ITEM
<br />NO.
<br />ITEM DESCRIPTION
<br />UNIT
<br />ORIGINAL CONTRACT
<br />QTY. UNIT PRICE
<br />THIS PERIOD
<br />QTY. TOTAL PRICE
<br />TOTAL TO DATE
<br />QTY. TOTAL PRICE
<br />42
<br />SPEC
<br />SEDIMENT REMOVAL BACKHOE
<br />HR
<br />2,00
<br />$140.00
<br />0,00
<br />30.00
<br />0.00
<br />30.00
<br />43
<br />SPEC
<br />GRADATION TEST, CLASS 5
<br />EACH
<br />1.00
<br />312540
<br />0.00
<br />30.00
<br />1.00
<br />3125.40
<br />44
<br />SPEC
<br />PROCTOR TEST, CLASS 5
<br />EACH
<br />1.00
<br />3138.60
<br />0.00
<br />30.00
<br />1.00
<br />3138.60
<br />45
<br />SPEC
<br />PROCTOR TEST, CLASS 5
<br />EACH
<br />2.00
<br />$138.60
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />46
<br />SPEC
<br />DENSITY TEST, INPLACE
<br />EACH
<br />15.00
<br />346.20
<br />5.00
<br />5231.00
<br />6.00
<br />3277,20
<br />47
<br />SPEC
<br />CONCRETE TESTING
<br />EACH
<br />6.00
<br />$145.20
<br />2.00
<br />3290.40
<br />3.00
<br />$435.60
<br />48
<br />SPEC
<br />BITUMINOUS CORE DENSITY
<br />EACH
<br />12.00
<br />$10000
<br />795
<br />3795.00
<br />795
<br />3795.00
<br />SCHEDULE 5.0 SEXTANT AVENUE -- TOTAL 32,63640 3118.585.92
<br />SCHEDULE 6.0- LABORE ROAD
<br />1
<br />2021,501
<br />MOBILIZATION
<br />LS
<br />100
<br />$2,200,00
<br />0.00
<br />30.00
<br />100
<br />52,200,00
<br />2
<br />2104.501
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />270.00
<br />53.00
<br />0,00
<br />50.00
<br />471,00
<br />$1,413.00
<br />3
<br />2231.604
<br />BITUMINOUS PATCH SPECIAL
<br />SY
<br />85.00
<br />$28.00
<br />0.00
<br />50.00
<br />83.00
<br />$2324.00
<br />4
<br />2232,501
<br />MILL BITUMINOUS PAVEMENT (2' DEEP)
<br />SY
<br />2850.00
<br />53.00
<br />0.00
<br />$0.00
<br />2,420.00
<br />57,260.00
<br />5
<br />2350.501
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />500.00
<br />547.50
<br />0.00
<br />50.00
<br />429.26
<br />520.389.85
<br />3600.00
<br />6
<br />2504.602
<br />ADJUST VALVE BOX
<br />EACH
<br />3.00
<br />3200.00
<br />0.00
<br />50.00
<br />3.00
<br />7
<br />2506522
<br />ADJUST FRAME, RING AND CASTING
<br />EACH
<br />4.00
<br />5350,00
<br />0.00
<br />30.00
<br />8.00
<br />52,800.00
<br />8
<br />2531,501
<br />CONCRETE CURB & GUTTER DESIGN 8618
<br />LF
<br />270.00
<br />513.50
<br />0.00
<br />30.00
<br />471.00
<br />36,358.50
<br />9
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />3500.00
<br />0.00
<br />3000
<br />1.00
<br />$500.00
<br />10
<br />2564,603
<br />4' SOLID LINE WHITE - EPDXY
<br />LF
<br />3.200.00
<br />50.32
<br />0.00
<br />3000
<br />0.00
<br />30.00
<br />11
<br />2564.603
<br />4' DOUBLE SOLID LINE YELLOW - EPDXY
<br />LF
<br />1.600.00
<br />30.65
<br />0.00
<br />30.00
<br />0.00
<br />30.00
<br />SCHEDULE 6.0- LABORE ROAD- -TOTAL 30.00 343,845.35
<br />SCHEDULE 7.0 - SAVAGE LANE (MILL AND OVERLAY)
<br />1
<br />2021.501
<br />MOBILIZATION
<br />15
<br />1.00
<br />31,100.00
<br />0.00
<br />30.00
<br />1.00
<br />91,10000
<br />2
<br />2232501
<br />MILL BITUMINOUS PAVEMENT (2" DEEP)
<br />SY
<br />1,800.00
<br />$3.00
<br />0.00
<br />$0.00
<br />1,681.00
<br />35,04300
<br />3
<br />2350,501
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />300.00
<br />347.50
<br />000
<br />30.00
<br />271.21
<br />312 882.48
<br />4
<br />2504.602
<br />ADJUST VALVE BOX
<br />EACH
<br />3.00
<br />3200.00
<br />0.00
<br />$0.00
<br />2.00
<br />3400.00
<br />5
<br />2506.522
<br />ADJUST FRAME RING AND CASTING
<br />EACH
<br />1.00
<br />3350.00
<br />0.00
<br />30,00
<br />100
<br />3350.00
<br />6
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />3500.00
<br />0.00
<br />30.00
<br />1.00
<br />3500.00
<br />SCHEDULE 7.0- SAVAGE LANE (MILL AND OVERLAY) - -TOTAL 30.00 320,275.48
<br />SCHEDULE 8.0 LITTLE CANADA ROAD
<br />1
<br />2021,501
<br />NOBILIZATION
<br />LS
<br />1.00
<br />51 .500.00
<br />0,00
<br />50.00
<br />1,00
<br />$1,500.00
<br />2
<br />2104.501
<br />REMOVE CURB AND GUTTER
<br />IF
<br />230.00
<br />53.00
<br />0.00
<br />50.00
<br />230.00
<br />$690.00
<br />3
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />410.00
<br />32.00
<br />0.00
<br />30.00
<br />410.00
<br />5820.00
<br />4
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />CY
<br />155.00
<br />311.00
<br />0.00
<br />3000
<br />155.00
<br />31 705.00
<br />5
<br />2105,522
<br />SELECT GRANULAR BORROW (CV)
<br />CV
<br />455.00
<br />510.50
<br />0,00
<br />50.00
<br />455.00
<br />$4777.50
<br />6
<br />2105,604
<br />GEOTEXTILE FABRIC
<br />SY
<br />600.00
<br />5250
<br />0.00
<br />50.00
<br />600.00
<br />51,500.00
<br />7
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />TON
<br />290.00
<br />515.90
<br />0.00
<br />$0.00
<br />247.90
<br />53,941.61
<br />8
<br />2232.501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />115.00
<br />$6,00
<br />000
<br />50.00
<br />25833
<br />$1 549.98
<br />9
<br />2350.501
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />35.00
<br />347.50
<br />0.00
<br />$0.00
<br />37,27
<br />51 770.33
<br />10
<br />2350.502
<br />TYPE SP NON WEARING COURSE MIXTURE (BINDER)
<br />TON
<br />50.00
<br />546.50
<br />0.00
<br />50.00
<br />45.12
<br />52,09808
<br />11
<br />2350.502
<br />TYPE SP NON WEARING COURSE MIXTURE (BASE)
<br />TON
<br />60.00
<br />546.50
<br />0.00
<br />$0.00
<br />5500
<br />52,557.50
<br />12
<br />2502.602
<br />4 -INCH PERF PE PIPE DRAIN
<br />LF
<br />230.00
<br />514.00
<br />0.00
<br />$0.00
<br />230.00
<br />53,220.00
<br />13
<br />2531501
<br />LF
<br />23000
<br />513.50
<br />0.00
<br />$0.00
<br />226.00
<br />5305100
<br />CONCRETE CURB & GUTTER DESIGN B618
<br />14
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />51.500.00
<br />0.00
<br />50.00
<br />1.00
<br />$1,500.00
<br />15
<br />2564,603
<br />4" SOLID WHITE LINE - EPDXY
<br />LF
<br />230.00
<br />50.33
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />16
<br />2564.603
<br />4" SOLID YELLOW LINE - EPDXY
<br />LF
<br />180.00
<br />5033
<br />0.00
<br />50.00
<br />201.00
<br />566.33
<br />17
<br />2564.603
<br />4" SKIP YELLOW LINE - EPDXY
<br />LF
<br />40,00
<br />50.33
<br />0.00
<br />$0.00
<br />40.00
<br />513.20
<br />SCHEDULE 8.0- LITTLE CANADA ROAD - -TOTAL 50.00 530,760.53
<br />SCHEDULE 9.0 - CITY HALL PARKING LOT
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />55,200.00
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />2
<br />2101.502
<br />CLEARING
<br />EACH
<br />200
<br />5375.00
<br />0.00
<br />5000
<br />2.00
<br />5750.00
<br />3
<br />2101.507
<br />GRUBBING
<br />EACH
<br />2.00
<br />3375.00
<br />0.00
<br />$0.00
<br />0.00
<br />30.00
<br />4
<br />2104.501
<br />REMOVE CURB AND GUTTER
<br />LF
<br />225.00
<br />52.20
<br />0.00
<br />30.00
<br />0.00
<br />50.00
<br />5
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />1,98500
<br />52.00
<br />0.00
<br />50.00
<br />0,00
<br />50.00
<br />6
<br />2104.511
<br />SAW CUT BITUMINOUS (FULL DEPTH)
<br />LF
<br />35.00
<br />53.90
<br />0,00
<br />50.00
<br />0.00
<br />50.00
<br />7
<br />2105501
<br />COMMON EXCAVATION (P)
<br />CY
<br />1,152.00
<br />58,50
<br />000
<br />30.00
<br />0.00
<br />30.00
<br />8
<br />2105.521
<br />SELECT GRANULAR BORROW (CV)
<br />CY
<br />700,00
<br />510.00
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />9
<br />2105.604
<br />GEOTEXTILE FABRIC
<br />SY
<br />2,050.00
<br />$2.50
<br />0.00
<br />30.00
<br />0.00
<br />30.00
<br />10
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />TON
<br />925.00
<br />515.90
<br />0.00
<br />$0,00
<br />0.00
<br />50.00
<br />11
<br />2232,501
<br />MILL BITUMINOUS PAVEMENT
<br />SY
<br />15.00
<br />$20,00
<br />0.00
<br />30,00
<br />0.00
<br />50.00
<br />12
<br />2350.501
<br />TYPE SP WEAR COURSE MIXTURE
<br />TON
<br />270.00
<br />547.50
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />13
<br />2350.502
<br />TYPE SP NON WEARING COURSE MIXTURE LEASE)
<br />TON
<br />270.00
<br />546.50
<br />0.00
<br />50.00
<br />0.00
<br />00.00
<br />
|