My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-08 Council Agenda
>
City Council Packets
>
2000-2009
>
2008
>
06-11-08 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 3:24:13 PM
Creation date
10/19/2011 3:18:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Erosion Control. The Developer shall comply with the <br />approved erosion control plan for the prevention of damage to <br />adjacent property and the control of surface water runoff. As <br />the operation continues, the City may impose additional erosion <br />control requirements if, in the opinion of the City Engineer, <br />they would be useful. The Developer shall comply with the <br />erosion control plans and with any such additional instructions <br />it receives from the City. <br />7. Cleanup. The Developer shall promptly clear any soil, <br />earth or debris resulting from work by the Developer or its <br />agents or assigns. <br />8. Security. The City approves the activities on the <br />property subject to the condition that the Developer agrees to <br />reimburse the City for any and all costs associated with the <br />reconstruction of the public improvements which, in the opinion <br />of the City Engineer, have been damaged by this activity and <br />subject to the time requirements specified in Paragraph 10. Said <br />reimbursement shall be made within thirty (30) days of the <br />Developer's receipt of a statement from the City. <br />9. Storm Sewer. The Developer warrants that he is not <br />increasing surface storm drainage onto adjacent properties. <br />10,. Time Frame. Subject to compliance with the terms of <br />this Contract, the Developer shall be permitted to operate <br />storage, stockpiling, and processing (crushing) of aggregate <br />materials and other activities relating to the same for the <br />purpose of making recycled concrete and asphalt aggregate. <br />Stockpiling and processing activities shall cease on or before 31 <br />July 1991. The site shall be improved per the approved Site <br />Development Plan, Exhibit B, which shall include the developer <br />paving the roadway access area, controlling dust, and providing <br />adequate berming of the operation as approved by City staff. <br />From 1 August 1991 until 1 August 1992, the Developer may store <br />processed materials only, and no delivery of unprocessed <br />materials or actual processing of materials shall occur on the <br />property. After 1 August 1992, the stockpiling and storage of <br />aggregate materials shall cease as well, and all activities <br />thenceforth shall be in complete conformance with City <br />regulations, including but not limited to City Codes, Zoning <br />Ordinances, and Subdivision Ordinance. <br />11. Responsibility for Costs. The Developer shall <br />reimburse the City for all costs incurred to-date related to the <br />research, investigation, and analysis of the Developer's <br />recycling operation. <br />2 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.