SCHEDULE 8.0 ARKWRIGHT BROOKS
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />515000.00
<br />0,00
<br />60.00
<br />1.00
<br />615,000.00
<br />2
<br />2101.501
<br />CLEARING
<br />SF
<br />1575.03
<br />4082
<br />0.00
<br />5000
<br />1,175.00
<br />5963.50
<br />3
<br />2101.502
<br />CLEARING
<br />TREE
<br />1.00
<br />510300
<br />0.03
<br />50.00
<br />1,00
<br />5103.00
<br />4
<br />2101,508
<br />GRUBBING
<br />SF
<br />1575.00
<br />50.82
<br />000
<br />50.00
<br />1175.00
<br />5963.50
<br />5
<br />2101.507
<br />GRUBBING
<br />TREE
<br />1.00
<br />551.50
<br />0.00
<br />80.00
<br />1.0D
<br />551.50
<br />6
<br />2104,501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LP
<br />135.00
<br />$309
<br />0.00
<br />50.00
<br />136.00
<br />542024
<br />7
<br />2104.501
<br />REMOVE PLASTIC EDGING
<br />LF
<br />30.00
<br />$309
<br />0.00
<br />50.00
<br />0.00
<br />80.00
<br />8
<br />2104.503
<br />REMOVE CONCRETE SIDEWALK
<br />SF
<br />15.00
<br />52.05
<br />0.00
<br />80.00
<br />24.00
<br />649.44
<br />9
<br />2104,505
<br />REMOVE CONCRETE PAVEMENT
<br />SY
<br />230.00
<br />$361
<br />0.00
<br />50.00
<br />127.00
<br />$45847
<br />10
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />3550,00
<br />52.06
<br />0.00
<br />50.00
<br />3,550.00
<br />$7,313,00
<br />11
<br />2104,511
<br />SAW CUT CONCRETE FULL DEPTH
<br />LF
<br />125.00
<br />65.15
<br />0.00
<br />60.00
<br />122.00
<br />5628.30
<br />12
<br />2104.513
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />1.5
<br />110.00
<br />62.06
<br />0.00
<br />50.00
<br />121.00
<br />5249.26
<br />13
<br />2104.521
<br />SALVAGE WOOD RAIL FENCE
<br />LF
<br />10.00
<br />66.18
<br />0.00
<br />60.00
<br />10.00
<br />561.80
<br />14
<br />2104521
<br />2104.521
<br />SALVAGE FENCE (WIRE)
<br />SALVAGE CONCRETE PAVER EDGING
<br />LF
<br />LF
<br />40,00
<br />275.00
<br />56.18
<br />53.09
<br />0.00
<br />0.00
<br />60.00
<br />$0.00
<br />70.00
<br />17.00
<br />5432.60
<br />552.53
<br />15
<br />16
<br />2104,523
<br />SALVAGE MAILBOX
<br />EACH
<br />11.00
<br />525.75
<br />0.00
<br />50.00
<br />11.00
<br />528525.
<br />17
<br />2104.523
<br />SALVAGE LIGHT POLE
<br />EACH
<br />1.00
<br />5206.00
<br />0,00
<br />60.00
<br />000
<br />50.00.
<br />18
<br />2105.501
<br />COMMON EXCAVATION (P0
<br />CY
<br />1582.00
<br />68.24
<br />0,00
<br />60.00
<br />1,582.00
<br />513,035.68
<br />19
<br />2105501
<br />POND EXCAVATION (RAINWATER GARDEN)
<br />CY
<br />270.00
<br />522,66
<br />0.00
<br />50,00
<br />80,00
<br />51.812,80
<br />20
<br />2105.522
<br />SELECT GRANULAR BORROW (CV)
<br />TOPSOIL BORROW
<br />08
<br />CY
<br />1250,00
<br />200.00
<br />516.48
<br />$13.39
<br />0,00
<br />000
<br />60.00
<br />50.00
<br />1250.00
<br />207.00
<br />620,600.00
<br />52.77173
<br />21
<br />2105.526
<br />22
<br />2105.604
<br />GEOTEXTILE FABRIC
<br />SY
<br />3750.00
<br />$1.91
<br />0.00
<br />50.00
<br />3.750,00
<br />57.182,50
<br />23
<br />2131.502
<br />CALCIUM CHLORIDE
<br />GAL
<br />700.00
<br />30.01
<br />0.00
<br />5000
<br />0.00
<br />50.00
<br />24
<br />2211.501
<br />AGGREGATE BASE CLASS 5. ROAD
<br />TON
<br />1760.00
<br />$9.27
<br />0.00
<br />50.00
<br />1,949.52
<br />518,072.05
<br />25
<br />2232.501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />20.00
<br />510,30
<br />0.00
<br />$0.00
<br />000
<br />60,00
<br />26
<br />2350.501
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />300.00
<br />$81.80
<br />0.00
<br />5000
<br />306.62
<br />518.94812
<br />27
<br />2350.501
<br />TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY)
<br />TON
<br />1500
<br />5128.75
<br />0.00
<br />80.00
<br />1193
<br />51.53599
<br />28
<br />2350.502
<br />TYPE LV3 NON WEARING COURSE MIXTURE BASE
<br />TON
<br />380.00
<br />$59.74
<br />0.00
<br />50.00
<br />395.16
<br />523.606,86
<br />29
<br />2502,541
<br />4" PERF PE PIPE DRAIN W /SOCK
<br />LF
<br />20%1,00
<br />$2,37
<br />0.00
<br />60.00
<br />2,059,00
<br />54,879.83
<br />30
<br />2503541
<br />12" RC PIPE SEWER DES 3006, CLV
<br />LF
<br />28.00
<br />520.60
<br />0,00
<br />$0,00
<br />29.00
<br />5597.40
<br />31
<br />2503.541
<br />15"150 PIPE SEWER DES 3006, CLV
<br />LF
<br />448.00
<br />521.63
<br />0.00
<br />50.00
<br />448.00
<br />$9,690.24
<br />32
<br />2503.602
<br />CONNECT TO EXISTING STORM STRUCTURE
<br />EACH
<br />1.00
<br />5075.50
<br />0.00
<br />60.00
<br />100
<br />5875.60
<br />33
<br />2603.602
<br />SANITARY MANHOLE
<br />EACH
<br />1.00
<br />53,736.00
<br />0.00
<br />$0.00
<br />1.00
<br />$3,736.00
<br />34
<br />2506.502
<br />C0NS7 DRAINAGE STRUCTURE (DESIGN SPECIAL 24 8(36"
<br />EACH
<br />1.00
<br />51,215.40
<br />000
<br />50.00
<br />1 00
<br />51,21540
<br />35
<br />2506.502
<br />CONST DRAINAGE STRUCTURE DESIGN 4 84020
<br />EACH
<br />1.00
<br />51.52440
<br />0.00
<br />50,00
<br />1,00
<br />$1,52440
<br />38
<br />2506.522
<br />ADJUST FRAME AND RING CASTING
<br />EACH
<br />3.00
<br />5463.50
<br />0.00
<br />50.00
<br />3.00
<br />51,390.5'
<br />37
<br />2521.501
<br />4" CONCRETE SIDEWALK
<br />SF
<br />20.00
<br />54.12
<br />0.00
<br />80.00
<br />24,00
<br />598,88
<br />38
<br />2531.501
<br />CONCRETE CURB GUTTER DESIGN 0618
<br />LF
<br />1960.00
<br />59.27
<br />0,00
<br />50.00
<br />1,914.00
<br />$17,742.78
<br />39
<br />2531.507
<br />CONCRETE DRIVEWAY APRON (6"THICK)
<br />SY
<br />130.00
<br />542.23
<br />0,00
<br />50.00
<br />114.00
<br />$4,814.22
<br />40
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT (6' THICK)
<br />SY
<br />250.00
<br />543,26
<br />0.00
<br />50.00
<br />87.00
<br />53.763.62
<br />41
<br />2540.602
<br />INSTALL SALVAGED MAILBOX
<br />EACH
<br />11.00
<br />582.40
<br />000
<br />50.00
<br />11.00
<br />590640
<br />42
<br />2540.603
<br />LANDSCAPE EDGER, STEEL
<br />LF
<br />310.00
<br />$6.24
<br />0.00
<br />50.00
<br />173.00
<br />51,425.52
<br />43
<br />2540.603
<br />LANDSCAPE EDGER PLASTIC
<br />LF
<br />30.00
<br />$5.15
<br />0.00
<br />40.00
<br />0.00
<br />50.00
<br />44
<br />2540.603
<br />INSTALL SALVAGED CONCRETE PAVER EDGING
<br />LP
<br />55.00
<br />510.30
<br />0.00
<br />80.00
<br />1700
<br />5175.10
<br />45
<br />2545602
<br />INSTALL SALVAGED 1IGHTPOLE
<br />EACH
<br />1.00
<br />51,236.00
<br />0,00
<br />50.00
<br />0.00
<br />50.00
<br />48
<br />2557.603
<br />INSTALL SALVAGED WOOD RAIL FENCE
<br />IF
<br />10,00
<br />514.42
<br />0.00
<br />50.00
<br />0.00
<br />50.00.
<br />47
<br />2557.803
<br />INSTALL SALVAGED WIRE FENCE
<br />LF
<br />40.00
<br />514,42
<br />0.00
<br />50.00
<br />000
<br />50.00
<br />48
<br />2563.801
<br />TRAFFIC CONTROL
<br />16
<br />v 1.00
<br />5618.00
<br />000
<br />50.00
<br />1.00
<br />$618.00
<br />ITEM
<br />N0.
<br />SPEC
<br />ITEM DESCRIPTION
<br />UNIT
<br />ORIGINAL CONTRACT
<br />QTY. UNIT PRICE
<br />THIS PERIOD
<br />QTY. TOTAL PRICE
<br />TOTAL TO DATE
<br />QTY. TOTAL PRICE
<br />24
<br />2564.531
<br />F 8 I SIGN PANEL, TYPE C
<br />SF
<br />8.25
<br />527.30
<br />0.00
<br />5000
<br />6,25
<br />5170,63
<br />25
<br />2564802
<br />F I SIGN POST
<br />EACH
<br />1,00
<br />$82.40
<br />0.00
<br />$0.00
<br />1.00
<br />582.40
<br />26
<br />2575.604
<br />SEEDING (TYPE 270
<br />SY
<br />275.00
<br />61,29
<br />0.00
<br />50.03
<br />24000
<br />5309.60
<br />27
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1,00
<br />6800.00
<br />0.00
<br />$0.00
<br />1,00
<br />6800.00
<br />SCHEDULE 6.0- ST. JUDE TURN LANE WORK -TOTAL $0.00 525.072,31
<br />SCHEDULE 7.0. CHANGE ORDER 82
<br />SPEC
<br />CHANGE ORDER /42
<br />LS
<br />1.00
<br />$7,407.00
<br />0.00
<br />50.00
<br />1.00
<br />$7,407.00
<br />SCHEDULE 7.0 CHANGE ORDER 312 -TOTAL
<br />50.00
<br />67,407.00
<br />8
<br />
|