My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-2023 Planning Commission Packet
>
Agenda Packets
>
2020-2029
>
2023
>
02-09-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 3:48:56 PM
Creation date
8/25/2023 3:43:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />H:\LTCANADA_CI_MN\0N1129675\2_Preliminary\C_Reports\Review Memo.docx <br /> <br />January 18, 2023 <br /> <br />Corrin Wendell <br />Community Development Director, Planner <br />City of Little Canada <br /> <br />RE: Pioneer Commons, 2nd Addition – Plan Review Comments (Civil) <br /> <br />Corrin, <br /> <br />I have reviewed the Pioneer Commons “Second Addition Streets and Utilities Buildout” plans dated <br />12/30/2022. These plans were prepared by WSB and submitted by Lennar Homes. The plans were <br />reviewed for conformance with the City’s comprehensive plan, City code, and industry standards for <br />street, utility, and stormwater management construction. Below is a comprehensive list of <br />administrative items that will need to be addressed through the development agreement as well as <br />technical comments that should be addressed in a revised final plan submittal prior to acceptance. <br /> <br />Administrative <br />• A letter of credit will be required in the amount of 125% of the estimated construction costs for <br />the public infrastructure to serve the Second Addition. The developer’s engineer can provide an <br />itemized construction cost estimate for this calculation. <br />• A cash escrow in the amount of $20,000 will be required for the Second Addition of this project. <br />The escrow will be used for consulting reviews (engineering and legal) during the final plan and <br />development agreement phase of the project. The escrow will also be used for consulting <br />oversight and inspection of public infrastructure (watermain, sanitary sewer, trails, public storm <br />sewer, stormwater management BMP’s). The cash escrow will also be used for warranty <br />inspections and associated coordination with the developer. A detailed escrow worksheet will <br />be provided in the development agreement. The City reserves the right to charge additional <br />consultant fees as needed. <br />• An as-built grading and utility plan will be required and shall be signed by a MN registered land <br />surveyor or professional engineer certifying that the grades are as shown on the final submitted <br />grading plan. A copy of the as-built requirements worksheet can be provide upon request. <br />• The developer will need to prepare an exhibit(s) that outlines which streets, utilities, trails, <br />stormwater management and other infrastructure features are deemed private versus public. <br />This figure will be included in the development agreement. <br />• Provide copies of all permits required for the 2nd Addition work (i.e. MPCA, DOH, etc.) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.