My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-12-78 Meeting Attachment
>
City Council Packets
>
1975-1979
>
1978
>
1978 Meeting Attachments
>
4-12-78 Meeting Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 10:19:11 PM
Creation date
9/24/2024 9:38:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. CONSTRUCTION SUPERVISION <br />This includes all time spent by the Engineer after Award of Contract <br />in performing the following tasks: resident supervision, inspection, <br />preparing change orders, "as -built'' drawings, periodic pay estimates, <br />instruction manuals, review of shop drawings, furnishing.additional <br />details as may be required to carry out the intent of the working <br />drawings and checking of the Contractor's invoices and a final.review <br />of the work upon Contractor's declaration of completion together with <br />the furnishing of a list of any found deficiencies and omissions and <br />a final certification of completion of the project. <br />B. SURVEYS <br />This includes all time spent by the Surveyor and crews setting <br />construction stakes, performing property surveys ( including legal <br />descriptions when required) and resetting monuments destroyed by <br />construction. <br />C . LEGAL <br />This includes all time spent by the Engineer in preparing assessment <br />rolls, preparing depositions, court appearances, litigation and right <br />of any work. <br />D. ADMINISTRATION <br />This includes all time spent by the Engineer in the Administration of <br />grants and loans in work not otherwise necessary except as required <br />by the grantor or lendor. It includes pre -applications, applications, <br />coordination, attendance at meetings, telephone calls, all work <br />associated with public meetings. <br />E. ENVIRON'--.1E'NTAL <br />This includes all time spent by the Engineer in writing reports, <br />research, preparing for and attending public -hearings and other meetings <br />related to the environment or environmental groups. <br />I <br />-4- �. <br />
The URL can be used to link to this page
Your browser does not support the video tag.