My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
06-24-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2024 9:08:16 PM
Creation date
7/28/2024 8:56:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client: City of Little Canada <br />Project: 2026 Little Canada Road Improvements <br />Task No.Work Task Description Principal-In-Charge, Project ManagerTransportation Project ManagerTraffic EngineerProject EngineerWater Resources EngineerTransportation EngineerDesign EngineerStructural EngineerConstructability ManagerCommunications SpecialistNatural Resources SpecialistTransportation Planner / Cultural ResourcesWeb & Graphics DesignerFunding SpecialistSurvey ManagerSurvey Crew ChiefSurvey TechnicianAdministrative / ClericalIndirect Expense or Lump Sum FeeTotals Total Labor Costs <br />Hourly Rate $196 $211 $164 $156 $171 $174 $143 $151 $165 $134 $144 $132 $131 $159 $200 $189 $129 $121 N/A <br />Detailed Fee Estimate <br />Bolton & Menk, Inc. <br />7.0 Water Resources Design & Permitting <br />7.1 Data Collection 15 15 $2,565 <br />7.2 Rate Control and Storm Drain Spread 80 80 $13,680 <br />7.3 Volume Control / Water Quality 50 50 $8,550 <br />7.4 RWMWD Permitting 60 60 $10,260 <br />7.5 Gervais Creek Crossing Design and Permitting 100 100 $17,100 <br />Subtotal Hours - Task 7 0 0 0 0 305 0 0 0 0 0 0 0 0 0 0 0 0 0 -$ 305 $52,155 <br />8.0 Environmental Review, Documentation, and Permitting <br />8.1 Level 2 Wetland Delineation & Report 1 20 21 $3,076 <br />8.2 Aquatic Resources Permitting 1 44 45 $6,532 <br />8.3 Additional Requests and TEP Meetings 1 10 11 $1,636 <br />8.4 Early Notification Memo 1 24 25 $3,364 <br />8.5 Modified Corridor Phase 1 Environmental Site Assessment 19,000$ $19,000 <br />8.6 Phase 2 Environmental Site Assessment (Excluded) <br />8.7 Noise Analysis & Reporting 4 44,000$ $44,000 <br />8.8 CatEx / Final Environmental Documentation 110 110 $14,520 <br />Subtotal Hours - Task 8 4 0 0 0 0 0 0 0 0 0 74 138 0 0 0 0 0 0 63,000$ 216 $92,128 <br />9.0 Community Engagement and Communication <br />9.1 Communication Plan 1 16 17 $2,340 <br />9.2 Property Owner Meetings (20) 30 30 60 $10,560 <br />9.3 Open Houses (3) 6 6 6 56 74 $10,882 <br />9.4 Pop Up Events (Candian Days, Cookies w/ Santa, Etc.) (3) 6 6 42 54 $7,740 <br />9.5 Website Management / GovDelivery Updates 2 2 24 20 48 $6,540 <br />9.6 Project Mailings (3) 15 18 33 $4,188 <br />9.7 Educational and Supporting Materials 48 48 $6,432 <br />9.8 Project Rendering 2 2 60 64 $8,520 <br />9.9 Project Animation 2 2 90 94 $12,450 <br />Subtotal Hours - Task 9 49 6 0 44 0 0 0 0 0 205 0 0 170 0 0 0 0 18 -$ 492 $69,652 <br />2026 Little Canada Road Improvements <br />City of Little Canada, Minnesota Page 4 of 6 Detailed Fee Estimate
The URL can be used to link to this page
Your browser does not support the video tag.