17M
<br />rtEsts)ESCR)illasio.*H.*:,:H,
<br />::a.NGINA4:cowtRAcTHE:
<br />2018(2 TO QAI'E
<br />O000
<br />2
<br />3
<br />LE 0-SA AGE LA
<br />2021.501 MOBILIZATION
<br />2232501 MILT BITUMINOUS PAVEMENT (2' DEEpt
<br />2350.501 TYPE SP WEAR COURSE MIXTURE
<br />4 2504,602
<br />5 2506 522
<br />6 2563 601
<br />ADJUST VALVE BOX
<br />1.00 51,100001 0.00
<br />SY 1,800.00 53.00 0.00
<br />TON 300.00 0.00
<br />EACH 3.00 5200,00
<br />ADJUST FRAME, RING AND CASTING EACH TOG 5350.00 0.00
<br />6500.00 0,00
<br />TRAFFIC CONTROL LS 1.00
<br />SCHEDULE 7.0 - SAVAGE TARE (MILL AND OVERLAY) -- TOTAL
<br />50.00 1.00 _4.1j00.00
<br />50.00 1,999.00 55,043.00
<br />_40.00 271.21 512,882.48
<br />50.00 2 001_ 540000
<br />60.00 1.00 5350.00
<br />60.00 1.00 5500.00
<br />50 .00
<br />520,275 48
<br />- SCHEDULE 80 LITTLE CANADA ROAD
<br />SCHEDULE 9.0 - CITY HALL PARKING LOT
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />$1,500 00
<br />000
<br />50.001
<br />1.00
<br />51,500.00
<br />2
<br />2104,001
<br />vvictog_gao AND GUTTER
<br />LF
<br />230.00
<br />$3.00
<br />0,A
<br />____,__
<br />so.00 2som
<br />5680.00
<br />3
<br />2094409.
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />410.00
<br />52.00
<br />0 00
<br />_
<br />410.00,,,.,_9920,00
<br />2.00
<br />5750.00
<br />_2105.501
<br />COMMON EXCAVATION$4_
<br />CY
<br />150,00
<br />4414 0
<br />0.00
<br />__o_o.00
<br />S0.00
<br />155,00
<br />B4,701.00
<br />5
<br />2105.522
<br />_
<br />SELECT GRANULAR BORROW (CV)
<br />CY
<br />455.00
<br />515,50
<br />0.00
<br />50.00
<br />459,00
<br />54777.50
<br />6
<br />2105 604
<br />GEOTEXTILE FABRIC
<br />SY
<br />600.00
<br />52.50
<br />0.00
<br />Atop
<br />soup
<br />51,500.00
<br />7
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />94 _...2190
<br />CY
<br />5152
<br />0.00
<br />9,090____z499
<br />$0.00
<br />J3,941.61
<br />_8_
<br />2232.501 ,,
<br />MILLVT,OMINOUS PAVEMENT
<br />SY
<br />11500
<br />56.00
<br />0.00
<br />50.00
<br />$5,
<br />51,54998
<br />9
<br />! 2350.501
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />35 00
<br />$47.50
<br />0.00
<br />50.00
<br />_S§A,K
<br />3721
<br />_
<br />51,710.33
<br />10
<br />r2350.502
<br />TYPE SP NON WEARING COURSE MIXTURELBINDER)
<br />TON
<br />50 00
<br />545,00
<br />POO
<br />...__VVII
<br />45,I2
<br />..„.„__..61441924
<br />11
<br />2350402
<br />TYPE SP NON WEARING COURSE MIXTUREABASEI_
<br />TON
<br />60.00
<br />546.50
<br />0.00
<br />50.00
<br />55.00
<br />„ ,V,057.50
<br />12
<br />2502202
<br />4-INCH PERE PE PIPE DRAIN
<br />LF
<br />235,00
<br />$14,„00
<br />5,00
<br />50 00
<br />235,00
<br />53 220 00
<br />13
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN F1618
<br />LF
<br />230.00
<br />513,50
<br />SOO
<br />5000
<br />220.00,
<br />63JVVB
<br />14
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />51 50000
<br />000
<br />50.00
<br />1.00
<br />„
<br />51,50000
<br />15
<br />2564.603
<br />4" SOLID VVHITE LINE - EPDXY
<br />LF
<br />230.00
<br />6043
<br />0.00
<br />V.00
<br />0.00
<br />Sc000
<br />16
<br />2564.603
<br />d" SOLID YELLOW LINE - EPDXY
<br />F
<br />LL
<br />148:0. 000
<br />$0.33
<br />000
<br />50.00
<br />201040„
<br />566.33
<br />__17
<br />2564.603
<br />4" SKIP YELLOW LINE - EPDXY i
<br />F.
<br />t.0
<br />_ s0.33
<br />5,00
<br />65,00
<br />skop,
<br />_
<br />$13.20
<br />SCHEDULE 8.0 - LITTLE CANADA ROAD - TOTAL 60.00
<br />__
<br />530.760.53
<br />SCHEDULE 10,0 - COW MORRISON SANITARY
<br />1 SPEC REMOVE AND REPLACE 8" SANITARY LF
<br />2 SPEC 494IIARV WYE AND CONNECT TO EXISTING SERVICE EACH
<br />3 SPEC EROSION CONTROL SILT FENCE LF
<br />4 SPEC !WOOD MULCH BARRIER SY
<br />5 SPEC GRAVEL FOR ACCESS TON
<br />200.00
<br />7.00
<br />100.00
<br />14.00
<br />50.00
<br />$30 16
<br />5400.75
<br />55,00
<br />532.57
<br />59449
<br />0,00 50.00
<br />0,00 50.00
<br />194.00
<br />0,00 50.00
<br />0.00 60,00
<br />0.00 Sam
<br />55,851 04
<br />8.00 53,355.00
<br />0 00, 50 .00
<br />53.90 51,755 52
<br />16 251 5552 50
<br />SCHEDULE 16,0.0091 MORRISON SANITARY TOTAL 60.00 511,517.00
<br />SCHEDULE 9.0 - CITY HALL PARKING LOT
<br />1
<br />2021.501
<br />MOBILIZATFON
<br />LS
<br />1.00
<br />S5,200.00
<br />0.00
<br />50.00
<br />1.00
<br />55,200.00
<br />2
<br />2101.502
<br />CLEARING
<br />EACH
<br />200
<br />5375.00
<br />0.00
<br />50.00
<br />2.00
<br />5750.00
<br />3
<br />2101.507
<br />GRUBBING
<br />EACH
<br />2.00
<br />5375.00
<br />0.00
<br />50.00
<br />2.00
<br />5750.00
<br />4
<br />2104401
<br />EMOVE CURB AND GUTTER
<br />LF
<br />22s.00
<br />5220
<br />0.00
<br />50.00
<br />419.00
<br />S921.60
<br />5
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />1,985.00
<br />62.00
<br />0.00
<br />50.00
<br />1,985.00
<br />53,970.00
<br />6
<br />2104411
<br />AW CUT BITUMINOUS TULL DEPTH)
<br />LF
<br />35.00
<br />53.90
<br />0.00
<br />50.00
<br />11.00
<br />542.90
<br />7
<br />2105.501
<br />OMMON EXCAAVIOULF4)
<br />CY
<br />1,152.00
<br />58,50
<br />0.00
<br />$0.00
<br />969.00
<br />58,236.50
<br />8
<br />2105 521
<br />ELECT GRANULAR BORROW(CV)
<br />CY
<br />700,00
<br />510.00
<br />000
<br />$5,
<br />550.00
<br />55,500.00
<br />9
<br />2105.604
<br />GEOTEXTILE FABRIC
<br />SY
<br />2.050.00
<br />52.50
<br />0.00
<br />50.00
<br />1,650.00
<br />54,125.00
<br />10
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />TON
<br />925.00
<br />515.90
<br />0.00
<br />50.00
<br />684.64
<br />510,885.78
<br />11
<br />2232.501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />15.00
<br />520.00
<br />0.00
<br />50.00
<br />95.00
<br />51,900.00
<br />12
<br />2350001
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />270.00
<br />$47.50
<br />0.00
<br />50.00
<br />222.66
<br />510,576.35
<br />13
<br />2350.502
<br />TYPE SP NON WEARING COURSE MIXTURE CHASE)
<br />TON
<br />270.00
<br />546.50
<br />0.00
<br />50.00
<br />ois
<br />ss
<br />512 058.38
<br />Id
<br />2411.604
<br />MODULAR BLOCK RETAINING WALL
<br />I- SF
<br />180.00
<br />526.50
<br />16.00
<br />5456.00
<br />196.00
<br />55,586.00
<br />15
<br />2502.541
<br />-INCH PERF PE PIPE DRAIN
<br />LF
<br />1,300.00
<br />512.50
<br />0.00
<br />50.00
<br />942,00
<br />511,775.00
<br />16
<br />2503.541
<br />PVC STORM SEWER
<br />LF
<br />25.00
<br />540.80
<br />0.00
<br />60.00
<br />22.00
<br />5897.60
<br />17
<br />2503.541
<br />r_ID
<br />12" RC PIPE SEWER DES 3006,,,9I
<br />t.0
<br />23.00
<br />$40.80
<br />0.00
<br />00.00
<br />86.00
<br />51408.80
<br />18
<br />2503.602
<br />CCNNECT TO EXISTING STORM MAIN
<br />EACH
<br />2.00
<br />5359.04
<br />0.00 50.00
<br />3.00
<br />51077,12
<br />19
<br />2506.502
<br />. ONT DRAINAGE STRUCTURE SPECIAL 24" x 36''
<br />EACH „__:1.00
<br />$2,44.00
<br />0.00 50.00
<br />3.00
<br />$6,732.00
<br />20
<br />2506 502
<br />ONST DRAINAGE STRUCTURE SPECIAL (27' DIA)
<br />EACH 1.00
<br />52 C,AVVI
<br />0.00
<br />50.00
<br />1.00
<br />52,040.00
<br />AL
<br />2521.501
<br />CONCRETESLDEWAL K (4" THICK)
<br />SF 25.00
<br />54.00
<br />0001_
<br />$0.00
<br />60.00
<br />S240.00
<br />22
<br />2531.501
<br />CCNCRETE CURB & GUTTER DESIGN 9618
<br />V 225.00
<br />513.50
<br />0.00 50,00
<br />434.00
<br />55,859.00
<br />23
<br />2564402
<br />PAVEMENT MESSAGE (HANDICAPPED SYM) - EPDXY
<br />EACH 2.00
<br />5131 25
<br />0.00
<br />50.00
<br />5,60,
<br />50.00
<br />24
<br />2564.603
<br />4" SOLID WHITE LINE - EPDXY
<br />LF 1,000.00
<br />51.10
<br />0.00
<br />50.00
<br />0.00
<br />60.00
<br />25
<br />2573.502
<br />SILT FENCE TYPE MACHINE SLICED
<br />TF 50.00
<br />$2,50
<br />000
<br />5800
<br />10000
<br />$250.V
<br />26
<br />2573.530
<br />NTET PROTECTION (WIMCO)
<br />EACH
<br />3.00
<br />$175.00
<br />0,00
<br />50.00
<br />3.00
<br />5525.00
<br />27
<br />2575 513
<br />MULCH MATERIAL
<br />CY
<br />2.00
<br />530.00
<br />0.00
<br />60 .00
<br />0.00
<br />50.00
<br />28
<br />SPEC
<br />RAIN WATER GARDENS
<br />EACH
<br />1.00
<br />5900.00
<br />0.00
<br />0.00
<br />1.00
<br />$900.00
<br />20
<br />SPEC
<br />INLET SEDIMENT REMOVAL_SWIMSOL
<br />EACH
<br />6.00
<br />5100.00
<br />0.00
<br />SO 00
<br />1.50
<br />5150.00
<br />30
<br />SPEC
<br />DENSITY TEST,1NPTACE
<br />EACH
<br />10.00
<br />( 546.20
<br />0.00
<br />$0.00
<br />0.00
<br />SCHEDULE 9.0 - CITY HALL PARKING LOT -TOTAL 5456.00 5104.457.23
<br />SCHEDULE 10,0 - COW MORRISON SANITARY
<br />1 SPEC REMOVE AND REPLACE 8" SANITARY LF
<br />2 SPEC 494IIARV WYE AND CONNECT TO EXISTING SERVICE EACH
<br />3 SPEC EROSION CONTROL SILT FENCE LF
<br />4 SPEC !WOOD MULCH BARRIER SY
<br />5 SPEC GRAVEL FOR ACCESS TON
<br />200.00
<br />7.00
<br />100.00
<br />14.00
<br />50.00
<br />$30 16
<br />5400.75
<br />55,00
<br />532.57
<br />59449
<br />0,00 50.00
<br />0,00 50.00
<br />194.00
<br />0,00 50.00
<br />0.00 60,00
<br />0.00 Sam
<br />55,851 04
<br />8.00 53,355.00
<br />0 00, 50 .00
<br />53.90 51,755 52
<br />16 251 5552 50
<br />SCHEDULE 16,0.0091 MORRISON SANITARY TOTAL 60.00 511,517.00