My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2 <br />W I N D O W <br />D I V I S I O N <br />www.shawstewartlumberco.com <br />645 Johnson Street NE | Minneapolis, MN 55413 <br />612.456.1222 | ajacot@shawstewart.com <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Assumptions <br />□ We will have full access to our work (with our lifts) without being held up by other trades. <br />□ We do not agree to any liquidated damages. <br />□ This proposal is dependent on availability of crews at time of installation. <br />□ Job site storage is available for us to stock and store materials and a job trailer. <br />□ Any/all engineering work and cost of such is by others. <br />□ Any modifications to the scope of work will be priced as they arise. <br />□ Additional work added to our scope of work due to clarifications will impact our price. <br />□ Typical fasteners are assumed to be adequate for siding attachment. <br />□ We assume 7-3:30 working hours Monday - Friday and we did not include any overtime, weekend or night work. <br />□ Staging on site. <br />□ It is assumed a 3 day turn around for clarifications and RFIs. <br />□ All parties (including architect, owner, engineers and other consultants) are to work in an expeditiously manner to <br />provide answers, directions and clarification related to our work to prevent work slowdown and/or work stoppage due <br />to waiting for a response. <br /> <br />Lead Times: <br />Complete Manufacturing: TBD. Current lead time is 17 weeks. Lead time begins upon receipt of approved shop <br />drawings. Approximately 3 additional weeks will be required for custom-matched prefinishing. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.