Laserfiche WebLink
Contractor's Application for Payment <br />Owner's Project No.: <br />Engineer's Project No.: <br />Agency's Project No.: <br />3 From 07/06/23 to 07/31/23 <br />A C D E F F1 F2 G H I J K L <br />Item Quantity Units <br />Unit Price <br />($) <br />Value of Bid Item <br />(C X E) <br />($) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />Progress Estimate - Unit Price Work <br />City of Little Canada <br />Bolton & Menk, Inc. <br />Albrecht Company <br />Pioneer Park Improvements <br />Owner: <br />0T6.124526Engineer: <br />Contractor: <br />Project: <br />Contract: <br />Previous Estimate <br />08/01/23 <br />B <br />% of <br />Value of <br />Item <br /> (J / F) <br />(%) <br />Balance to Finish <br />(F - J) <br />($)Description <br />Work Completed <br />Materials Currently <br />Stored (not in G) <br />($) <br />Work <br />Completed <br />and Materials <br />Stored to Date <br />(H + I) <br />($) <br />Contract Information <br />Bid Item <br />No. <br />Application Date:Application Period:Application No.: <br />50 500.00 LIN FT 11.00 5,500.00 - - 371.00 4,081.00 4,081.00 74% 1,419.00 <br />51 1,500.00 LIN FT 4.00 6,000.00 - - - - - 6,000.00 <br />52 500.00 LIN FT 3.50 1,750.00 - - - - - 1,750.00 <br />53 2,700.00 LIN FT 2.00 5,400.00 - - - - - 5,400.00 <br />54 885.00 LIN FT 5.00 4,425.00 - - - - - 4,425.00 <br />55 1.00 EACH 2,500.00 2,500.00 - - - - - 2,500.00 <br />56 1.00 LUMP SUM 12,500.00 12,500.00 - - - - - 12,500.00 <br />57 1.00 EACH 2,500.00 2,500.00 - - - - - 2,500.00 <br />58 3.00 EACH 2,500.00 7,500.00 - - - - - 7,500.00 <br />59 1.00 EACH 2,000.00 2,000.00 - - - - - 2,000.00 <br />60 6.00 EACH 1,000.00 6,000.00 - - - - - 6,000.00 <br />61 3.00 EACH 6,500.00 19,500.00 - - - - - 19,500.00 <br />62 3.00 EACH 1,500.00 4,500.00 - - - - - 4,500.00 <br />63 1.00 LUMP SUM 5,000.00 5,000.00 - - - - - 5,000.00 <br />64 590.00 CU YD 32.25 19,027.50 - - - - - 19,027.50 <br />65 170.00 CU YD 32.25 5,482.50 - - - - - 5,482.50 <br />66 190.00 CU YD 36.50 6,935.00 - - - - - 6,935.00 <br />67 30.00 CU YD 90.00 2,700.00 - - - - - 2,700.00 <br />68 18.00 CU YD 175.00 3,150.00 - - - - - 3,150.00 <br />69 1,000.00 SQ FT 1.50 1,500.00 - - - - - 1,500.00 <br />70 160.00 LN FT 25.00 4,000.00 - - - - - 4,000.00 <br />71 8.00 EACH 850.00 6,800.00 - - - - - 6,800.00 <br />72 7.00 EACH 750.00 5,250.00 - - - - - 5,250.00 <br />73 48.00 EACH 60.00 2,880.00 - - - - - 2,880.00 <br />74 527.00 EACH 25.00 13,175.00 - - - - - 13,175.00 <br />75 990.00 SQ YD 12.00 11,880.00 - - - - - 11,880.00 <br />76 2,470.00 SQ YD 3.00 7,410.00 - - - - - 7,410.00 <br />77 1.00 LUMP SUM 22,500.00 22,500.00 - - - - - 22,500.00 <br />78 1.00 EACH 5,750.00 5,750.00 - - - - - 5,750.00 <br />79 5.00 EACH 172.00 860.00 - - - - - 860.00 <br />80 230.00 LN FT 50.00 11,500.00 226.00 11,300.00 226.00 11,300.00 11,300.00 98% 200.00 <br />81 150.00 LN FT 175.00 26,250.00 - - - - - 26,250.00 <br />1,010,402.50$ 87,950.00$ 171,801.00$ -$ 171,801.00$ 17% 838,601.50$ <br />82 1.00 LUMP SUM (6,500.00) (6,500.00) - - - - (6,500.00) <br />83 7.00 EACH (3,000.00) (21,000.00) - - - - (21,000.00) <br />84 1.00 LUMP SUM (3,500.00) (3,500.00) - - - - (3,500.00) <br />85 17.00 EACH (600.00) (10,200.00) - - - - (10,200.00) <br />(41,200.00)$ -$ -$ -$ -$ (41,200.00)$ <br />86 1.00 LUMP SUM 62,169.00 62,169.00 - - - - 62,169.00 <br />62,169.00$ -$ -$ -$ -$ 62,169.00$ <br />1,031,371.50$ 87,950.00$ 171,801.00$ -$ 171,801.00$ 17% 859,570.50$ <br />2" HDPE WATER SERVICE LINES <br />DECORATIVE FENCE CURB <br />SOD TYPE LAWN <br />MNDOT SEED MIX 25-151 <br />IRRIGATION SYSTEM <br />DRAINAGE MANHOLE (STO-10) <br />INFILTRATION AREA DRAIN (8" NYLOPLAST W/ DOME <br />LANDSCAPE EDGING <br />DECIDUOUS OVERSTORY TREES <br />ORNAMENTAL TREES <br />DECIDUOUS SHRUB <br />PERENNIALS/ORNAMENTAL GRASSES <br />LOAM TOPSOIL BORROW (LV) - PLANTING BEDS <br />FILTER TOPSOIL BORROW (LV) - RAIN GARDENS <br />MULCH MATERIAL TYPE 6 - SHREDDED HARDWOOD MULCH, <br />ROCK MULCH, 6" DEPTH <br />LANDSCAPE FABRIC <br />ELECTRICAL - GFCI IN COLUMNS <br />ELECTRICAL - GFCI PEDESTAL <br />ELECRICAL - HANDHOLE <br />ELECTRICAL - WATER FEATURE CONNECTION <br />COMMON TOPSOIL BORROW (LV) - TURF ESTABLISHMENT <br />ELECTRICAL - SECURITY LIGHT <br />ELECTRICAL - SECURITY CAMERA LIGHT POLE AND FOOTING <br />ELECTRICAL - INSTALL CAMERA AND GFCI ON EXISTING POLE <br />ELECTRICAL - SHELTER LIGHTS (TIMED) <br />ELECTRICAL - PUSHBUTTON FOR SHELTER LIGHTS <br />ELECTRICAL - 1-1/2" PVC CONDUIT <br />ELECTRICAL - #3 AWG COPPER CONDUCTOR <br />ELECTRICAL - #6 AWG COPPER CONDUCTOR <br />ELECTRICAL - #10 AWG COPPER CONDUCTOR <br />ELECTRICAL - FIBER CABLE <br />BASE BID TOTAL <br />TOTAL <br />CHANGE ORDER NO. 1 TOTAL <br />BASE BID + CHANGE ORDERS <br />CHANGE ORDER NO. 1 <br />REMOVE PLAYGROUND <br />PRECAST CONCRETE FOOTINGS <br />INSTALL DRINKING FOUNTAIN <br />SURFACE MOUNT SITE FURNISHINGS (FURNISHED BY <br />CHANGE ORDER NO. 2 <br />FIBER AND LIGHTING <br />CHANGE ORDER NO. 2 TOTAL <br />Unit Price <br />EJCDC C-620 Contractor's Application for Payment <br />(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.2 of 2 <br />DocuSign Envelope ID: F2C40A92-F87C-45A2-8F7F-E7549D18E2B6