Laserfiche WebLink
3. The applicant add ornamental tree plantings in front of the building along with the <br />proposed shrub plantings. <br />4. The applicant identify the specific seeding plan and maintenance plan for the rain <br />garden seeding to the south and east of the building. <br />The City and applicant agree to a resolution of the non - conforming metal building <br />at the north boundary of the site. <br />The City approves the "proof of parking" arrangement, with the condition that <br />additional parking would be improved if it is shown to be needed. <br />7 The city approves the use of a temporary office trailer during the time of <br />construction of the addition, to be removed within 90 days of occupancy of the <br />addition. <br />8. Conditions relating to drainage and stormwater as required by the City Engineer. <br />pc: Kathy Glanzer <br />Steve Westerhaus <br />Lee Elfering <br />Ryan Politz, RJ Marco, 75 W. Viking Drive, Suite 104, Little Canada, MN 55117 <br />3 <br />13 <br />