My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
06-24-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2024 9:08:16 PM
Creation date
7/28/2024 8:56:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client: City of Little Canada <br />Project: 2026 Little Canada Road Improvements <br />Task No.Work Task Description Principal-In-Charge, Project ManagerTransportation Project ManagerTraffic EngineerProject EngineerWater Resources EngineerTransportation EngineerDesign EngineerStructural EngineerConstructability ManagerCommunications SpecialistNatural Resources SpecialistTransportation Planner / Cultural ResourcesWeb & Graphics DesignerFunding SpecialistSurvey ManagerSurvey Crew ChiefSurvey TechnicianAdministrative / ClericalIndirect Expense or Lump Sum FeeTotals Total Labor Costs <br />Hourly Rate $196 $211 $164 $156 $171 $174 $143 $151 $165 $134 $144 $132 $131 $159 $200 $189 $129 $121 N/A <br />Detailed Fee Estimate <br />Bolton & Menk, Inc. <br />6.0 Final Design <br />6.1 Final 3D Corridor Modeling 8 40 40 88 $13,528 <br />6.2 Final Plan Preparation 60 30 350 24 60 400 70 994 $155,004 <br />Title Sheet, Legend $0 <br />General Layout Sheet / Location Plan $0 <br />SEQ and Tabulations $0 <br />Construction Notes, Standard Details $0 <br />City Standard Details, Project Specific Details $0 <br />Typical Sections $0 <br />Standard Plan Sheets $0 <br />Staging / Phasing / Traffic Control Plans $0 <br />C0 - Existing Conditions and Removals $0 <br />C1 - Private Utilities $0 <br />C2 - Erosion Control Plans & SWPPP $0 <br />C3 - Pond Grading Plans $0 <br />C4 - Watermain Plans, Sanitary Adjustments $0 <br />C5 - Storm Sewer Plans $0 <br />C6 - Street Plans $0 <br />C6 - Roundabout Design $0 <br />C6i - Intersection Details $0 <br />C7 - Signing and Striping Plan $0 <br />C7 - Signal Modification Plans $0 <br />C7 - Detailed Traffic Control Plan $0 <br />C9 - Cross Sections $0 <br />L1 - Landscaping Plans $0 <br />E1 - Electrical and Lighting Plans $0 <br />6.3 Constructability Reviews / Quality Control 4 4 50 58 $9,658 <br />6.4 Construction Cost Estimating 4 50 $8,584 <br />6.5 Project Manual & Bid Documents 20 50 20 10 16 $18,166 <br />Subtotal Hours - Task 6 96 30 0 494 24 60 460 70 60 0 0 0 0 0 0 0 0 16 -$ 1310 $204,940 <br />2026 Little Canada Road Improvements <br />City of Little Canada, Minnesota Page 3 of 6 Detailed Fee Estimate
The URL can be used to link to this page
Your browser does not support the video tag.