Laserfiche WebLink
Page 2 <br /><l /6 /2011 <br />transmission line(s) shall comply with all OSHA Safety Clearances. If this clearance cannot <br />be maintained, the contractor or developer must arrange for a line outage, if possible, by <br />calling Xcel Energy's System Control department (Steve Rollin 612 /330 - 2875). Adequate <br />advanced notice must be provided in order to schedule a line outage. There is a fee of <br />approximately $350.00 per day, per outage, for this service. This fee mist be paid prior to <br />outage. <br />The preceding two paragraph(s) must be included in a prominent location on the plan sets and <br />specifications given to contractors. <br />(6) Landscaping within the easement. <br />Detailed plans for landscaping (including light standards) must be submitted to Xcel Energy <br />for review and approval, Generally shorter varieties of trees and shrubs may be considered <br />that have a mature height of 15 feet of below. If planting is permitted, the line's voltage and <br />the tree's mature height and the distance from the fine must be considered. For maintenance <br />purposes there shall be no planting with 15 feet of structure sites. <br />(7) <br />(8) <br />(9) <br />Building on easements. <br />There shall be no permanent or temporary building allowed within the easement area unless <br />approval by Xcel Energy is obtained in advance of construction, <br />Fuel and refueling on easements. <br />There shall be no fuel tanks stored or refueling of vehicles and equipment within the <br />easement. <br />Fences on easements. <br />If the easement area is fenced, gates must be installed to provide access to Xcel Energy for <br />maintenance purposes. Chain link or other types of fences using metal material and <br />constructed on or near an Xcel Energy easement shoulcl be properly grounded. <br />(10) Streetlights and signs on easements. <br />No streetlights, signboards, identification signs or any other type of non - building structure <br />shall be placed within the easement prior to approval. Detailed plans must be submitted to <br />Xcel Energy for review and approval to verify compliance with electrical code clearances. <br />It is the express condition of any consent that all other terms and conditions of the easement(s) <br />covering this property shall remain in full force and effect. <br />Sincerely, / <br />/ <br />(!ly&1 Peterson <br />)(cel Energy 1 Responsible By Nature <br />Acio nY <br />414 Nicollet Mall. MP -IIA Minneapolis. MN 55401 <br />14 <br />