Laserfiche WebLink
<br />Proposed Budget Highlights – Engineering – Total Proposed Budget $37,350 <br />The proposed 2025 Engineering budget remains relatively flat when compared to the 2024 budget, <br />with an increase of 7.17% or $2,500 as a result of an anticipated increase in usage and development <br />of the GIS system. The largest expenditure in the contractual services budget includes $28,000 for <br />general engineering services. These services are not part of our annual Capital Improvement Plan <br />(CIP) engineering services and are used to address drainage issues, property surveys, and general <br />engineering requests. <br /> <br />2022 2023 2023 2024 2025 %$ <br />ACTUAL ACTUAL BUDGET BUDGET BUDGET Change Change <br />Contractual Services 34,992$ 79,089$ 31,100$ 34,850$ 37,350$ 7.17% 2,500$ <br />ENGINEERING DEPARTMENT (#15) <br /> Proposed Budget Highlights – Streets – Total Proposed Budget $381,809 <br />Overall, the proposed 2025 streets budget remains flat with a slight decrease of 0.07% or $259. <br /> <br />• Personnel Services is an increase of 6.43% or $12,919. This increase relates primarily to a <br />3% COLA adjustment and a 3.25% step increase for eligible employees. In addition, it <br />includes the promotion of PW Maintenance Staff to a supervisory role, a $4,712 impact. <br />Only 10% of this amount directly impacts the street budget. The remaining 90% is divided <br />between 40% Water Fund, 40% Sewer Fund, and 10% Storm Water Fund. This increase is a <br />placeholder until we determine the current supervisor’s ability to continue in the role and <br />how this position may transition over the next year. <br /> <br />• Commodities an increase of 1.52% or $1,555. Commodities include things like salt budget, <br />fuel, repair & maintenance, signs, and other operating supplies. The largest expenditure <br />within this category relates to road salt at $47,000, a 0% increase from the prior year’s <br />budget. This expenditure is recommended to remain flat since there is salt left from the <br />previous year due to a mild winter. $555 were also included for the wellness program staff <br />reimbursements in this department. <br /> <br />• Contractual Services budget is an 18.22% or $14,215 decrease from the 2024 budget. <br />There were two main categories that have been reduced. The first one relates to work crews <br />for special projects. This work crew is facilitated by the State of Minnesota Department of <br />Corrections. The current budget reduction of $7,500 is more in line with historical actual <br />trends. The second category relates to staff training. This budget has been reduced by <br />$7,350, since for 2025 the city anticipates no CDL school for any of the public works staff. <br /> <br />In addition, the City is able to maintain the budget for Street Striping and Crack filling flat due to a <br />mild winter. <br /> <br />2022 2023 2023 2024 2025 %$ <br />ACTUAL ACTUAL BUDGET BUDGET BUDGET Change Change <br />Personnel Services 196,672$ 226,678$ 215,778$ 201,026$ 213,945$ 6.43% 12,919$ <br />Commodities 93,751$ 105,585$ 92,000$ 102,500$ 104,055$ 1.52% 1,555$ <br />Contractual Services 30,961$ 46,036$ 68,680$ 78,024$ 63,810$ -18.22% (14,215)$ <br />Total 321,384$ 378,299$ 376,458$ 381,550$ 381,809$ 0.07%259$ <br />STREETS DEPARTMENT (#31) <br />