Laserfiche WebLink
ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />OTT. UNIT PRICE <br />THIS PERIOD <br />0TV. TOTAL PRICE <br />TOTAL TO DATE <br />OTT, TOTAL PRICE <br />42 <br />2573.530 <br />INLET PROTECTION)WIMCO) <br />EACH <br />300 <br />590.00 <br />000 <br />50.00 <br />3.00 <br />5270.00 <br />43 <br />2573.530 <br />INLET PROTECTION (STRUCTURE 780 CASTING) <br />EACH <br />3.00 <br />550.00 <br />0.00 <br />50.00 <br />3.00 <br />5270.00 <br />44 <br />2523.602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />0.00 <br />53000 <br />0.00 <br />$0.00 <br />600 <br />5180.00 <br />45 <br />2573.607 <br />ROADWAY ROCK CHECK DAM <br />CY <br />30.00 <br />537.00 <br />0.00 <br />5000 <br />0.00 <br />50.00 <br />46 <br />2575.513 <br />MULCH 0.14108141. TYPE SPECIAL. <br />CY <br />10.00 <br />550.00 <br />0.00 <br />50.00 <br />10.00 <br />550000 <br />47 <br />2575,532 <br />FERTILIZER 5T1PE 24122 -24) <br />LBS <br />70,00 <br />50.50 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />48 <br />2575.553 <br />COMPOST GRADE2 <br />CY <br />20.00 <br />518.00 <br />0.00 <br />50.00 <br />10.00 <br />5180,00 <br />49 <br />25755.604 <br />SEEDING (TYPE 270) <br />SY <br />1.010.00 <br />51.00 <br />000 <br />50.00 <br />713.00 <br />571300 <br />50 <br />2575.607 <br />LANDSCAPE ROCK <br />CT <br />10.00 <br />545.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />51 <br />SPEC <br />GRADATION TEST <br />EACH <br />2.00 <br />595.00 <br />0.00 <br />5000 <br />1.00 <br />695.00 <br />52 <br />SPEC <br />PROCTOR TEST <br />EACH <br />4.00 <br />59500 <br />0.00 <br />5000 <br />1.00 <br />$95.00 <br />53 <br />SPEC <br />DENSITY TEST <br />EACH <br />000 <br />565.00 <br />0.00 <br />$0.00 <br />4.00 <br />526000 <br />Sh <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />AIR VOIDS TEST <br />EACH <br />EACH <br />0.00 <br />4.00 <br />565.00 <br />5150.00 <br />200 <br />1.00 <br />5130.00 <br />5150.00 <br />5.00 <br />100 <br />5325,00 <br />5150.00 <br />56 <br />SPEC <br />CONCRETE TESTING, MINCERS (SET OF 3) <br />EXTRACTION /GRADATION <br />EACH <br />EACH <br />2,00 <br />4.00 <br />5220.001 <br />5175.00 <br />0.00 <br />1.00 <br />50.00 <br />5175.00 <br />2.00 <br />100 <br />5440.00 <br />5175,00 <br />57 <br />SPEC <br />2105.501 <br />POND EXCAVATION (RAlI4WATER GAR DEN) <br />CY <br />2200 <br />522.00 <br />0 O <br />50.00 <br />12.00 <br />526400 <br />16 <br />SCHEDULE 2.0- BRYAN AVENUE - TOTAL 56,072.25 573.530.55 <br />SCHEDULE 3,0- IONA LANE <br />1 <br />2021,501 <br />MOBILIZATION <br />LS <br />100 <br />511400.00 <br />000 <br />50 OD <br />1,00 <br />511400.00 <br />2 <br />2101,502 <br />CLEARING <br />TREE <br />2.0D <br />.515000 <br />0.00 <br />$000 <br />1.00 <br />5150,00 <br />3 <br />2101507 <br />GRUBBING <br />TREE <br />200 <br />550.00 <br />000 <br />50,00 <br />200 <br />5100.00 <br />4 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />35.00 <br />5300 <br />0,00 <br />5000 <br />42,00 <br />5120.00 <br />5 <br />2104.501 <br />REMOVE SEWER PIPE(STORM). <br />LF <br />'54.00 <br />55,00 <br />000 <br />5000 <br />154.00 <br />5770.00 <br />6 <br />2104501 <br />REMOVE LANDSCAPE EDGER <br />IS <br />85.00 <br />5300 <br />000 <br />5000 <br />3800 <br />5114.00 <br />7 <br />2104.505 <br />REMOVE CONCRETE PAVEMENT <br />SY <br />14000 <br />53.00 <br />000 <br />50.00 <br />8100 <br />524300 <br />8 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />3600.00 <br />51.80 <br />0.00 <br />5000 <br />3,680,00 <br />56624.00 <br />9 <br />2104.500 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />3.00 <br />5250,00 <br />0.00 <br />50.00 <br />3.00 <br />5750.00 <br />10 <br />2104509 <br />RE MOVE HYDRANT AND VALVE <br />EACH <br />1.00 <br />53750D <br />0.00 <br />50.00 <br />100 <br />5375.00 <br />11 <br />2104,511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />LF <br />145.00 <br />53.00 <br />0.00 <br />50.00 <br />105.00 <br />5315.00 <br />12 <br />2104.513 <br />SAW CUT SITUMINOUS{FULL DEPTH) <br />LF <br />90.00 <br />52,25 <br />000 <br />50.00 <br />107,00 <br />524075 <br />13 <br />2104.523 <br />SALVAGE MAILBOX <br />EACH <br />1400 <br />52000 <br />0.00 <br />5000 <br />14.00 <br />5280.00 <br />14 <br />2105501 <br />COMMON EX0AVAT0004 (P) <br />CY <br />134112 <br />51000 <br />0.00 <br />50.00 <br />103000 <br />510.300.00 <br />15 <br />2105.501 <br />POND EXCAVATION (RAlI4WATER GAR DEN) <br />CY <br />2200 <br />522.00 <br />0 O <br />50.00 <br />12.00 <br />526400 <br />16 <br />2105.522 <br />SELECT GRANULAR 80000W (CVL <br />CY <br />1.300.00 <br />515.30 <br />003 <br />50.00 <br />1.82300 <br />527,89190 <br />17 <br />2105.525 <br />1096011 BORROW <br />CY <br />205.00 <br />5001 <br />52.00 <br />50.52 <br />372.00 <br />$3.72 <br />18 <br />2105.604 <br />GEOTEXTILE FABRIC <br />SY <br />372000 <br />52.00 <br />0.00 <br />50.00 <br />320700 <br />5641400 <br />19 <br />2123; 610. <br />EXPLORATORY DIGGING <br />(HOUR <br />12.00 <br />525000 <br />0.00 <br />1 .75 <br />5437.50 <br />20 <br />2131.502 <br />CALCIUM CHLORIDE <br />GAL <br />100000 <br />61.30 <br />000 <br />5000 <br />0.00 <br />50.00 <br />21 <br />2211.501 <br />AGGREGATE BASE CLASS 5, ROAD <br />TON <br />1.80000 <br />59.60 <br />0.0050.00 <br />155248 <br />_51;49036? <br />22 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />35.00 <br />55.00 <br />13.00 <br />565.00 <br />13.00 <br />565.00 <br />1 23 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />290.00 <br />567.50 <br />22080 <br />514.904.00 <br />220.80 <br />51490900 <br />24 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY) <br />TON <br />40,00 <br />580.00 <br />0.00 <br />50.00 <br />25 <br />2350.502 <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />400.00 <br />556.80 <br />0.00 <br />50.00 <br />36362 <br />520.65362 <br />20 <br />2502,541 <br />4" PERF PE PIPE DRAIN W /SOCK <br />L9 <br />2,275,00 <br />52.25 <br />000 <br />50.00 <br />1806.00 <br />54.003.50 <br />27 <br />2503541 <br />15" RC PIPE SEINER DES 3006 CLV <br />LF <br />9200 <br />524.00 <br />000 <br />5000 <br />92.00 <br />52,20800 <br />28 <br />3503.541 <br />18'80 PIPE SEWER 0E63006. CUB <br />LF <br />6100 <br />525.00 <br />0.00 <br />$0.00 <br />61.00 <br />61,586.00 <br />29 <br />2503.G02 <br />00NNECTT0 EXISTING STORM 6 <br />EACH <br />2.00 <br />5550.00 <br />0.00 <br />60,00 <br />2.00 <br />5110000 <br />30 <br />2503602 <br />CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />2.00 <br />6050.00 <br />0.0D <br />50.00 <br />3.00 <br />52,550.00 <br />31 <br />2504.602 <br />ADJUST VALVE BOX <br />EACH <br />2.00 <br />5200.00 <br />0,00 <br />50.00 <br />2.00 <br />5400.00 <br />32 <br />2504.602 <br />ADJUST CURB STOP BOX <br />EACH <br />2.00 <br />5100.00 <br />0.00 <br />5000 <br />0.00 <br />$0.00 <br />33 <br />2504.602 <br />INSTALL HYDRANT AND VALVE <br />EACH <br />1.00 <br />55.000.00 <br />0.00 <br />5000 <br />1,00 <br />85,000.00 <br />34 <br />2504,602 <br />6" GATE VALVE AND BOX <br />2.00 <br />52,400.00 <br />0.00 <br />50.00 <br />000 <br />5000 <br />35 <br />2506.502 <br />CONST DRAINAGE STRUCTURE 0650611 SPECIAL 24X36" <br />EACH <br />2.00 <br />51.20000 <br />0,00 <br />50,00 <br />200 <br />51400.00 <br />36 <br />2506502 <br />CONS' DRAINAGE STRUCTURE DESIGN 40.4020 <br />1.00 <br />6165000 <br />0.0D <br />5000 <br />100 <br />61,650.00 <br />37 <br />2506.622 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />3.00 <br />5475.00 <br />0.00 <br />50.00 <br />2.00 <br />5950.00 <br />2505.602 <br />RE CONSTRUCT DRAINAGE STRUCTURE <br />EACH <br />2.00 <br />51,050.00 <br />0.00 <br />30.00 <br />2.00 <br />52,100.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 6618 <br />LF <br />2.06500 <br />69.05 <br />0.00 <br />$0.00 <br />204500 <br />518.507.25 <br />2531.507 <br />CONCRETE DRIVEWAY APRON (6' THICK) <br />SY <br />140.00 <br />636.45 <br />0.00 <br />6000 <br />124.00 <br />54519.80 <br />2531507JCONCRETE <br />DRIVEWAY APRON (8'THICKj <br />SY <br />13,00 <br />547.70 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2531507 <br />CONCRETE DRIVEWAY PAVEMENT6 "THICK) <br />SY <br />14500 <br />03645 <br />0.00 <br />5000 <br />05.00 <br />53,462.75 <br />fl 2540.602 <br />INSTALL SALVAGED MAILBOX <br />EACH <br />14.00 <br />555.00 <br />00D <br />50.00 <br />1400 <br />5812.00, <br />4 <br />