|
ITEM
<br />N0.
<br />ITEM DESCRIPTION
<br />ORIGINAL CONTRACT
<br />UNIT 1 QTY. UNIT PRICE
<br />0105 PERIOD
<br />QTY. TOTAL PRICE
<br />TOTAL TO DATE
<br />QTY. TOTAL PRICE
<br />4i
<br />2540.603
<br />LANDSCAPE EDGER STEEL
<br />LF
<br />11000
<br />S5 C0
<br />0.00
<br />5000
<br />30.00
<br />5150.00
<br />45
<br />2540.603
<br />LANDSCAPE EDGER
<br />LF
<br />95.00
<br />SM1 00
<br />0.00
<br />50.00
<br />000
<br />50.00
<br />46
<br />2510.616
<br />INSTALL ROCK RETAINING WALL
<br />TRAFFIC CONTROL
<br />SP
<br />lS
<br />205.00
<br />1.00
<br />$20.00
<br />52]5.00
<br />0.00
<br />50.00
<br />136.00
<br />1.001
<br />53805.00
<br />5275.00
<br />47
<br />2563.601
<br />0.00
<br />50.00
<br />48
<br />49
<br />2573.502
<br />2573.520
<br />SILT FENCE, TYPE MACHINE 511000
<br />SEDIMENT REMOVAL 04010000
<br />„ -, Il_
<br />110005
<br />50.00
<br />5225
<br />0.00
<br />00.00
<br />7000
<br />0.00
<br />5157.50
<br />50.00
<br />000
<br />510000
<br />0.00
<br />50.00
<br />50
<br />51
<br />273630
<br />2573,530
<br />INLET PROTECTIDN5WIMCO) _
<br />INLET PROTECTION (STRUCTURE W/0 CASTING)
<br />EACH
<br />EACH
<br />500
<br />5.00
<br />590.00
<br />O00_
<br />50.00
<br />50.00
<br />0.00
<br />5.00
<br />$0_00
<br />5450.00
<br />59000
<br />0.00
<br />52
<br />2573.602
<br />INLET SEOIMENT REMOVAL
<br />64011
<br />6.00
<br />53000
<br />0.00
<br />60.00
<br />5.00
<br />515000
<br />53
<br />2673,602
<br />TEMPORARY ROCK CONSTRUCTION ENTRANCE
<br />64001
<br />t 00
<br />540000
<br />0,00
<br />50.00
<br />0.00
<br />50,00
<br />54
<br />2513.00]
<br />ROADWAY ROCK CHECK DAM
<br />CY
<br />3000
<br />53]00
<br />0,00
<br />5000
<br />240
<br />58800
<br />55
<br />2575513
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />0.00
<br />550.00
<br />000
<br />00.00
<br />2.00
<br />5100.00
<br />56
<br />57
<br />2575.532
<br />2575,550
<br />FERTILIZER(TYPE 241224).. ,._
<br />COMPOST GRADE 2
<br />...............
<br />GY
<br />12.00
<br />51800
<br />.00
<br />000
<br />50.00
<br />$0.00
<br />000
<br />5.0D
<br />5000
<br />59000
<br />58__.2575.504
<br />59
<br />2575.607
<br />SEEDING (TYPE 270)
<br />LANDSCAPE ROCK
<br />SY
<br />CY
<br />2050,00
<br />3.00
<br />51.00
<br />0.00
<br />50.00
<br />1.998.00
<br />51.99800
<br />54500
<br />0.00
<br />50.00
<br />0.00
<br />5000
<br />60
<br />SPEC
<br />GRADATION TEST
<br />EACH
<br />2.00
<br />595.00
<br />0,00
<br />50.00
<br />1.00
<br />59500
<br />61
<br />SPEC
<br />PROCTOR TEST
<br />EACH
<br />1.00
<br />59500
<br />000
<br />50.00
<br />2.03
<br />5100,00
<br />62
<br />SPEC
<br />001451711 TEST
<br />EACH
<br />0.00
<br />56500
<br />0.00
<br />50.00
<br />5,00
<br />537500
<br />63
<br />SPEC
<br />NUCLEAR BITUMINOUS DENSITY
<br />EACH
<br />600
<br />56500
<br />4.00
<br />526000
<br />600
<br />5390.00
<br />64
<br />SPEC
<br />AIR VOIDS TEST
<br />EACH
<br />4,00
<br />5150,00
<br />1.00
<br />515000
<br />2.00
<br />5300.00
<br />65
<br />SPEC
<br />CONCRETE TESTING. CYLINDERS (SET OF 3)
<br />EACI1
<br />4,00
<br />5220.00
<br />000
<br />50.00
<br />2.00
<br />5440.00
<br />6G
<br />SPEC
<br />EXTRACTION'GRAOATION
<br />EACH
<br />400
<br />5176.00
<br />1,00
<br />617500
<br />300
<br />535000
<br />L.
<br />SCHEDULE 30 -IONA LANE - TOTAL $15,55452 5179.957.99
<br />SCHEDULE 4.0- PARK STREET
<br />t
<br />2021 501
<br />MOBI1.17ATION
<br />LS
<br />1.00
<br />52,200.00
<br />0.00
<br />5000
<br />1,00
<br />62,200,00
<br />2
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />1,50000
<br />61,80
<br />511 00
<br />0;00
<br />0,00
<br />50.00
<br />50.00
<br />1,500.00
<br />0.00
<br />52,70000
<br />5000
<br />3
<br />2106621
<br />SALVAGE SIGN
<br />EACH
<br />1.00
<br />4
<br />2105.501
<br />COMMON EXCAVATIONLP1
<br />TOPSOIL SORROW
<br />CY
<br />CY
<br />440.00
<br />260.00
<br />51200
<br />50.01
<br />0,00
<br />0.00
<br />5000
<br />$000
<br />52500
<br />000
<br />5630000
<br />50,00
<br />5
<br />2105.525
<br />6
<br />2211,501
<br />AGGREGATE BASE CLASS 5. ROAD
<br />TON
<br />25000
<br />59.60
<br />0.00
<br />50.00
<br />44954
<br />54.305.98
<br />7
<br />2232 501
<br />MILL BITUMINOUS PAVEMENT
<br />5Y
<br />13000
<br />55.00
<br />0.00
<br />5000
<br />17,00
<br />505.00
<br />8
<br />2350501
<br />TYPE 611/4 WEAR COURSE MIXTURE
<br />TON
<br />200.00
<br />56750
<br />000
<br />5000
<br />178.36
<br />512039.30
<br />9
<br />2350,502
<br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />EACH
<br />250.00
<br />3,0D
<br />556.80
<br />547500
<br />0,0D
<br />50.00
<br />23530
<br />61366504
<br />10
<br />25000,522
<br />ADJUST FRAME AND RING CASTING
<br />0,00
<br />50.00
<br />300
<br />5142900
<br />i1
<br />2563601
<br />TRAFFIC CONTROL
<br />15
<br />100
<br />6125.00
<br />000
<br />5000
<br />1.00
<br />511500
<br />12
<br />11
<br />2564,602
<br />2573.502
<br />INSTALL SALVAGED SIGN
<br />SILT FENCE TYPE MACHINE SLICED
<br />04014
<br />LE
<br />100
<br />200.00
<br />565.00
<br />5225
<br />0.0D
<br />0.0D
<br />50.00
<br />50.00
<br />0.00
<br />0.00
<br />5000
<br />50.00
<br />14
<br />2573,530
<br />INLET PROTECTION (_WIMCO)
<br />TEMPORARY ROCK CONSTRUCTION ENTRANCE
<br />EACH
<br />EACH
<br />2.00
<br />1.00
<br />590.00
<br />0.00
<br />5000
<br />0.00
<br />50.00
<br />15
<br />2573.607
<br />640000
<br />000
<br />50.00
<br />0.00
<br />60.00
<br />16
<br />2573607
<br />ROADWAY ROOK CHECK DAM
<br />CY
<br />1000
<br />037.00
<br />0,00
<br />50.00
<br />0.00
<br />5000
<br />2575.537
<br />FERTILIZER (TYPE 24- 1221_1_
<br />L0S
<br />110.00
<br />50.50
<br />0.00
<br />50.00
<br />0,00
<br />50.00
<br />8
<br />19
<br />2575.604
<br />SPEC
<br />SEEDING(TYPc 2.70)
<br />SY
<br />EACH
<br />1,870.00
<br />$100
<br />0.00
<br />50.00
<br />0.00
<br />1,00
<br />_6900
<br />595.00
<br />GRADATION TEST
<br />100
<br />595.00
<br />0.00
<br />5900
<br />20
<br />SPEC
<br />PROCTOR TEST
<br />EACH
<br />2.00
<br />595.00
<br />000
<br />50.05
<br />000
<br />50.00
<br />21
<br />SPEC
<br />DENSITY TEST
<br />NUCLEAR BITUMINOUS DENSITY
<br />EACH
<br />EACH
<br />4.00
<br />565,00
<br />0.00
<br />50,00
<br />50,00
<br />7.00
<br />800
<br />513000
<br />5260.00
<br />22
<br />SPEC
<br />4.00
<br />565.00
<br />00D
<br />23
<br />SPEC
<br />AIR VOIDS TEST
<br />EACH
<br />000
<br />5150.00
<br />0.00
<br />50,00
<br />2.00
<br />530000
<br />24
<br />SPEC
<br />EXTRACTIONIGRAOATION
<br />EACH
<br />400
<br />517900
<br />000
<br />50.00
<br />2.00
<br />6350.00
<br />SCHEDULE 4.0- PARK STREET -TOTAL 50.00 84368082
<br />__
<br />1
<br />___
<br />7021501
<br />SCHEDULE 5.0- FIRE. 14AL.L PARKING LOT
<br />MOBILIZATION
<br />)))
<br />LE
<br />1,00
<br />5200000
<br />000
<br />50,00
<br />100
<br />5260000
<br />2
<br />2104505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />( 19000
<br />51.90
<br />0.00
<br />50.00
<br />19000
<br />5361,00
<br />3
<br />4
<br />2104.505
<br />2104.521
<br />REMOVE RETAINING WALL
<br />SY
<br />3000
<br />55.00
<br />0.00
<br />0.00
<br />50.00
<br />5000
<br />1800
<br />59000
<br />SALVAGE PENCE
<br />LF
<br />45,00
<br />5500
<br />5500
<br />577500
<br />5
<br />2105,501
<br />COMMON EXCAVATION/P)
<br />CY
<br />25,00
<br />52400
<br />0,00
<br />5000
<br />25.00
<br />560000
<br />6
<br />2105.525
<br />TOPSOIL BORROW
<br />CY
<br />25.00
<br />50.01
<br />000
<br />50.00
<br />2500
<br />5025
<br />7
<br />2211501
<br />AGGREGATE BASE CLASS 5, ROAD
<br />TON
<br />120.00
<br />5900
<br />0.00
<br />50.00
<br />3900
<br />5300.16
<br />0
<br />2232.501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />5000.
<br />55,00
<br />000
<br />50.00
<br />0,00
<br />5000
<br />5
<br />
|