My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. ALTERNATIVES CONSIDERED <br />Labore Road Corridor Study ǀ 0N1.130034 Page 7 <br />3. Option 3 – Narrow the roadway and include an off-street trail with boulevard <br /> <br />Exhibit 7 – Roadway Reconfiguration Option 3 <br /> <br />4. Option 4 – Narrow the roadway and include an off-street trail with no boulevard <br /> <br />Exhibit 8 – Roadway Reconfiguration Option 4 <br /> <br /> Speed Reduction and Traffic Calming <br />Several alternatives were considered feasible to reduce traffic speeds. Some of the <br />alternatives would be best-suited as additions to a roadway reconfiguration project whereas <br />other alternatives could be installed as standalone projects. Feasible traffic calming <br />measures that could be considered for implementation include the following: <br />1. Roadway Narrowing <br />2. Boulevard Tree Planting <br />3. Intersection Bump-Ins <br />4. Enhanced Speed Signage <br />5. Speed Limit Reduction <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.