My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-19-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
12-19-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 2:26:31 PM
Creation date
12/21/2011 2:15:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
➢ A question was asked on who is responsible for the homeowners irrigation <br />system during construction. Mr. Hanson said that it would be the contractor's <br />responsibility to salvage and reinstall the irrigation system. <br />There was a question on how far the impacts will be into the yards. Mr. Elfering <br />stated that it depends on what the street grades will be. However, since the new <br />curb and gutter will only be a couple inches higher than the existing curb, the <br />impacts will be minimal compared to some street reconstructions. <br />▪ A resident wondered if the low area in the street at the end of his driveway would <br />be corrected. Mr. Elfering replied that this low spot probably indicates a failure <br />in the subgrade and it would be corrected with the street reconstruction. <br />A question was brought forward wondering if the new street would still drain to <br />one side of the road. Mr. Elfering noted that the new street would be installed <br />with a crown, which would drain the water to both edges of the roadway. <br />➢ Rainwater gardens were discussed at great length. Mr. Elfering stated that <br />rainwater gardens are essentially a small pond that will hold 1 -2 feet of water for <br />a maximum of 48 hours. The gardens typically have an 8 -foot bottom, which <br />tapers into the homeowners yard at a gradual slope. If the slope would be too <br />steep the City would have a rock retaining wall installed to minimize impacts into <br />the yard. <br />➢ A resident wondered if the City had a list of contractors for the residents to use to <br />finish the water service connection to their house. Mr. Hanson indicated that the <br />City does not require a specific contractor but they could provide a list of <br />licensed contractors for the homeowners. He also mentioned that if multiple <br />residences joined together to hire a contractor that they could get a lower cost <br />since the contractor would be guaranteed more work in the same location. <br />➢ One resident had a question if he could run the water to his house but not make <br />the final connection. Mr. Hanson replied that this could he done as long as the <br />City water service is not hooked together with the private well. This would be a <br />violation of the Minnesota Department of Health code. <br />When asked if the project should move forward two property owners indicated "yes ", <br />and two indicated that they didn't need City water. <br />It was a consensus of those present that a survey should be sent out to allow all <br />property owners the opportunity to vote if the project should go forward or not. Mr. <br />Hanson will make and send out these surveys to all homeowners on Lakeside Court. <br />The Lakeside Court property owners were thanked for their participation. <br />- 1 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.