Laserfiche WebLink
property and the All- American Recreation parcel. In the space adjacent to the building, <br />4 -5 ornamental trees would greatly improve the site aesthetics by buffering what is <br />otherwise an uninterrupted concrete wall. <br />To the south of the building, the applicant identifies "Rain Garden" seeding. This <br />ground cover should be adequate — the applicant should verify that proper maintenance <br />of this material will occur to allow complete establishment of the ground cover, as well <br />as ongoing survival. Rain Gardens in commercial applications can greatly benefit from <br />irrigation — otherwise they can be difficult to establish. <br />The parking lot to the west of the building is shown to include bituminous surface and <br />concrete curb in accordance with ordinance requirements. By code, a total of 82 <br />parking spaces would be required for this facility based on use and square footage <br />breakdowns provided by the applicant (one space per 200 square feet of office, one <br />space per 350 square feet of manufacturing). The new parking lot includes 48 spaces, <br />with and addition 33 spaces of "proof of parking" located on the north side of the <br />property on existing bituminous surface. This parking supply should be adequate, <br />however, the City would reserve the right to require the improvement of additional <br />"proof -of- parking spaces if demand is demonstrated. <br />To the far north of the property, an existing metal shed is located which is not <br />(apparently) related to the use of this property. As a part of this PUD expansion, the <br />City may require removal of this non - conforming use and structure, or establish a <br />timeline for removal by PUD development contract. It is not clear from the application <br />materials what the long -term use of the property may be — this should be clarified as a <br />part of this application. There are other redevelopment needs in the immediate area, <br />however, this applicant does not control those other sites. <br />Finally, the applicant is seeking approval of the use of a temporary office trailer during <br />the construction period to allow continued operations. The temporary building would be <br />located to the south of the proposed expansion. This would appear to be an <br />appropriate request, with the condition that the trailer is removed from the site within a <br />reasonable period of time (such as 90 days) following occupancy of the new expansion. <br />Summary and Recommendation <br />The Express Image PUD is consistent with the existing uses of the property, as well as <br />the City's discussions for land use in this portion of the PUD zoning district. The <br />proposed building represents an improvement in the building materials, even though the <br />building is only slightly visible from Rice Street. Planning staff would recommend <br />approval of the proposal with the following conditions: <br />1. A colored concrete panel is used, rather than grey (applicant should propose a <br />material for City approval). <br />2. The applicant add shrub plantings in the rock planting area along the west <br />boundary line. <br />2 <br />12 <br />