Laserfiche WebLink
.tlf[RING 11SSO(I41TtS <br />July 1, 2008 <br />File: 120116E -0240 <br />Honorable Chair and Planning Commission <br />City of Little Canada <br />515 Little Canada Road East <br />Little Canada, MN 55117 -1633 <br />RE: LAVAQUE ADDITION <br />CITY OF LITTLE CANADA <br />raur HOU4I <br />Dear Planning Commission: <br />Below are our comments on the Lavaque Addition preliminary plat submittal. The <br />preliminary plat creates a new lot by combining the back of 580 and 588 County Road <br />B2. It should be noted that the Williams pipelines are located within the street right -of- <br />way of Viking Drive adjacent to the development. We have discussed the City's pipeline <br />ordinance with the surveyor for the development and agreed that in light of the fact that <br />no pipeline easement or right -of -way specifically exists for the Williams pipeline, the 50- <br />foot setback would be from the street right -of -way for the new lot. That is the reason for <br />the 50 -foot front yard setback shown on Lot 3 instead of the standard 30 -foot setback. <br />Based upon our review we would offer the following comments. <br />Preliminary Plat <br />1. Drainage and utility easements should be provided around Lots 1 and 2 of <br />Block 1 per the detail and as shown on Lot 3. <br />2. The easement across Lot 2 for the sanitary sewer service for Lot 3 should be <br />twice as wide as it is deep and centered over the pipe. <br />3. The pipeline setback policy requires a minimum buildable area of 60 feet of <br />width by 60 feet of depth outside the setback. The current buildable area of <br />Lot 3 does not meet this criterion. <br />4. Current City standards require interior lots to be a minimum of 11,000 square <br />feet. As shown the lot is only 10,670 sf. Depending on how far the north lot <br />line of Lot 3 is moved, the lot could become a corner lot, The requirements <br />for a corner lot are at least 100 feet of width and 12,500 sf of area. <br />At the time of building permit application for construction on Lot 3 the City should require <br />that a grading plan be submitted for review and approval by the City to ensure no <br />drainage issues will be created with the new construction. Please contact me if you <br />have any questions regarding the above information at (763) 780 -0450 ext. 13. <br />Sincerely, <br />ELFERING & ASSOCIATES <br />efaSiiez <br />Lee Elfering, P.E. <br />City Engineer <br />Ur- 070108 -PC <br />10062 Flanders Court NE, Blaine, MN 55449 - Phone: (763) 780 -0450 - Fax: (763) 780 -0452 <br />