Laserfiche WebLink
C HE D L 6.' -ST D TURN LANE WORK <br />2582.502 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />52.900,00 <br />0.00 <br />80.00 <br />1.00 <br />82,90000 <br />11 2104.505 <br />8 <br />2104.501 <br />2 104.501 <br />21 04.505 <br />2104 <br />2104.513 <br />21 05,501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LE <br />275.00 <br />83.09 <br />0.00 <br />$000 <br />275,00 <br />584975 <br />REMOVE CONCRETE SIDEWALK <br />SF <br />80.00 <br />51.03 <br />0.00 <br />50.00 <br />114.00 <br />5117.42 <br />REMOVE CONCRETE PAVEMENT <br />SY <br />30,00 <br />53.61 <br />0.00 <br />50.00 <br />31.00 <br />5111.91 <br />REMOVE BITUMINOUS PAVEMENT <br />50.00 <br />77.00 <br />51.70 <br />0.00 <br />50.00 <br />117.00 <br />5198.90 <br />SAW CUT CONCRETE FULL DEPTH <br />53.09 <br />2400 <br />55.15 <br />0.00 <br />50.00 <br />43.00 <br />822145 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />lF <br />13.00 <br />82.05 <br />0.00 <br />5000 <br />69.00 <br />5142.14 <br />COMMON EXCAVATION (P <br />CY <br />115.00 <br />5024 <br />0.00 <br />5000 <br />115.00 <br />594760 <br />9 <br />2105525 <br />TOPSOIL BORROW <br />CY <br />31.00 <br />513.39 <br />0.00 <br />50.00 <br />11.00 <br />314720 <br />10 <br />2211.501 <br />AGGREGATE BASE CLASS 5, ROAD <br />TON <br />130.00 <br />59.27 <br />0.00 <br />50.00 <br />85.44 <br />8792,03 <br />767.00 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />110.00 <br />55.15 <br />0.00 <br />$0.00 <br />33.00 <br />5169.95 <br />9.00 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />11.20 <br />560.77 <br />0.00 <br />50.00 <br />20,31 <br />51,234.24 <br />88.00 <br />3900 <br />2350.502 <br />TYPE I.V3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />26.00 <br />557.68 <br />0.00 <br />50.00 <br />32,91 <br />91,090.25 <br />0.00 <br />2531.501 <br />CONCRETE CURB &GUTTER <br />LF <br />250.00 <br />59.27 <br />0.00 <br />50.00 <br />253.00 <br />52345,31 <br />0.00 <br />2531.507 <br />CONCRETE PAVEMENT <br />Y <br />155.00 <br />$47.68 <br />000 <br />50,00 <br />204.00 <br />$9,726.72 <br />0.00 <br />2521,501 <br />4' CONCRETE SIDEWALK <br />5F <br />55.00 <br />53.14 <br />0.00 <br />5000 <br />57.00 <br />5178.90 <br />0.00 <br />2531018 <br />2 503,641 <br />TRUNCATED DOMES <br />SF <br />12.00 <br />536.05 <br />0,00 <br />$0.00 <br />8.00 <br />5288.40 <br />12^ RC PIPE SEWER DES 3006, CI.V <br />LF <br />15.00 <br />920.60 <br />0.00 <br />80.00 <br />10.00 <br />5370.00 <br />44.00 <br />2505.502 <br />CONSTORAINAGE STRUCTURE DESIGN SPECIAL 24 "X35" <br />5 C <br />1.00 <br />51,215,40 <br />0.00 <br />80.00 <br />1.00 <br />51,2154 <br />20 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN 48 -4020 <br />EACH <br />1.00 <br />91.659.85 <br />0.00 <br />80.00 <br />1.00 <br />51,659.05 <br />21 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />2.00 <br />5545.90 <br />0.00 <br />80.00 <br />2.00 <br />31,091.80 <br />22 <br />25 62,502 <br />4" SOLID WHITE LINE EPDXY <br />LF <br />50,00 <br />51.03 <br />0,00 <br />50.00 <br />50.00 <br />551.50 <br />23 <br />2502.501 <br />PAVEMENT MESSAGE (RIGHT TURN ARROWI EPDXY <br />fl <br />100 <br />550.00 <br />0.00 <br />$0.00 <br />1,00 <br />550.00 <br />20 <br />2582.502 <br />4" SOLID WHITE LINE EPDXY <br />LF <br />620.00 <br />51.03 <br />0.00 <br />80.00 <br />1.58500 <br />51,632.55 <br />5500,00 <br />2 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />70.00 <br />52,05 <br />0.00 <br />50.00 <br />59.00 <br />SCHEDULE 4.0 PIONEER PARK TOTAL 50.00 546,059.11 <br />SCHEDULE 6.0. SPOONER PARK <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />5500.00 <br />0.00 <br />80.00 <br />1.00 <br />5500,00 <br />2 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />70.00 <br />52,05 <br />0.00 <br />50.00 <br />59.00 <br />5121,54 <br />3 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />2000.00 <br />51,39 <br />0.00 <br />80.00 <br />2,110.00 <br />52,932.90 <br />4 <br />2104.509 <br />REMOVE WOOD POST <br />EACH <br />10900 <br />58.24 <br />0.00 <br />50.00 <br />18100 <br />51,491.44 <br />6 <br />2104.511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />LF <br />8,00 <br />53.09 <br />0.00 <br />30.00 <br />0.00 <br />80.00 <br />6 <br />2104.513 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LF <br />90.00 <br />52.06 <br />0,00 <br />50,00 <br />93.00 <br />5191.58 <br />7 <br />2104.523 <br />SALVAGE SIGN <br />EACH <br />4.00 <br />$25.75 <br />0.00 <br />50.00 <br />4.00 <br />5103.00 <br />0 <br />2104.523 <br />SALVAGE CONCRETE PARKING STOP <br />EACH <br />44.00 <br />50.24 <br />0.00 <br />$0.00 <br />44.00 <br />3362.56 <br />9 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />600.00 <br />57.21 <br />0.00 <br />90,00 <br />767.00 <br />55.530.07 <br />10 <br />2105.501 <br />POND EXCAVATION (RAINWATER GARDEN) <br />CY <br />20.00 <br />522.66 <br />0.00 <br />50.00 <br />9.00 <br />3203.94 <br />11 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) <br />TOPSOIL BORROW <br />CY <br />CY <br />70.00 <br />75.00 <br />$16.48 <br />$13.39 <br />0,00 <br />0.00 <br />50.00 <br />50.00 <br />88.00 <br />3900 <br />81 45034 <br />5522.21 <br />17 <br />2105.525 <br />13 <br />2211.501 <br />AGGREGATE BASE CLASS 5. ROAD <br />TON <br />900.00 <br />99.00 <br />0.00 <br />50.00 <br />1,294.55 <br />51165095 <br />14 <br />2232501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />30.00 <br />50.24 <br />0.00 <br />$0.00 <br />14.00 <br />9115,36 <br />15 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />200.00 <br />559.74 <br />0.00 <br />50.00 <br />202.47 <br />512,095.56 <br />16 <br />2350.602 <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />260.00 <br />359.74 <br />0.00 <br />30.00 <br />269.72 <br />516,113.07 <br />17 <br />2531.501 <br />CONCRETE CURS GUTTER 8612 <br />LF <br />70.00 <br />$2060 <br />0.00 <br />$0.00 <br />5900 <br />51 215.40 <br />10 <br />2540.602 <br />INSTALL SALVAGED CONCRETE PARKING STOP <br />EACH <br />44.00 <br />510.30 <br />0.00 <br />50,00 <br />47.00 <br />$484.10 <br />19 <br />2540.603 <br />LANDSCAPE EDGER, STEEL <br />LF <br />60.00 <br />$6.70 <br />0.00 <br />80.00 <br />52.00 <br />3340.40 <br />20 <br />2557.603 <br />INSTALL W00DEN F E14CE <br />LF <br />30,00 <br />512.36 <br />135.40 <br />51.673.54 <br />165,40 <br />52,044,34 <br />21 <br />2563,601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />5412.00 <br />0.00 <br />$0.00 <br />1.00 <br />5412,00 <br />22 <br />2564.602 <br />INSTALL SALVAGED SIGN <br />EACH <br />4.00 <br />577.25 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />23 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />150.00 <br />$2.58 <br />000 <br />50.00 <br />15000 <br />538700 <br />24 <br />2575,513 <br />MULCH MATERIAL TYPE SPECIAL <br />CY <br />20.00 <br />530,90 <br />0.00 <br />50,00 <br />4.00 <br />512360 <br />25 <br />2575 523 <br />EROSION CONTROL BLANKET. CATEGORY 3 <br />SY <br />1000.00 <br />51.49 <br />0.00 <br />50.00 <br />69738 <br />81,039.10 <br />26 <br />2575.550 <br />COMPOST GRADE 2 <br />CY <br />25.00 <br />51648 <br />0.00 <br />50.00 <br />10,00 <br />8206.64 <br />27 <br />2582.501 <br />PAVEMENT MESSAGE (HANDICAP SYM) EPDXY <br />4" SOLID WHITE LINE EPDXY <br />EACH <br />LF <br />2.00 <br />815.00 <br />57725 <br />51.03 <br />0.00 <br />0.00 <br />$0.00 <br />50.00 <br />4.00 <br />865.00 <br />5309,00 <br />$911.55 <br />20 <br />2582.502 <br />SCHEDULE 6.0- SPOONER PARK ..TOTAL 51.073.54 560.955.55 <br />SPEC <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />TEM <br />NO. <br />7 <br />