Laserfiche WebLink
ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />14 <br />2411.604 <br />MODULAR BLOCK RETAINING WALL <br />SF <br />180.00 <br />528.50 <br />0.00 <br />30.00 <br />0.00 <br />30.00 <br />15 <br />2502.541 <br />4 -INCH PERF PE PIPE DRAIN <br />LF <br />1.30000 <br />312.50 <br />0.00 <br />30.00 <br />0.00 <br />30.00 <br />16 <br />2503541 <br />10" PVC STORM SEWER <br />LF <br />25,00 <br />$40.80 <br />0.00 <br />$0.00 <br />0.00 <br />30.00 <br />17 <br />2503.541 <br />12" RC PIPE SEWER DES 3006. CLV <br />LF <br />23.00 <br />540.80 <br />0.00 <br />30.00 <br />0.00 <br />30.00 <br />18 <br />2503,602 <br />CONNECT TO EXISTING STORM MAIN <br />EACH <br />2.00 <br />$359.04 <br />0.00 <br />30.00 <br />0,00 <br />$0.00 <br />19 <br />2506.502 <br />CONST DRAINAGE STRUCTURE SPECIAL 24 "x36" <br />EACH <br />1.00 <br />32,244.00 <br />0.00 <br />30.00 <br />0.00 <br />$000 <br />20 <br />2506.502 <br />CONST DRAINAGE STRUCTURE SPECIAL (27" DIA) <br />EACH <br />1.00 <br />32,040.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />21 <br />2521.501 <br />CONCRETE SIDEWALK (4" THICK) <br />50 <br />25.00 <br />34.00 <br />0.00 <br />30.00 <br />0.00 <br />50.00 <br />22 <br />2531,501 <br />CONCRETE CURB & GUTTER DESIGN 6618 <br />LF <br />225.00 <br />313.50 <br />0.00 <br />30.00 <br />0,00 <br />50.00 <br />23 <br />2564.602 <br />PAVEMENT MESSAGE (HANDICAPPED SYM) - EPDXY <br />EACH <br />2.00 <br />5131.25 <br />0,00 <br />50.00 <br />0.00 <br />30.00 <br />24 <br />2564.603 <br />4" SOLID WHITE LINE - EPDXY <br />LF <br />1.000.00 <br />51.10 <br />0.00 <br />30.00 <br />0.00 <br />$0.00 <br />25 <br />2573.502 <br />SILT FENCE TYPE MACHINE SLICED <br />LF <br />50.00 <br />52.50 <br />0.00 <br />50.00 <br />0.00 <br />30.00 <br />26 <br />2573.530 <br />INLET PROTECTION (WIMCO) <br />EACH <br />3.00 <br />317500 <br />0.00 <br />$0.00 <br />0,00 <br />30.00 <br />27 <br />2575.513 <br />MULCH MATERIAL <br />CY <br />2.00 <br />530.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />28 <br />SPEC <br />RAIN WATER GARDENS <br />EACH <br />1,00 <br />5900.00 <br />0.00 <br />50.00 <br />0.00 <br />30.00 <br />29 <br />SPEC <br />INLET SEDIMENT REMOVAL (WIMCO) <br />EACH <br />6.00 <br />5100.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />30 <br />SPEC <br />DENSITY TEST, INPLACE <br />EACH <br />10.00 <br />546.20 <br />0.00 <br />50.00 <br />0.00 <br />30.00 <br />SCHEDULE 9.0- CITY HALL PARKING LOT- -TOTAL $0.00 3750.00 <br />SCHEDULE 10.0 - CO51 MORRISON SANITARY <br />1 <br />SPEC <br />REMOVE AND REPLACE B- SANITARY <br />LF <br />200.00 <br />330.16 <br />0.00 <br />30.00 <br />194.00 <br />$5.851.04 <br />2 <br />SPEC <br />SANITARYWYE AND CONNECT TO EXISTING SERVICE <br />EACH <br />7.00 <br />$419 ,75 <br />0.00 <br />30.00 <br />8.00 <br />$3,358.00 <br />3 <br />SPEC <br />EROSION CONTROL SILT FENCE <br />LF <br />100.00 <br />36.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />4 <br />SPEC <br />WOOD MULCH BARRIER <br />SY <br />14.00 <br />$32.57 <br />0.00 <br />30.00 <br />53.90 <br />$1 755.52 <br />5 <br />SPEC <br />GRAVEL FOR ACCESS <br />TON <br />50.00 <br />534.00 <br />0.00 <br />30.00 <br />16.25 <br />5552.50 <br />SCHEDULE 10.0 COpi MORRISON SANITARY - -TOTAL 30.00 $11,517.06 <br />SCHEDULE 11.0 . CO1.12 ROSE LANE SUBGRADE CORRECTION <br />1 <br />2105.501 <br />COMMON EXCAVATION <br />CY <br />517.00 <br />$8.50 <br />330.00 <br />32.805.00 <br />33000 <br />52,805.00 <br />2 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />961.00 <br />$9.95 <br />612.87 <br />56,098.06 <br />612.87 <br />56098.06 <br />SCHEDULE 10.0 CON( MORRISON SANITARY •• TOTAL 58,90306 58,903.06 <br />SCHEDULE 1.0 RUTH STREET <br />SCHEDULE 2.0 ROSE LANE <br />SCHEDULE 3.0 MORRISON STREET <br />SCHEDULE 4.0 SAVAGE LANE <br />SCHEDULE 5.0 SEXTANT AVENUE <br />SCHEDULE 6.0- LABORE ROAD <br />SCHEDULE 7.0 • SAVAGE LANE (MILL AND OVERLAY) <br />SCHEDULE 0.0 LITTLE CANADA ROAD <br />SCHEDULE 9.0 • CITY HALL PARKING LOT <br />SCHEDULE 10.0 - C081 MORRISON SANITARY <br />SCHEDULE 11.0 - C0 42 ROSE LANE SUBGRADE CORRECTION <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />3153.011.02 <br />570.925.96 <br />$47,207.36 <br />$2,254.40 <br />52,636 40 <br />30.00 <br />$0.00 <br />90.00 <br />30.00 <br />30.00 <br />38,903.06 <br />$284,938.19 <br />5253,272.48 <br />3157,545.10 <br />3103,81205 <br />3102.406.03 <br />3118,585.92 <br />$43,845.35 <br />320,275.48 <br />330,760.53 <br />5750.00 <br />511.517.06 <br />58,903.06 <br />3851,673.05 <br />TOTAL THIS PERIOD <br />TOTAL TO DATE <br />AMOUNT EARNED <br />5284938.19 <br />3851,673.05 <br />AMOUNT RETAINED <br />514,24691 <br />$42,583.65 <br />MATERIAL ON SITE <br />30.00 <br />$0.00 <br />MATERIAL DEDUCT. <br />$0.00 <br />$0.00 <br />PREVIOUS PAYMENTS <br />5538,398.12 <br />AMOUNT DUE <br />5270,691.28 <br />3270,69128 <br />5253,272.48 <br />3157,545.10 <br />3103,81205 <br />3102.406.03 <br />3118,585.92 <br />$43,845.35 <br />320,275.48 <br />330,760.53 <br />5750.00 <br />511.517.06 <br />58,903.06 <br />3851,673.05 <br />