Laserfiche WebLink
Minor Subdivision Lot Split Filing Requirements: <br />1)Legal Description of land you want to divide. <br />The applicant has provided a legal description to the City as shown on the <br />application. <br />2)Proposed split line(s). Clearly identify each new parcel. <br />The applicant has provided the proposed lot line adjustment clearly identifying each <br />new parcel as shown on the certificate of survey. <br />3)Dimensions of all property lines. <br />The applicant has provided the dimensions of all property lines as shown on the <br />certificate of survey. The dimensions comply with the R-1 Low Density Residential <br />District. New lot widths for each parcel will comply with the 75 feet wide minimum R- <br />1 standard as well as the 130 feet for lot depth. <br />4)Proposed use and area of each new lot. <br />Remain single-family residential. <br />5)Existing and proposed drainage and contour plan. The City requires most new lots to <br />have drainage and utility easements located on the front and rear ten feet and the side <br />five feet of the lot. The easements must be reflected on the survey. <br />The applicant has provided a drainage and utility easements as shown on the <br />certificate of survey. The applicant complies with this standard. <br />6)Location and widths of proposed utility easements. <br />The applicant has provided utility easements as shown on the certificate of survey. <br />The applicant complies with this standard. <br />7)Existing street rights-of-way, railroad and utility rights-of-way, parks and other public <br />open space, permanent building and easements within the existing lot and adjoining <br />lots. The applicant has provided existing street rights-of-way as shown on the <br />certificate of survey. <br />8)Areas, other than street and utility easements, that you intend to dedicate for public <br />use, including their areas. There are no other areas intended for public use. <br />9)Scale of the drawing and north arrow. The applicant has provided a north arrow as <br />shown on the certificate of survey. <br />10)Certificate of Survey. The applicant has provided a certificate of survey.