Laserfiche WebLink
A. CONSTRUCTION SUPERVISION <br />This includes all time spent by the Engineer after Award of Contract <br />in performing the following tasks: resident supervision, inspection, <br />preparing change orders, "as -built'' drawings, periodic pay estimates, <br />instruction manuals, review of shop drawings, furnishing.additional <br />details as may be required to carry out the intent of the working <br />drawings and checking of the Contractor's invoices and a final.review <br />of the work upon Contractor's declaration of completion together with <br />the furnishing of a list of any found deficiencies and omissions and <br />a final certification of completion of the project. <br />B. SURVEYS <br />This includes all time spent by the Surveyor and crews setting <br />construction stakes, performing property surveys ( including legal <br />descriptions when required) and resetting monuments destroyed by <br />construction. <br />C . LEGAL <br />This includes all time spent by the Engineer in preparing assessment <br />rolls, preparing depositions, court appearances, litigation and right <br />of any work. <br />D. ADMINISTRATION <br />This includes all time spent by the Engineer in the Administration of <br />grants and loans in work not otherwise necessary except as required <br />by the grantor or lendor. It includes pre -applications, applications, <br />coordination, attendance at meetings, telephone calls, all work <br />associated with public meetings. <br />E. ENVIRON'--.1E'NTAL <br />This includes all time spent by the Engineer in writing reports, <br />research, preparing for and attending public -hearings and other meetings <br />related to the environment or environmental groups. <br />I <br />-4- �. <br />