My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-27-77 Attachment Meeting
>
City Council Packets
>
1975-1979
>
1977
>
1977 Meeting Attachments
>
4-27-77 Attachment Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:31:11 PM
Creation date
9/24/2024 2:45:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`� <br />LITT►--c CANADA IMPR. 76-1 <br />IMPROVEMENT: <br />FEASIBILITY REPORT <br />WATER SUPPLY SYSTEM <br />This improvement includes the installation of 24" & 16" trunk <br />watermains, booster pump station, elevated tank and misc. <br />service connections. <br />LOCATION: The general location of the improvement is as follows: The <br />booster pump shall be located near the intersection of the <br />Soo Line R.R. and Co. Rd. "B". The elevated tank shall be <br />located in the area of Desota St. and Allen Ave. The trunk <br />lines shall be installed from the St. Paul Water Department <br />property located near Roselawn to Allen Avenue, generally <br />aligned with the Soo Line R.R. , McMenemy St. & Desoto St. <br />INITIATION: City Council <br />STATUS OF PLANS: Reports, preliminary maps and sketch plan. <br />FEASIBILITY: This project is feasible. <br />COMPLETION: If started during 1977, this project could be completed by <br />the early part of 1979. <br />REMARKS: This report includes a cost comparison of the 16" trunk line <br />located in Desoto or Vanderbie Streets. The trunk location on <br />Vanderbie could be used to serve the existing homes. <br />`■e <br />FINANCING: Cost estimates. <br />P 1 an #2 4 „c��'r' A�� <br />Construction . . . . . . . . . . . . . . . . .$1,656,800.00 <br />Contingency . . . . . . . . . . . . . . . . . . 165,700.00 <br />Legal . . . . . . . . . . . . . . . . . . . . . .279300.00 <br />Fiscal . . . . . . . . . . . . . . . . . . . . . . 27 , 300.00 <br />Administration . . . . . . . . . . . . . . . . . .18,200.00 <br />Land Acquisition. . 50, 000.00 <br />Engineering . . . . . . . . . . . . . 1829200.00 <br />TOTAL. :$i9l27$500. <br />Capital Interest (8%) 1709200.00 <br />$292979700.00 <br />Plan #1 <br />Construction. .$196209000.00 <br />Contingency 162,000.00 <br />Legal .27, 000.00 <br />Fiscal . . . . . . . . . . . . . . . . . . . . . . 27 9000. 00 <br />Administration . . . . . . . . . . . . . . . . . .18,000.00 <br />Land Acquisition . . . . . . . . . . . . . . . . .50,000.00 <br />Engineering . . . . . . . . . . 1789200.00 <br />TOTAL. .$2, 829. <br />Capital Interest (8&) 1669600.00 <br />8, 0 . <br />1070 <br />
The URL can be used to link to this page
Your browser does not support the video tag.