My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-10 Council Special Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2010
>
06-21-10 Council Special Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2010 9:50:23 AM
Creation date
6/29/2010 9:49:54 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES Or THE SPECIAL MEETING <br /> CITY COUNCIL <br /> LITTLE CANADA, MINNESOTA <br /> JUNE 21, 2010 <br /> Pursuant to due call and notice thereof a special meeting of the City <br /> Council of Little Canada, Minnesota was convened on the 21 s~ day of <br /> June, 2010 in the Council Chambers of the City Center located at 515 <br /> Little Canada Koad in said City. <br /> Mayor Bill Blesener called the meeting to order at 630 p.m. and the <br /> following members of the City Council were present at roll call: <br /> CITY COUNCIL: Mayor Mr. Bill Blesener <br /> Council Member Mr. John Keis <br /> Council Member Mr. Mike McGraw <br /> Council Member Mr. Rick Montour <br /> ABST?N"f: Council Member Ms. Shelly Boss <br /> ALSO PRESIJNT: City Administrator Mr. Joel R. Hanson <br /> City );ngineer Mr. Lee 1?lfering <br /> City Clerk Ms. Kathy Glanzer <br /> <br /> IMP. NO. Mayor Blesener opened the public hearing to consider the improvement <br /> <br /> 2010-18 of Ontario Road (from LaBore Road to cul-de-sac) by rehabilitated <br /> ONTARIO bituminous road surface (mill and overlay) as well as repair/replacement <br /> ROAll of damaged concrete cm•b and gutter sections. <br /> The City Iingineer reported that the Ontario Koad project is being <br /> proposed at this time for a few reasons. Those include the fact that the <br /> City obtained competitive bids for the 2010 Mill & Overlay Projects, <br /> which resulted in a cost savings for the City as well as individual property <br /> owners. It is also expected that oil prices will rise in the future, which will <br /> increase costs. Ontario Road has settlement of bituminous along curb <br /> lines and cracking is becoming more severe. This project would have <br /> been proposed for 2011 or 2012, but again given the competitive prices is <br /> being proposed to move up in the schedule. 1"he 1ngineer also noted that <br /> a mill and overlay is necessary now or in the near future to prolong the <br /> sheet life and minimize higher improvement costs in the future. <br /> The L;ngineer reviewed the proposed improvements which include the mill <br /> and overlay and the re-establishment of a crown in the street. Minor curb <br /> and gutter replace is proposed and some street patching will occur in the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.