Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />MAY 22, 1996 <br />this trail easement. <br />Mark Ashby, Stoneridge Addition developer, noted that <br />the path would be 6 feet wide by 146 feet long, and he <br />was agreeable to paving it. <br />Scalze asked about the pond area located between Lots 3 <br />and 4. <br />Ken Gust, engineer for the developer, reported that <br />this pond will collect water from the street. The <br />proper depth of the pond area must still be determined. <br />The pond must be deep enough to provide treatment for <br />the run-off, but not too deep to pose a danger. <br />Ashby reported that he has had some discussions with <br />the property owner on County Road D abutting the east <br />side of the proposed street. Ashby informed the <br />property owner he would put in a curb cut and a cement <br />apron for their driveway if the County requires them to <br />access their property via the new street. Ashby <br />reported that he will comply with the requirements of <br />the County on the curb cut issue. <br />There ~~as no one from the general public wishing to <br />comment on this matter. <br />Upon motion by LaValle, seconded by Fahey, the public <br />hearing was closed. <br />Mr. LaValle introduced the following resolution and <br />moved its adoption: <br />RESOLUTION NO. 96-5-118 - APPROVING THE PRELIMINARY <br />PLAT OF THE STONERIDGE ADDITION AS SUBMITTED SUBJECT TO <br />COMPLIANCE WITH THE RECOMMENDATIONS OF THE CITY <br />ENGINEER AS OUTLINED IN HIS MEMO DATED MAY 16, 1996, <br />SUBJECT TO COMPLIANCE WITH THE RECOMMENDATIONS OF THE <br />CITY PLANNER AS OUTLINED IN HIS REPORT DATED FEBRUARY <br />6, 1996, AND SUBJECT TO THE RECOMMENDATIONS OF THE PARK <br />& RECREATION COMMISSION AS TO PARK CHARGE AND PAVING OF <br />THE 6-FOOT WIDE PATH TO BE LOCATED BETWEEN LOTS 5 AND 6 <br />The foregoing resolution was duly seconded by Pedersen. <br />Ayes (5) LaValle, Pedersen, Morelan, Scalze, Fahey. <br />Nays (0). Resolution declared adopted. <br />Scalze asked about the variance for the street width. <br />The Planner replied that the variance is another action <br />which can be addressed at the time of Final Plat <br />approval. <br />4 <br />