My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-12-78 Meeting Attachment
>
City Council Packets
>
1975-1979
>
1978
>
1978 Meeting Attachments
>
4-12-78 Meeting Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 10:19:11 PM
Creation date
9/24/2024 9:38:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
said specifications and plans by this reference are incorporated herein the same as <br />if set forth herein, verbatim. An existing 12-inch water main (agreement November 2, <br />1) is shown on the plan for Water main Improvement 77-5,6 and the location as <br />indicated will be considered to be the "as -built" location for purposes of this <br />agreement. <br />BE IT FURTHER AGREED, That the City will provide and install as the metering <br />device a B.I.F. Model UVTCl-181 Universal Venturi with a throat diameter of 7.25 <br />inches (for a Beta of 0.45) and a maximum flow rate of 4000 GPM or equivalent, and <br />maintenance of said meter shall be as provided in the Contract for Water Service be- <br />tween the City and Board, as executed September 14, 1970, and the City shall be re- <br />sponsible for all costs of calibration of said meter with calibration at intervals <br />not to exceed five (5) years or at the request of the Board, and <br />BE IT FURTHER AGREED, That ' the Board will perform all maintenance on the 24- <br />inch and 12-inch water mains and appurtenances, except the meter building, meter <br />building piping, and meter accessories within the premises and that the City will <br />r pT nburse the Board for said maintenance expenses; and <br />BE IT FURTHER AGREED, That the City has previously authorized the Board to pre- <br />pare plans and specifications and to construct a 24-inch water main from the south <br />property line of Roselawn Avenue south to the Board's low service reservoir and such <br />authorization was given by City resolution December 14, 1977, a copy of which is <br />annexed hereto and made a part of this agreement; and <br />BE IT FURTHER AGREED, That the City does agree to reimburse the Board for the <br />following itemized work in connection with Project Improvement 77-5,6 <br />a.) Remove and replace 320 feet of chain link fence and posts, estimate <br />$1, 675.00. <br />b.) Inspection, estimate $1,500.00 (includes main construction from line service <br />supply reservoir to terminus of construction on Board Premises). <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.