My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-11 Council Agenda
>
City Council Packets
>
2010-2019
>
2011
>
04-27-11 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 8:59:27 AM
Creation date
4/25/2011 8:48:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eel Fnerg y <br />NORTHERN STATES POWER <br />414 NICOLLET MALL, MP-3 <br />MINNEAPOLIS, MN 55401 <br />Lee Rossow <br />1870 Rice Street <br />St. Paul, MN 55113 <br />GENERAL TRANSMISSION LINE ENCROACHMENT GUIDELINES —1I5kV <br />Dear Mr. Rossow; <br />While working around transmission power lines and within Xcel Energy's easement area there are <br />general guidelines that need to be observed for line integrity and safety of the workers. <br />(1) <br />(2) <br />(3) <br />Excavation close to structure location. <br />A minimum distance of 20 feet of supported earth must be maintained from any part of the <br />power pole. Support of the ground beyond the 20 feet may be provided by a slope no <br />greater than three feet horizontal to one foot vertical. Support may also be provided by the <br />use of cribbing, sheet piling, retaining wall or tunneling. The specific plan for providing the <br />required support and the excavation plan for the proposed project must be submitted to Xcel <br />Energy prior to construction for review and approval. <br />Grade change around structure location. <br />Pill around or above power poles or meta! tower foundations is not permitted. The grade <br />around the power poles or metal tower must provide for surface water runoff — no surface <br />water ponding around power poles or metal tower will be permitted. Any cost related to the <br />adjustment of Xcel Energy's facilities will be at the requestor's expense. <br />Till and grade change around gay wires and anchors. <br />Fill above the steel anchor rocl onto the guy wire is not permitted. The specific plan for any <br />grade change or excavation in the vicinity of down guys and anchors must be submitted to <br />Xcel Energy prior to construction for review and approval. <br />(4) Grade change within easement. <br />The ground elevation within the easement shall not be increased more than I foot above the <br />existing grade. Stockpiling of soli and/or material within the easement will not be <br />permitted. <br />(5) <br />Clearances to equipment and workers. <br />A working clearance of 20 feet between the electrical conductors and any cranes or digging <br />equipment used in or near the easement, or a clearance of 20 feet to the physical proximity <br />of workers must be maintained at all times. In addition, any construction near the <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.