My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2007 Additions
>
City Council Packets
>
2000-2009
>
2007
>
05-09-2007 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 2:15:27 PM
Creation date
11/8/2011 2:14:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -08 -2007 10:46 <br />LEGEND TECHNICAL SERVICES P.003 <br />2.2 Regui ated Material Documentation <br />LEGIIMD will also document any regulated wastes that are required to be <br />remo'red prior to demolition. The regulated waste assessment will include <br />identi::ying and quantifying all products that once they become wastes are <br />reguhi ted including but not limited to: hazardous waste, solid waste, demolition <br />debris! toxic wastes, pollutants and contaminants, and all wastes that coulll result <br />in environmental liability xgrosure if improperly disposed. <br />2.3 Lead Paint Testing <br />LEGEND will test paints :found to be in a deteriorated state (Le. peeling, f 1aking, <br />etc.). The paints will be tested using an X -Ray Fluorescence (XRF) portable <br />analyzer. The analyzer gives direct readings of lead content. Any paint found to <br />have i ,ad in a concentration greater than 1.0 milligrams per square centimeter <br />(mg/cn2) is considered as lead -based paint and must be stabilized prior td <br />demo I ition. Inconclusive readings will be verified by collecting chip samples of <br />the paint and having them analyzed in LEGEND'S AIFIA accredited laboratory. <br />2.4 Report <br />A fmsi I report will be generated for each parcel containing the results of the <br />asbestos and lead testing along with locations of any asbestos materials required <br />to be :removed prior to demolition and a summary of the regulated wastes present <br />that ne ed to be removed. The reports will be submitted within two weeks of <br />accepl.ance of this proposal. <br />3.0 COSTS <br />The costs for ,:us project will be based on a flat rate of $2,400.00. <br />4,0 REMARKS <br />We appreciate: the opportunity to submit this proposal and would look forward to <br />working on this project, <br />Cordially, <br />.L.Ts SEND TECHNICAL SERVICES, INC. <br />Project Manager <br />Page 2 of 2 <br />TOTAL P.003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.