Laserfiche WebLink
tIS11IHG - ASSO(I111TES <br />Memo <br />TO: Mayor Blesener & Members of the City Council <br />FROM: Lee Elfering, City Engineer <br />DATE: October 21, 2011 <br />RE: 2012 Street & Utility Improvements Project <br />As part of the proposed 2012 budget the City Is looking at improving several street <br />segments to keep up with the ongoing street maintenance program. The improvement <br />options vary from rehabilitation by mill and overlay to full street reconstruction. A list of <br />the streets that are being considered for improvement are provided below: <br />Park Street (County Road C to south end) <br />Rosewood Drive (County Road C to south end) <br />Spruce Street (Country Drive to railroad) <br />Spruce Street (County Road C to south end) <br />Sylvan Street (County Road C to south end) <br />Based on past history we do not anticipate every street in the above list will move <br />forward into the project stage and other streets that may then be reviewed for addition <br />include. <br />Vanderbie Road (Labore Road to Allen) <br />Demont Avenue (Savage Lane to McMenemy) <br />Morrision Street (Demont to south end) <br />As with all the previous street improvement projects, a portion of the project cost would <br />be assessed in accordance with the City's assessment policy to the adjacent benefiting <br />properties. The City would be responsible for any difference between the total project <br />cost and the assessable value. The assessing of public improvements requires that the <br />Minnesota Statutes Chapter 429 process for local improvements be followed. A required <br />step in this process is the preparation of a feasibility study to ensure that the project is <br />necessary, cost effective, and feasible from an engineering standpoint. Therefore at this <br />time we are requesting that the City Council authorize preparation of a feasibility study <br />for the 2012 Street Improvements Project. <br />The pavement on Spruce Street has advanced beyond a simple rehabilitation by mill and <br />overlay and the street is currently not up to the City's urban standard. Those two factors <br />have put the street in the reconstruction category of recommended improvement, which <br />typically involves reconstruction of the entire street section from the subgrade up and is <br />estimated at around $650,000. However, the street has held up relatively well given the <br />amount of heavy traffic it carries. As part of the review of Spruce Street soil borings and <br />survey information would be obtained to determine if the existing street base could be <br />10062 Flanders Court NE — Blaine, MN 55449 - (763) 7 780.0450 fax (763) 205 -2341 <br />7: \PROJ \120155E - 2012 Street Improvements \0030 ■Memo - 102111 -CC -Into Meeting Autborizelion.000 <br />IPUE flOP141 <br />