My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. ALTERNATIVES CONSIDERED <br />Labore Road Corridor Study ǀ 0N1.130034 Page 6 <br />IV. ALTERNATIVES CONSIDERED <br />Based on the feedback received regarding pedestrian safety, speeding, and vehicle safety, several <br />improvements were considered during the corridor study process. Not all of the possible <br />improvements were considered feasible or effective but were documented as considerations, <br />nonetheless. A summary of all improvements considered, along with pros and cons, are included <br />in the Technical Analysis Results Open House Information in Appendix B. <br /> Roadway Reconfiguration <br />The following roadway reconfiguration options were vetted and shared with the public. <br />Each of them comes with their own specific set of pros and cons. <br />1. Option 1 – Restripe Labore Road with 10’ driving lanes and 6’ bike lanes <br /> <br />Exhibit 5 – Roadway Reconfiguration Option 1 <br /> <br />2. Option 2 – Perform Option 1 but also include an off-street sidewalk <br /> <br />Exhibit 6 – Roadway Reconfiguration Option 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.