easement. Without said documentation, the site plan shall be revised to remove <br /> the garage structure. <br /> 2. If documentation allowing the garage structure within the easement area is <br /> provided, the applicant shall submit building elevations for review, subject to <br /> approval of the City Council. <br /> <br /> Some evidence appears to exist which supports the requested easement encroachment <br /> (in the form of a 1980 encroachment license with NSP). As a condition of PUD <br /> <br /> amendment approval however, updated (current) documentation should be provided <br /> <br /> from Xcel Energy which would make an allowance for the proposed building <br /> encroachment. Such documentation will be subject to review by the City Attorney. <br /> Building Height. The proposed accessory building measures 10 feet in height, well <br /> within the maximum 40 foot height requirement imposed in the I-P District. Beyond the <br /> City's minimum requirements, it should be understood that the proposed accessory <br /> structure may be subject to additional height limitations imposed by Xcel Energy. <br /> Setbacks. The location of the proposed accessory structure is consistent with that <br /> depicted upon the previously approved development plan. The structure will be setback <br /> 40 feet from Desoto Street and 15 feet from the adjacent office building to the north. <br /> Building Materials. The east fagade of accessory structure (which faces Desoto <br /> Street) is to be finished in stucco to match existing Heritage Park office buildings. In <br /> addition, the base of the elevation is to be finished in brick. The north, south and west <br /> sides of the building are to be finished in cement board siding. The applicant has <br /> indicated that building colors will match the existing office buildings. <br /> Lying beneath an overhead transmission line, it is possible that Xcel Energy may <br /> impose some additional requirements in regard to building materials, particularly in <br /> regard to the use of flammable materials. <br /> Trash. As shown on the submitted site plan, a trash storage area is proposed on the <br /> south side of the building. According to the applicant, a "trash wall" will be provided to <br /> screen trash handling equipment. As a condition of PUD amendment approval, it is <br /> suggested that a "wing wall" be extended along the south and east sides of the trash <br /> handling area. Such wall should be an extension of the accessory storage building and <br /> utilize similar finish materials. <br /> Parking Supply. As part of the City's original, 1995 review of the project, it was <br /> determined that a total of 117 off-street parking stalls are required of the office park and <br /> that 119 stalls are provided. It is staff's understanding from the applicant that the <br /> proposed building will not displace any of the originally approved parking area. As a <br /> condition of PUD amendment approval, not less than 117 off-street parking stalls must <br /> be provided upon the subject site. <br /> Future Lot Sale. As separate condominium units, it is conceivable that the <br /> garage/storage structures could be sold separately from other parts of the office project. <br /> 2 <br /> <br />