Laserfiche WebLink
tied DE5CRJETION'H. ...'" <br />0090I0JA3i:CON11RAOTi <br />dT9:: <br />PgRloo;: E: <br />TOTALPR(CE <br />C <br />41 SPEC SEDIMENT REMOVAL BACKHOE HR 2.00 <br />42 SPEC BIOROLL LF 70.00 <br />43 SPEC GRADATION TEST,CLASS 5 r EACH 1.00 <br />44 SPEC PROCTOR TEST, CLASS 5 EACH 1.00 <br />45 SPEC PROCTOR TEST, CLASS 5 EACH 2.00 5138.60 0.00 <br />46 SPEC DENSITY TEST INPLACE EACH 10.00 546.20 1.00 <br />47 SPEC (CONCRETE TESTING EACH 2.00 5145.20 0.00 <br />48 5000 BITUMINOUS CORE DENSITY EACH 6.00 5100.00 0.00 <br />5140.00 0.00 <br />511.00 0.00 <br />5125.40 0.00 <br />5138.60 0.00 <br />SCHEDULE 4.0 - SAVAGE LANE -TOTAL <br />50.00 0.00 $0.00 <br />50.00 72.00 5792.00 <br />50.00i 0.00 50 00 <br />50.00 0.00 50.00 <br />50.00 0.00 50.00 <br />546.20 5.00 5231.00 <br />50.00 1.00 '15.20 <br />50.00 0.00 50.00 <br />51.51428 <br />5125 400.26 <br />SCHEDULE 6.0 - LABORE ROAD <br />1 2021.501 MOBILIZATION LS 1.00 r 5230000 000 <br />2 2104.501 REMOVE CONCRETE CURB AND GUTTER . LF 270.00 53.00 000 <br />3 2231.604 BITUMINOUS PATCH SPECIAL SY 85.00 528.00 0.00 <br />4 2232301 MILL BITUMINOUS PAVEMENT (2' DEEP) SY 2,850.00 $3 00 0.00 50.00 2,420.00 57,260 00 <br />5 2350 501 TYPE SP WEAR COURSE MIXTURE TON 500.00 547.50 0.00 50.00 429.26 520,389.85 <br />6 2504 602 ADJUST VALVE 90X EACH 3.00 5200.00 0.00 50,009 3.00 5600.00 <br />2506 522 ADJUST FRAME,RING AND CASTING EACH 4.00 5350.00 0.00 50.00 8.00 52,800.00 <br />2531.501 CONCRETE CURB 8, GUTTER DESIGN 0618 05 27000 513.50 0 00 50.00 471.00 56,350.50 <br />2563.601 TRAFFIC CONTROL LS 1.00 5500.00 0.00 50,00 1.00 550000 <br />10 2564.603 4" SOLID LINE VVHITE - EPDXY L LE _110000 5(132 000 50.00 0.00 50.00 <br />11 2564.603 4" DOUBLE SOLID LINE YELLOW- EPDXY LF 0,600,00 5065 0,00, 5000 0.00 50.00 <br />50 .00 <br />50 .00 <br />50 .00 <br />1.00 <br />47100 <br />83.00 <br />52,200.00 <br />11,19 00 <br />92.324,00 <br />7 <br />8 <br />SCHEDULE 6.0 LABORE ROAD - TOTAL 50.00 543.845 35 <br />SCHEDULE 5.0 SEXTANT AVENUE <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />$7,000.00 <br />0.00 <br />$0.00 <br />1.00 <br />S7,000.00 <br />2 <br />2104601 <br />REMOVE SEWER PIPE (STORM) <br />LF <br />70190 <br />$10.20 <br />a00 <br />6000 <br />48.00 <br />5489.60 <br />3 <br />2104.501 <br />1--- <br />REMOVECURBANDGUTTER <br />LF <br />85.00 <br />$2.20 <br />0.00 <br />50.00 <br />71.00 <br />515620 <br />4 <br />2104.503 <br />REMOV000NCR010PAO <br />SF <br />130.00 <br />$2.20 <br />0.00 <br />50.00 <br />40.00 <br />58820 <br />5 <br />2104.503 <br />RgMpMpsqIopgAy.00g9gI_ <br />SF <br />245.00 <br />52.20 <br />0.00 <br />60.00 <br />200.00 <br />544a00 <br />6 <br />2104205 <br />EMOVE BITUMINOUS PAVEMENT <br />SY <br />_2,210.00 <br />$2.00 <br />0 00 <br />60.00 <br />2,21000 <br />51420.00 <br />7 <br />2104.509 <br />REMOVE SIGN <br />EACH <br />4.00 <br />6150.00 <br />0.00 <br />50.00 <br />4.00 <br />5600.00 <br />8_ <br />2104.511 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />1,8 <br />17020 <br />$3.90 <br />0.00 <br />50.00 <br />66.00 <br />6257.40 <br />9 <br />2104.523 <br />SALVAGEMA 0100 X <br />EACH <br />900 <br />54.90 <br />0.00 <br />50.00 <br />8.00 <br />639 20 <br />10 <br />2105.501 <br />ICOMMON EXCAVATION (P) <br />CY <br />68100 <br />58.50 <br />DOG <br />50.00 <br />680.00 <br />65,78000 <br />11 <br />2105.522 <br />ELECT GRANULAR BORROW (CV) <br />CY <br />85000 <br />510.00 <br />0.00 <br />50.00 <br />850.00 <br />5$600.00 <br />12 <br />2131.502 <br />CALCIUM CHLORIDE <br />GAL <br />1,000 00 <br />51.10 <br />0.00 <br />5000 <br />0.00 <br />MOO <br />13 <br />2211.501 <br />GGREGATE BASE CLASS 5 <br />TON <br />1,100.00 <br />515.90 <br />0.00 <br />50.00 <br />1,206.72,_ 519 186.85 <br />14 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT 1- <br />SY <br />35.00 <br />510.00 <br />0,00 <br />5299 <br />0.00 <br />5000 <br />15 <br />2350.501 <br />TYPE SP WEAR COURSE MIXTURE <br />TON <br />24000 <br />547.50 <br />0.00 <br />50.00 <br />000 <br />$0.00 <br />16 <br />2350601 <br />TYPE SP VVEAR COURSE MIXTURE (DRIVEWAYL <br />TON <br />5.00 <br />5100.00 <br />0.00 <br />50.00 <br />16.83 <br />51,683.00 <br />17 <br />23501502 <br />TYPE SP NON WEARING COURSE MIXTURE (BASE) <br />TON <br />240.00 <br />546.50 <br />0 00 <br />$0.00 <br />235.59 <br />510,054.94 <br />18 <br />2411.609 <br />BOULDER RETAINING WALL <br />SF <br />180.00 <br />528 50 <br />100 <br />$0.00 <br />0.00 <br />50.00 <br />19 <br />2502002 <br />144NCH PERE PE PIPE DRAIN <br />LF <br />800.00 i,_ $12.501 <br />0.00 <br />50.00 <br />630.00 <br />57,875.00 <br />20 <br />2503.541 <br />r RC PIPE SEWER DES 3006 CLV <br />LF <br />28.00 <br />530.60 <br />0.00 <br />50.00 <br />28.00 5856.80 <br />21 <br />2503 541 <br />5" RC PIPE SEWER DES 3006, CLV <br />LF <br />32.00 <br />531.62 <br />0.00 <br />50.00 <br />32.00 <br />$1,011.84 <br />22 <br />2503.541 <br />16" PVC C905 STORM MAIN <br />LF <br />252.00 <br />554.06 <br />0.00 <br />50.00 <br />252.00 <br />513,623.12 <br />23 <br />2503602 <br />CONNECTTOEX9STO305TORMSEWER <br />EACH <br />2.00 <br />5359 04 <br />0.00 <br />$0.00 <br />2.00 <br />5718.08 <br />24 <br />2504.602 <br />ADJUST VALVE BOX <br />EACH <br />100 <br />$20000 <br />0.00 <br />50.00 <br />2.00 <br />5400.00 <br />25 <br />2506402 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24"X36 <br />EACH <br />200 <br />52,04000 <br />0.00 <br />50.00 <br />200 <br />54080 00 <br />26 <br />2506.502 <br />ONST DRAINAGE STRUCTURE DESIGN 48-9020 <br />EACH <br />3.00 <br />52 244.00 <br />0 00 <br />50.00 <br />300 <br />49,132.00 <br />27 <br />2506.516 <br />ASTING ASSEMBLY <br />EACH <br />1(10 <br />6250.00 <br />0.00 <br />50.00 <br />0 00 <br />50.00 <br />28 <br />2520501 <br />CONCRETE SIDEWALK (cr THICK) <br />SF <br />20.90 <br />5400 <br />0.00 <br />$0.00 <br />55.00 $220.00 <br />29 <br />2531.501 <br />00.9201011.0 CURB 8, GUTTER DESIGN 8618 <br />LF <br />1,380.00 <br />$9.50 <br />0.00 <br />00.00 <br />1,359.00 <br />612,910.50 <br />30 <br />2530507 <br />CONCRETE ORIVEUVAY PAVEMENT <br />SY <br />25.00 <br />54900 <br />0.00 <br />50.00 <br />25.00 <br />51,00000 <br />31 <br />2531.507 <br />CONCRETE DRIVEWAY APRON (6' THICK). <br />SY <br />65.00 <br />540.00 <br />0.00 <br />5000 <br />61.00 52,440.00 <br />32 <br />2540.602 <br />9NSTALLSALVAGEDNWL9 .. <br />EACH <br />820 <br />5150.00 0.00 <br />$0.00 <br />8.00 51,200.00 <br />33 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />moms aoo <br />so.00 <br />1.00 <br />5500.00 <br />34 <br />2564.531 <br />F 8. I SIGN PANEL <br />SF <br />18.75 <br />53000 <br />0.00 <br />50.00 <br />18.75 <br />558125 <br />35 <br />2564.602 <br />F 8. I SIGN POST <br />EACH <br />1.00 <br />5100.00 <br />0.00 <br />50.001 <br />0.00 5000 <br />36 <br />2573.602 <br />SILT FENCE TYPE MACHINE SLICED <br />LF <br />330.00 <br />52.20 0.00 <br />50.00 <br />353.00 5776.60 <br />37 <br />2573630 <br />INLET PROTECTION IVVIMC0)_ <br />EACH <br />8.00 <br />$175.00 <br />50.00 <br />7.00 <br />51,225.00 <br />38 <br />2573.530 <br />INLET PROTECTION (STRUCTURE W/O CASTING) <br />EACH <br />8.00 <br />.0.00 <br />5175.00 0.00 <br />50.00 <br />6.00 <br />$1,05000 <br />39 <br />2575.513 <br />MULCH MATERIAL <br />CY <br />36.00 <br />530.001 0 00 <br />50.00 <br />000 <br />50.00 <br />40 <br />SPEC <br />RAIN WATER GARDENS <br />EACH <br />4.00 <br />5800.00 <br />0.00 <br />50.00 <br />2.00 <br />51,600.00 <br />41 <br />SPEC <br />INLET SEDIMENT REMOVAL (VVIMCO) <br />EACH <br />16.00 <br />$100.00i <br />0.00 <br />MOO <br />8.00 <br />$800.00 <br />42 <br />SPEC <br />SEDIMENT REMOVAL BACKHOE <br />HR <br />200 <br />5140.00 <br />0.00 <br />50.00 <br />000 <br />50.00 <br />43 <br />SPEC <br />GRADATION TEST, CLASS 5 <br />EACH <br />1 00 <br />512560 <br />0.00 <br />50.00 <br />1.00 <br />5125.90 <br />44 <br />,„„ SPEC <br />PROCTOR TESI_CLASS 5 <br />EACH <br />1.00 <br />5138.60 <br />0.00 <br />50.00 <br />1.00 <br />$138 60 <br />45 <br />SPEC <br />PROCTOR TEST, CLASS 5 <br />EACH <br />2.00 <br />5138.60 <br />0.00 <br />50.00 <br />0.00 50.00 <br />46 <br />SPEC <br />DENSITY TEST, INPLACE <br />EACH <br />15.00 <br />596.20 <br />0.00 <br />50.00 <br />6.00 5277.20 <br />47 <br />SPEC <br />CONCRETE TESTING <br />EACH <br />6.00 <br />5145.20 <br />0.00 <br />50.00 <br />3.00 5435.60 <br />48 <br />SPEC <br />BITUMINOUS CORE DENSITY <br />EACH <br />12.00 <br />5100.00 0.00 <br />50.00 <br />7.95 5795 00 <br />SCHEDULE 5,0' SEXTANT AVENUE - TOTAL 50.00 <br />5120,967.17 <br />SCHEDULE 6.0 - LABORE ROAD <br />1 2021.501 MOBILIZATION LS 1.00 r 5230000 000 <br />2 2104.501 REMOVE CONCRETE CURB AND GUTTER . LF 270.00 53.00 000 <br />3 2231.604 BITUMINOUS PATCH SPECIAL SY 85.00 528.00 0.00 <br />4 2232301 MILL BITUMINOUS PAVEMENT (2' DEEP) SY 2,850.00 $3 00 0.00 50.00 2,420.00 57,260 00 <br />5 2350 501 TYPE SP WEAR COURSE MIXTURE TON 500.00 547.50 0.00 50.00 429.26 520,389.85 <br />6 2504 602 ADJUST VALVE 90X EACH 3.00 5200.00 0.00 50,009 3.00 5600.00 <br />2506 522 ADJUST FRAME,RING AND CASTING EACH 4.00 5350.00 0.00 50.00 8.00 52,800.00 <br />2531.501 CONCRETE CURB 8, GUTTER DESIGN 0618 05 27000 513.50 0 00 50.00 471.00 56,350.50 <br />2563.601 TRAFFIC CONTROL LS 1.00 5500.00 0.00 50,00 1.00 550000 <br />10 2564.603 4" SOLID LINE VVHITE - EPDXY L LE _110000 5(132 000 50.00 0.00 50.00 <br />11 2564.603 4" DOUBLE SOLID LINE YELLOW- EPDXY LF 0,600,00 5065 0,00, 5000 0.00 50.00 <br />50 .00 <br />50 .00 <br />50 .00 <br />1.00 <br />47100 <br />83.00 <br />52,200.00 <br />11,19 00 <br />92.324,00 <br />7 <br />8 <br />SCHEDULE 6.0 LABORE ROAD - TOTAL 50.00 543.845 35 <br />