />Work <br />Completed <br />and Materials <br />Stored to Date <br />(H + I) <br />($) <br />Contract Information <br />Bid Item <br />No. <br />REMOVE PEDESTRIAN RAMP <br />REMOVE BITUMINOUS TRAIL (SAW CUT INCIDENTAL) <br />COMMON EXCAVATION (EV, P) <br />SELECT GRANULAR BORROW (CV, P) <br />COMMON EXCAVATION - SUBGRADE CORRECTION (EV) <br />SELECT GRANULAR BORROW - SUBGRADE CORRECTION (CV) <br />AGGREGATE BASE (CV) CLASS 5 - PLAYGROUND CONTAINERS <br />REMOVE SIGN <br />REMOVE PLAYGROUND <br />REMOVE IRRIGATION <br />Application Date:Application Period:Application No.: <br />MOBILIZATION <br />REMOVE & REPLACE CONCRETE CURB AND GUTTER <br />CONCRETE WALK, THICKENED EDGE AT PLAYGROUND <br />Unit Price <br />EJCDC C-620 Contractor's Application for Payment <br />(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 2 <br />DocuSign Envelope ID: F2C40A92-F87C-45A2-8F7F-E7549D18E2B6