My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-24-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
01-24-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2024 9:52:22 PM
Creation date
3/2/2024 9:40:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />maintenance, upkeep and repair of all public streets contained within the FINAL PLAT from <br />initiation of construction through final acceptance by the CITY. The CITY will be responsible <br />for snowplowing of interim streets that have been accepted by the CITY. DEVELOPER has <br />continued responsibility for all maintenance, upkeep and repair of all private streets contained <br />within the FINAL PLAT. <br /> <br />4.7. STREET SWEEPING. The DEVELOPER is responsible for the removal of all <br />construction debris and earth materials within the public right-of-way typically resulting from <br />new home construction activities. The CITY will inspect the roadways to ensure the <br />DEVELOPER is keeping all public roadway surfaces clean. If any portion of a public roadway <br />surface is found in an unacceptable condition, the CITY, without prior notice, will have <br />appropriate equipment dispatched to the site and all costs associated with the clean-up effort <br />will be billed to the DEVELOPER. <br /> <br />4.8. STREET SIGNS. The DEVELOPER shall be financially responsible for the <br />installation of street identification signs and non-mechanical and non-electrical traffic control <br />signs. Street signs will be in conformance with the names as indicated on the FINAL PLAT <br />and pursuant to CITY standards. The actual number and location of signs to be installed shall <br />be determined by the CITY and actual installation shall be performed by CITY authorized <br />personnel. <br /> <br />4.9. SOD. The DEVELOPER agrees that the BUILDER must pay for and install <br />cultured sod from the street curb to the rear lot line(s) of each lot in the entire FINAL PLAT. <br />For a lot where the Certificate of Occupancy is issued between August 1 and May 1 of the <br />following year, completion of the work described in this paragraph shall be completed by the <br />BUILDER by June 15, of the next succeeding calendar year; for a lot where the Certificate <br />of Occupancy is issued between May 1 and July 31, completion of the work described in this <br />paragraph shall be completed by the BUILDER by the September 15 of the year the Certificate <br />of Occupancy is issued. Notwithstanding anything to the contrary in this DEVELOPMENT <br />AGREEMENT, it is agreed that in lieu of the BUILDER installing sod on each lot, the <br />BUILDER may provide to a lot owner a certificate that entitles the lot owner to have sod <br />delivered to that lot at the owner's request for installation by the lot owner. <br /> <br />4.10. BOULEVARD AND AREA RESTORATION. The DEVELOPER shall sod <br />all boulevards within 30 days of the completion of street related improvements and restore all <br />other areas disturbed by the development grading operation in accordance with the approved <br />erosion control plan, over the entire FINAL PLAT. Upon request of the CITY ENGINEER, <br />the DEVELOPER shall remove the silt fences after grading and construction have occurred. <br /> <br />4.11. LOT CORNER MONUMENTS. The DEVELOPER shall install all <br />subdivision lot corner monumentation within one year from the date of recording the FINAL <br />PLAT, or the monumentation shall be installed on a per lot basis at the time the building permit <br />for the subject lot is issued, whichever occurs first. At the end of the one-year period from <br />recording of this DEVELOPMENT AGREEMENT, the DEVELOPER shall submit to CITY <br />ENGINEER written verification by a registered land surveyor that the required monuments <br />have been installed throughout the FINAL PLAT.
The URL can be used to link to this page
Your browser does not support the video tag.