Laserfiche WebLink
9 <br /> <br /> <br />4.12. STREET MAINTENANCE, RESTORATION, ACCESS AND REPAIR <br />DURING CONSTRUCTION. The DEVELOPER shall clear, on a daily basis, any soil, earth <br />or debris from the streets and wetlands within or adjacent to the FINAL PLAT resulting from <br />the grading or building on the land within the FINAL PLAT by the DEVELOPER or its agents, <br />and shall restore to the CITY's specifications any gravel base contaminated by mixing <br />construction or excavation debris, or earth in it, and repair to the CITY's specifications any <br />damage to bituminous surfacing resulting from the use of construction equipment. <br /> <br />Furthermore, the DEVELOPER shall maintain reasonable access to any occupied <br />buildings within the FINAL PLAT, including necessary street maintenance such as grading, <br />graveling, patching and snow removal prior to permanent street surfacing. The DEVELOPER <br />agrees to perform and assume all responsibilities relating to snow removal and ice control, if <br />the streets have not been accepted for winter maintenance by the CITY ENGINEER by <br />October 15, or later if approved by the CITY's Public Works Director. Completion of the work <br />described in the paragraph shall be completed within fifteen (15) days after notice by the CITY <br />to the DEVELOPER that repair or restoration is required. Saturday working hours for the site <br />grading/street and utility construction should start at 9:00 AM. <br /> <br />4.13. OCCUPANCY AND ACCESS. No building permit for any lot shall be issued <br />until the DEVELOPER has constructed a temporary access consisting of a bituminous surface <br />base that is acceptable in design by the CITY and the conditions on Exhibit D have been <br />followed. Three building permits for three buildings may be issued prior to roadway Class V <br />gravel base and utilities being installed, as approved by the City's Building Official and Fire <br />Marshal. <br /> <br />Except for models, no temporary certificate of occupancy for any lot shall be issued <br />until the DEVELOPER has constructed a temporary bituminous roadway that is acceptable in <br />design by the CITY and water and sanitary sewer improvements are available for use. No <br />certificate of occupancy for any lot within the FINAL PLAT shall be issued until all water and <br />sanitary sewer improvements are available for use and the first lift of street pavement has been <br />installed. Furthermore, the DEVELOPER is responsible for the construction and cost of <br />constructing any necessary temporary bituminous roadway before the public roadway is <br />constructed and shall maintain reasonable access to any occupied home or homes, including <br />necessary street maintenance prior to permanent street improvements that are accepted by the <br />CITY. <br /> <br />4.14. DRIVEWAYS. Upon building a residence on a lot, the BUILDER shall <br />construct a concrete or bituminous surface driveway for the lot in accord with CITY approved <br />standards. For a lot for which a certificate of occupancy is issued between August 1 and May <br />1 of the following year, completion of the work described in this paragraph must be completed <br />by June 15, of the succeeding calendar year; for a lot for which a certificate of occupancy is <br />issued between May 1 and July 31, completion of the work described in this paragraph shall <br />be completed by October 1 of the year in which the Certificate of Occupancy is issued. <br /> <br />4.15. VEGETATION. The DEVELOPER shall comply with CITY ordinances and