Laserfiche WebLink
Client: City of Little Canada <br />Project: 2026 Little Canada Road Improvements <br />Task No.Work Task Description Principal-In-Charge, Project ManagerTransportation Project ManagerTraffic EngineerProject EngineerWater Resources EngineerTransportation EngineerDesign EngineerStructural EngineerConstructability ManagerCommunications SpecialistNatural Resources SpecialistTransportation Planner / Cultural ResourcesWeb & Graphics DesignerFunding SpecialistSurvey ManagerSurvey Crew ChiefSurvey TechnicianAdministrative / ClericalIndirect Expense or Lump Sum FeeTotals Total Labor Costs <br />Hourly Rate $196 $211 $164 $156 $171 $174 $143 $151 $165 $134 $144 $132 $131 $159 $200 $189 $129 $121 N/A <br />Detailed Fee Estimate <br />Bolton & Menk, Inc. <br />5.0 Preliminary Design <br />5.1 Corridor & Roundabout Geometrics 4 4 8 24 70 110 $18,864 <br />5.2 Preliminary 3D Corridor Modeling 2 2 120 40 164 $25,254 <br />5.3 Sidewalk and Trail Design 2 8 24 34 $5,072 <br />5.4 Parking Lot Reconfigurations 2 2 30 30 64 $9,784 <br />5.5 Preliminary Pedestrian Box Culvert Design 2 6 30 38 $5,858 <br />5.6 City Utility Improvements/Replacements 2 8 10 $1,640 <br />5.7 Permanent and Temporary Easement Identification 12 24 36 $6,096 <br />5.8 Preliminary Project Layout 2 30 30 24 86 $13,562 <br />5.9 60% Plan Preparation and Submittal 24 16 200 30 160 430 $67,290 <br />6.0 Feasibility Report w/ Estimated Costs and Assessments 40 34 74 $13,144 <br />Subtotal Hours - Task 5 92 24 8 484 30 70 254 60 24 0 0 0 0 0 0 0 0 0 -$ 1046 $166,564 <br />2026 Little Canada Road Improvements <br />City of Little Canada, Minnesota Page 2 of 6 Detailed Fee Estimate