|
C HE D L 6.' -ST D TURN LANE WORK
<br />2582.502
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />52.900,00
<br />0.00
<br />80.00
<br />1.00
<br />82,90000
<br />11 2104.505
<br />8
<br />2104.501
<br />2 104.501
<br />21 04.505
<br />2104
<br />2104.513
<br />21 05,501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LE
<br />275.00
<br />83.09
<br />0.00
<br />$000
<br />275,00
<br />584975
<br />REMOVE CONCRETE SIDEWALK
<br />SF
<br />80.00
<br />51.03
<br />0.00
<br />50.00
<br />114.00
<br />5117.42
<br />REMOVE CONCRETE PAVEMENT
<br />SY
<br />30,00
<br />53.61
<br />0.00
<br />50.00
<br />31.00
<br />5111.91
<br />REMOVE BITUMINOUS PAVEMENT
<br />50.00
<br />77.00
<br />51.70
<br />0.00
<br />50.00
<br />117.00
<br />5198.90
<br />SAW CUT CONCRETE FULL DEPTH
<br />53.09
<br />2400
<br />55.15
<br />0.00
<br />50.00
<br />43.00
<br />822145
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />lF
<br />13.00
<br />82.05
<br />0.00
<br />5000
<br />69.00
<br />5142.14
<br />COMMON EXCAVATION (P
<br />CY
<br />115.00
<br />5024
<br />0.00
<br />5000
<br />115.00
<br />594760
<br />9
<br />2105525
<br />TOPSOIL BORROW
<br />CY
<br />31.00
<br />513.39
<br />0.00
<br />50.00
<br />11.00
<br />314720
<br />10
<br />2211.501
<br />AGGREGATE BASE CLASS 5, ROAD
<br />TON
<br />130.00
<br />59.27
<br />0.00
<br />50.00
<br />85.44
<br />8792,03
<br />767.00
<br />2232.501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />110.00
<br />55.15
<br />0.00
<br />$0.00
<br />33.00
<br />5169.95
<br />9.00
<br />2350.501
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />11.20
<br />560.77
<br />0.00
<br />50.00
<br />20,31
<br />51,234.24
<br />88.00
<br />3900
<br />2350.502
<br />TYPE I.V3 NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />26.00
<br />557.68
<br />0.00
<br />50.00
<br />32,91
<br />91,090.25
<br />0.00
<br />2531.501
<br />CONCRETE CURB &GUTTER
<br />LF
<br />250.00
<br />59.27
<br />0.00
<br />50.00
<br />253.00
<br />52345,31
<br />0.00
<br />2531.507
<br />CONCRETE PAVEMENT
<br />Y
<br />155.00
<br />$47.68
<br />000
<br />50,00
<br />204.00
<br />$9,726.72
<br />0.00
<br />2521,501
<br />4' CONCRETE SIDEWALK
<br />5F
<br />55.00
<br />53.14
<br />0.00
<br />5000
<br />57.00
<br />5178.90
<br />0.00
<br />2531018
<br />2 503,641
<br />TRUNCATED DOMES
<br />SF
<br />12.00
<br />536.05
<br />0,00
<br />$0.00
<br />8.00
<br />5288.40
<br />12^ RC PIPE SEWER DES 3006, CI.V
<br />LF
<br />15.00
<br />920.60
<br />0.00
<br />80.00
<br />10.00
<br />5370.00
<br />44.00
<br />2505.502
<br />CONSTORAINAGE STRUCTURE DESIGN SPECIAL 24 "X35"
<br />5 C
<br />1.00
<br />51,215,40
<br />0.00
<br />80.00
<br />1.00
<br />51,2154
<br />20
<br />2506.502
<br />CONST DRAINAGE STRUCTURE DESIGN 48 -4020
<br />EACH
<br />1.00
<br />91.659.85
<br />0.00
<br />80.00
<br />1.00
<br />51,659.05
<br />21
<br />2503.602
<br />CONNECT TO EXISTING STORM SEWER
<br />EACH
<br />2.00
<br />5545.90
<br />0.00
<br />80.00
<br />2.00
<br />31,091.80
<br />22
<br />25 62,502
<br />4" SOLID WHITE LINE EPDXY
<br />LF
<br />50,00
<br />51.03
<br />0,00
<br />50.00
<br />50.00
<br />551.50
<br />23
<br />2502.501
<br />PAVEMENT MESSAGE (RIGHT TURN ARROWI EPDXY
<br />fl
<br />100
<br />550.00
<br />0.00
<br />$0.00
<br />1,00
<br />550.00
<br />20
<br />2582.502
<br />4" SOLID WHITE LINE EPDXY
<br />LF
<br />620.00
<br />51.03
<br />0.00
<br />80.00
<br />1.58500
<br />51,632.55
<br />5500,00
<br />2
<br />2104.501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />70.00
<br />52,05
<br />0.00
<br />50.00
<br />59.00
<br />SCHEDULE 4.0 PIONEER PARK TOTAL 50.00 546,059.11
<br />SCHEDULE 6.0. SPOONER PARK
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />5500.00
<br />0.00
<br />80.00
<br />1.00
<br />5500,00
<br />2
<br />2104.501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />70.00
<br />52,05
<br />0.00
<br />50.00
<br />59.00
<br />5121,54
<br />3
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />2000.00
<br />51,39
<br />0.00
<br />80.00
<br />2,110.00
<br />52,932.90
<br />4
<br />2104.509
<br />REMOVE WOOD POST
<br />EACH
<br />10900
<br />58.24
<br />0.00
<br />50.00
<br />18100
<br />51,491.44
<br />6
<br />2104.511
<br />SAW CUT CONCRETE (FULL DEPTH)
<br />LF
<br />8,00
<br />53.09
<br />0.00
<br />30.00
<br />0.00
<br />80.00
<br />6
<br />2104.513
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LF
<br />90.00
<br />52.06
<br />0,00
<br />50,00
<br />93.00
<br />5191.58
<br />7
<br />2104.523
<br />SALVAGE SIGN
<br />EACH
<br />4.00
<br />$25.75
<br />0.00
<br />50.00
<br />4.00
<br />5103.00
<br />0
<br />2104.523
<br />SALVAGE CONCRETE PARKING STOP
<br />EACH
<br />44.00
<br />50.24
<br />0.00
<br />$0.00
<br />44.00
<br />3362.56
<br />9
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />CY
<br />600.00
<br />57.21
<br />0.00
<br />90,00
<br />767.00
<br />55.530.07
<br />10
<br />2105.501
<br />POND EXCAVATION (RAINWATER GARDEN)
<br />CY
<br />20.00
<br />522.66
<br />0.00
<br />50.00
<br />9.00
<br />3203.94
<br />11
<br />2105.522
<br />SELECT GRANULAR BORROW (CV)
<br />TOPSOIL BORROW
<br />CY
<br />CY
<br />70.00
<br />75.00
<br />$16.48
<br />$13.39
<br />0,00
<br />0.00
<br />50.00
<br />50.00
<br />88.00
<br />3900
<br />81 45034
<br />5522.21
<br />17
<br />2105.525
<br />13
<br />2211.501
<br />AGGREGATE BASE CLASS 5. ROAD
<br />TON
<br />900.00
<br />99.00
<br />0.00
<br />50.00
<br />1,294.55
<br />51165095
<br />14
<br />2232501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />30.00
<br />50.24
<br />0.00
<br />$0.00
<br />14.00
<br />9115,36
<br />15
<br />2350.501
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />200.00
<br />559.74
<br />0.00
<br />50.00
<br />202.47
<br />512,095.56
<br />16
<br />2350.602
<br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />260.00
<br />359.74
<br />0.00
<br />30.00
<br />269.72
<br />516,113.07
<br />17
<br />2531.501
<br />CONCRETE CURS GUTTER 8612
<br />LF
<br />70.00
<br />$2060
<br />0.00
<br />$0.00
<br />5900
<br />51 215.40
<br />10
<br />2540.602
<br />INSTALL SALVAGED CONCRETE PARKING STOP
<br />EACH
<br />44.00
<br />510.30
<br />0.00
<br />50,00
<br />47.00
<br />$484.10
<br />19
<br />2540.603
<br />LANDSCAPE EDGER, STEEL
<br />LF
<br />60.00
<br />$6.70
<br />0.00
<br />80.00
<br />52.00
<br />3340.40
<br />20
<br />2557.603
<br />INSTALL W00DEN F E14CE
<br />LF
<br />30,00
<br />512.36
<br />135.40
<br />51.673.54
<br />165,40
<br />52,044,34
<br />21
<br />2563,601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />5412.00
<br />0.00
<br />$0.00
<br />1.00
<br />5412,00
<br />22
<br />2564.602
<br />INSTALL SALVAGED SIGN
<br />EACH
<br />4.00
<br />577.25
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />23
<br />2573.502
<br />SILT FENCE, TYPE MACHINE SLICED
<br />LF
<br />150.00
<br />$2.58
<br />000
<br />50.00
<br />15000
<br />538700
<br />24
<br />2575,513
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />20.00
<br />530,90
<br />0.00
<br />50,00
<br />4.00
<br />512360
<br />25
<br />2575 523
<br />EROSION CONTROL BLANKET. CATEGORY 3
<br />SY
<br />1000.00
<br />51.49
<br />0.00
<br />50.00
<br />69738
<br />81,039.10
<br />26
<br />2575.550
<br />COMPOST GRADE 2
<br />CY
<br />25.00
<br />51648
<br />0.00
<br />50.00
<br />10,00
<br />8206.64
<br />27
<br />2582.501
<br />PAVEMENT MESSAGE (HANDICAP SYM) EPDXY
<br />4" SOLID WHITE LINE EPDXY
<br />EACH
<br />LF
<br />2.00
<br />815.00
<br />57725
<br />51.03
<br />0.00
<br />0.00
<br />$0.00
<br />50.00
<br />4.00
<br />865.00
<br />5309,00
<br />$911.55
<br />20
<br />2582.502
<br />SCHEDULE 6.0- SPOONER PARK ..TOTAL 51.073.54 560.955.55
<br />SPEC
<br />ITEM DESCRIPTION
<br />UNIT
<br />ORIGINAL CONTRACT
<br />QTY. UNIT PRICE
<br />THIS PERIOD
<br />QTY. TOTAL PRICE
<br />TOTAL TO DATE
<br />QTY. TOTAL PRICE
<br />TEM
<br />NO.
<br />7
<br />
|