My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-07-2023 Parks_Rec Packet
>
Agenda Packets
>
2020-2029
>
2023
>
09-07-2023 Parks_Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 1:27:44 PM
Creation date
9/26/2024 1:26:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o No work on July 3 and July 4 for Holiday. <br />o Continued laying drain tile. <br />Work completed the week of August 21 – August 25 <br />o Completion of draintile installation <br />o Prep for concrete installation. <br />Work completed the week of August 28 – September 1 <br />o Finish pouring concrete sidewalk and patio for the picnic shelter. <br />o Prep for bench pads for concrete. <br />o Substantial completion of playground structure. <br />o Site grading. <br />Work scheduled for the week of September 4 – September 8 <br />o Labor Day – No work <br />o Soil correction under the water feature. <br />o Wiring for picnic shelter. <br />o Install final pieces of playground equipment <br />Work scheduled for the week of September 11- September 15 <br />o Subgrade preparation for the poured-in-place rubber surfacing (PIP surfacing <br />planned to begin September 18.
The URL can be used to link to this page
Your browser does not support the video tag.