My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 1 <br />W I N D O W <br />D I V I S I O N <br />www.shawstewartlumberco.com <br />645 Johnson Street NE | Minneapolis, MN 55413 <br />612.456.1222 | ajacot@shawstewart.com <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Proposal Date: 9/5/2023 <br />Project Name: Little Canada City Hall <br />515 Little Canada Rd <br />Little Canada, MN 55117 <br />Site Visit Date: 8/28/2023 <br /> <br />Description: <br />WINDOWS <br />□ Manufacturer: Marvin <br />□ Product Series: Ultimate <br />□ Glass: Low E2 with argon (Cardinal Low-E272), tempered as required by code, gray tinted glass at clearstory <br />alternates <br />□ Exterior Color: Stone white <br />□ Interior: Pine; prefinished to match existing <br />□ Hardware: Standard locking and operating hardware <br />□ Hardware color: Selected from the manufacturer’s full range <br />□ Grilles: None <br />□ Screen Surround: Bonze color extruded aluminum <br />□ Screen Material: Bright View mesh <br />□ Jamb Depth: To match existing <br />□ Installation Method: Flange or through frame <br /> <br />□ One (1) jobsite delivery <br />□ Shop drawings if desired – (48 hour turn-around) <br /> <br />INSTALLATION <br />□ Installation of Marvin Ultimate Windows at the conference room, lower level front entry, and 2x office. See <br />alternates for entry clearstory windows. <br />□ Supply and install new interior trim to match existing <br />□ Pre-finish windows and trim to match existing <br />□ Supply and install Dupont flashing tapes around windows <br />□ Installation per Marvin installation instructions (jamb fasten, nail fin) <br />□ Union Labor <br /> <br />Exclusions: <br />□ Vertical structure by others at clearstory windows. This structure is existing and will remain. New coil to cover this <br />structure by others is included. <br />□ Building permit. This cost will be added if the project moves forward. <br />□ Jobsite storage for product. Storage can be provided by others if needed. <br />□ Smoke Detectors <br />□ Special Warranties <br />□ Overtime <br />□ Landscaping <br />□ Site restoration <br />□ Any work not mentioned within this proposal <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.