My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-2006 Council Agenda
>
City Council Packets
>
2000-2009
>
2006
>
04-12-2006 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 3:01:41 PM
Creation date
3/29/2012 9:44:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Preserve <br />Development Contract <br />13. WAC, SAC, and park dedication fees, in effect at the time of application for each <br />building permit, shall become due with the issuance each building permit. <br />14. The Developer, upon execution of this Contract, will deposit with the City five <br />thousand dollars ($5,000), from which any and all costs and expenses incurred by the City, in <br />any way related to this Contract, including, but not limited to, planning and engineering fees, <br />legal fees, City staff time, cost of acquisition of any easements, shall be paid. Cost for City staff <br />time expended in conjunction with this Contract are expected to equal two and one half percent <br />(2.5 %) of the construction cost involved in the Contract. Said fee can be increased or reduced in <br />the sole discretion of the City, should staff time required vary dramatically from this estimate. <br />This provision is consistent with an agreement between the City and Developer, dated May 24, <br />2002, which is attached hereto and incorporated herein as Exhibit B. Said deposit is in addition <br />to any amounts due or owed pursuant the agreement referenced in Exhibit B. <br />Engineering <br />15. The Developer shall cause to be constructed, at its cost and its own risk, the <br />Grading and Drainage Improvements according to City standards. All of the Grading and <br />Drainage Improvements shall be approved by the City and shall be consistent with the approved <br />Final Plat and the Grading, Drainage, Erosion Control, and Landscaping Plans as revised and <br />dated January 17, 2006. A copy of said plans are attached hereto and incorporated herein as <br />Exhibit C. The Developer also agrees to adhere to all terms and conditions as set forth by the <br />Ramsey - Washington Metro Watershed District (RWMWD) Permit #05 -43, a copy of which is <br />attached hereto as Exhibit D. <br />18. Developer or their agents or assigns, shall comply with all provisions of the SWP <br />including but not limited to keeping the public streets clear of any soil, earth or debris resulting <br />from work done by Developer or their agents or assigns. Any such materials must be promptly <br />removed and in no event shall they be present more than 24 hours after placement. Failure to <br />_5_ <br />- 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.