Planning Commission <br />July 29, 2011 <br />Page Two <br />3. The final plan should provide details on how the watermain testing will be <br />completed. If a new valve is not installed at the connection, the existing valve <br />must be inspected and any deficiencies corrected at the time of the connection. <br />The connection to the existing watermain must be coordinated with Agropur, <br />formerly Schroeder Milk, as they are a high volume user and typically run 24 <br />hours a day. <br />4. All storm water entering infiltration areas must be pretreated for sediment <br />removal prior to discharge to the practice. Sumps or sediment removal <br />structures should be added to accommodate this requirement. <br />Civil Details <br />1. The top barrel section of all manholes should be a 1 -foot section. <br />2. Retaining glands, megalug or equal, can be used in lieu of rodding for hydrants. <br />Operating and cap nuts shall be to Little Canada standard. <br />Landscape Plan <br />1. A planting plan for the 10 -foot bench area of the large pond should be included <br />in the landscape plan. <br />2. Seeding is proposed for the large pond slope and we would recommend plug <br />planting be utilized to ensure sufficient establishment since the pond areas will <br />receive stormwater shortly after construction. A seed mixture should be <br />indicated for the snow melt pond in the northeast corner of the site. <br />3. The boulevard area between the Park & Ride facility and the public streets is <br />proposed to be largely trap rock. The applicant should specify if the rock will be <br />placed on the ground or if a plastic barrier will be used as this will affect the <br />stormwater runoff from the site. <br />Drainage Calculations <br />1. A post construction drainage area map was provided as part of the submittal but <br />an existing drainage area map should be provided for comparison. Pre existing <br />rates of discharge should be provided for each drainage direction. <br />2. The existing area is slightly higher that the proposed area. Both areas should be <br />equal. <br />3. The site consists of silty clay and silty sand soil types. A type C soil and <br />associated curve number should be utilized in HydroCAD modeling. <br />4. The proposed pond 2S is modeled as wet pond and therefore any area below the <br />normal water level (NWL) should have a curve number of 100. <br />5. A detail should be provided for the outlet structure for Pond 2P and the <br />underground system outlet for verification of modeling. <br />6. Infiltration /exfiltration rates from imported sand should be modeled at 0.8- inches <br />per hour. <br />7. The post condition discharge rates should be determined without the use of <br />infiltration to ensure rate control will be accomplished in the event the infiltration <br />systems fail. <br />Ltr- 072911 -PC <br />10062 Flanders Court NE, Blaine, MN 55449 - Phone: (763) 780 -0450 - Fax: (763) 780 -0452 <br />